logo
After SBI Kannada Row, Bengaluru Founder Plans To Relocate Office To Pune

After SBI Kannada Row, Bengaluru Founder Plans To Relocate Office To Pune

NDTV23-05-2025

A Bengaluru-based tech founder has decided to move his company's office to Pune within six months. The reason: the ongoing "language nonsense."
"If this language nonsense is to continue, I do not want my non-Kannada speaking staff to be the next 'victim'," entrepreneur Kaushik Mukherjee wrote on X.
He said the decision stemmed from concerns raised by his employees, adding he "agreed to their [point of view]."
Today I took a decision to wind up our Bangalore office in the next 6 months and move it to Pune. If this language nonsense is to continue, I do not want my non Kannada speaking staff to be the next "victim".
This idea was mooted by the staff themselves.
I agreed to their POV. https://t.co/M9abD2OYOD
— Kaushik Mukherjee ???????? (@kush07) May 22, 2025
This came after a recent incident at an SBI branch in Bengaluru's Chandapura area, where a manager refused to speak in Kannada with a customer, saying, "This is India, I'll speak Hindi, not Kannada."
The video of the interaction went viral, drawing sharp criticism from Kannada activists and political leaders alike.
Kaushik Mukherjee's post was in response to Bengaluru South MP Tejasvi Surya, who earlier shared the video and called the manager's conduct "not acceptable."
"If you are doing customer interface work in Karnataka, especially in a sector like banking, it is important to communicate to customers in the language they know," Mr Surya wrote.
He spoke of his long-standing demand that banks and other public-facing institutions in Karnataka ensure that local-language-speaking staff are posted.
Karnataka Chief Minister Siddaramaiah also weighed in on the SBI incident, calling the manager's behaviour "strongly condemnable" and urging the Union Finance Ministry to implement cultural and language sensitivity training for banking staff nationwide.
The manager has since been transferred, and both the bank and the manager have issued apologies.
The manager, in a statement in Kannada, promised to be more sensitive in future dealings with customers.
According to the Kannada Development Authority (KDA), there has been a growing trend of non-Kannadigas being posted in public-facing roles in banks. This, the KDA says, is creating a disconnect with local citizens who expect services in their mother tongue. As per Reserve Bank of India norms, all banks are mandated to provide services in English, Hindi, and the regional language.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Oppn demands Shinde's resignation over scrapped MMRDA tender process
Oppn demands Shinde's resignation over scrapped MMRDA tender process

Hindustan Times

time38 minutes ago

  • Hindustan Times

Oppn demands Shinde's resignation over scrapped MMRDA tender process

MUMBAI: Following the decision of the Mumbai Metropolitan Region Development Authority (MMRDA) to scrap the controversial tender process for the Thane-Ghodbunder-to-Bhayandar twin tunnels and elevated road projects, opposition parties targeted deputy chief minister Eknath Shinde, who has been heading the urban development department that governs MMRDA. Pointing out that he was first to raise the issue of the controversial tender process, Shiv Sena (UBT) leader Aaditya Thackeray on Saturday demanded the removal of Shinde from the state cabinet and a probe by the Economic Offences Wing (EOW) or the Enforcement Directorate (ED) into the entire episode. In July last year, MMRDA had issued a notice, inviting tenders for two public infrastructure projects. The first was the Road Tunnel project (Gaumukh to Fountain Hotel junction on the Thane-Ghodbunder Road), which envisaged 5-kilometre-long twin tunnels of 14.6-metre diameter at a cost of ₹8,000 crore. The second project was the construction of a 9.8-km-long elevated road over Vasai Creek. Larsen & Toubro (L&T), which was the lowest bidder, recently approached the Supreme Court saying that MMRDA had arbitrarily declared the Hyderabad-based Megha Engineering and Infrastructure Ltd (MEIL) as L1 (lowest) bidder for both the projects, despite its bid being higher than L&T's. The Supreme Court raised questions on the process, and on Friday, MMRDA told the court that the tender has been scrapped, and new tenders would be floated for these projects. 'I was the first to raise my voice over the tender process for the two projects in October 2024,' said Aaditya. 'With MMRDA scrapping the tender, it has been confirmed that there were irregularities, and the project was pushed ahead with an eye on the assembly elections.' Aaditya said that MMRDA, under Eknath Shinde, had floated a short-duration tender of only 20 days. 'This was done when Shinde was the chief minister and also the urban development minister,' he said. 'There was an irregularity at every step of the tender process. This was not possible unless approved by those who were handling the department. Therefore, Shinde should be removed from the position immediately.' Aaditya said that CM Devendra Fadnavis kept claiming from time to time that he was giving Maharashtra a clean administration. 'If Fadnavis is serious, there should be a probe of the tender issue by the EOW or ED,' he said. 'As Shinde is involved in the matter, he should be removed from the post of deputy CM and cabinet minister to ensure a transparent probe.' Maharashtra Congress chief Harshvardhan Sapkal alleged that the controversial tender was a ₹3,000-crore scam. 'MMRDA has cancelled the tender but the matter does not end here,' he said. 'This is a matter of deep-rooted corruption.' Sapkal declared that Fadnavis and Shinde had created a 'corruption corridor' in the state involving agencies like MMRDA, MHADA, CIDCO and SRA, and demanded a judicial probe into all major infrastructure projects taken up during the tenure of the two Mahayuti governments.

US Envoy Calls Hamas Answer to Truce Proposal ‘Unacceptable'
US Envoy Calls Hamas Answer to Truce Proposal ‘Unacceptable'

Mint

timean hour ago

  • Mint

US Envoy Calls Hamas Answer to Truce Proposal ‘Unacceptable'

Hamas said it submitted a response to the US proposal for a truce in Gaza, but Trump administration envoy Steve Witkoff quickly dismissed it as 'totally unacceptable.' 'Hamas should accept the framework proposal we put forward,' Witkoff said Saturday in a post on X. He added that further talks on a truce 'can begin immediately this coming week.' The key differences between the US proposal and Hamas's response appeared to be the duration of any truce and the extent to which Israeli forces withdraw. Hamas responded earlier in the day to the US proposal with changes that aimed 'to achieve a permanent ceasefire, a comprehensive withdrawal from the Gaza Strip, and ensure the flow of aid to our people and our families in the Strip.' As part of the agreement, Hamas said in a statement it would release 10 living Israeli prisoners and return 18 bodies, in exchange for an agreed-upon number of Palestinian prisoners, according to the statement. The group didn't specify whether it was accepting or rejecting the proposal. Israel had earlier accepted the US ceasefire proposal for Gaza, which Witkoff said on social media involved a 60-day ceasefire and the release of half the living hostages and half of the dead ones. Israeli officials familiar with the matter said the proposal would also restore United Nations-led aid distribution to the Palestinian territory. Hamas, which is designated a terrorist organization by the US, European Union and many other countries, is seeking amendments to some points, including the timing of the hostage release, delivery of aid and withdrawal of Israeli forces, the Associated Press reported, citing an unidentified official. An earlier ceasefire ended in mid-March and talks over a new truce have stalled as Hamas has insisted on a full Israeli withdrawal from Gaza, while the Israeli government wants the group to disarm and disband. International pressure to halt the protracted war has grown as the humanitarian crisis worsened in Gaza. Relief agencies say more than 2 million civilians in the ruined coastal enclave have been brought to the brink of famine by Israel's 11-week blockade. While food deliveries resumed this week under the auspices of a Swiss-based nonprofit Gaza Humanitarian Foundation, the rollout has been dogged by delays and chaos. While it's unclear whether Israel will accept any new conditions or amendments to the US proposal, at least some members of Prime Minister Benjamin Netanyahu's government expressed optimism over the prospects for a truce. Speaking to Channel 12 TV on Saturday following reports of the Hamas response, Israeli Energy Minister Eli Cohen, a member of Netanyahu's security cabinet, said: 'I assess that time is not on the side of Hamas, and therefore that it will ultimately agree to the Witkoff proposal.' With assistance from Dan Williams. This article was generated from an automated news agency feed without modifications to text.

Thiruvananthapuram corporation rolls out high-tech drain cleaner
Thiruvananthapuram corporation rolls out high-tech drain cleaner

Time of India

timean hour ago

  • Time of India

Thiruvananthapuram corporation rolls out high-tech drain cleaner

Thiruvananthapuram: In a major push to modernize urban sanitation, the city corporation has added two state-of-the-art jetting-suction machines to its cleaning fleet. The G-Mammoth Four-in-One machines are aimed at improving the cleaning of open drains, septic tanks, sewage pits, and manholes with enhanced efficiency and safety. Tired of too many ads? go ad free now The civic body purchased the machines developed by Thiruvananthapuram-based startup Genrobotics Innovations Pvt Ltd. Funded under the Union govt's Atal Mission for Rejuvenation and Urban Transformation scheme, the machines have already been deployed to provide quick and effective results, while a third unit is currently in development. Vimal Govind MK, co-founder of Genrobotics Innovations, said it took one and a half years to develop this equipment customized for the city. "The technology is based on our flagship product Bandicoot, which is used for cleaning manholes without depending on manual labour. This upgraded version integrates four key functions to make the cleaning process faster and safer," he said. A senior corporation official said the machines would be especially useful during the monsoon to clear clogged canals and drains. "This is a milestone in our mission for a cleaner, healthier Thiruvananthapuram. The machines are proving to be highly effective in removing clogged waste quickly," the official added. Each G-Mammoth unit is equipped with a high-pressure jetting system that uses powerful water streams to dislodge blockages in drainage systems. The automatic grabber simplifies the removal of solid waste from narrow or congested areas, reducing the need for manual intervention in hazardous environments. The machines also feature a robust suction system to extract sludge and transfer it into a 6,000-litre storage tank, ensuring safe disposal. Tired of too many ads? go ad free now An integrated inspection unit with a camera enables real-time internal monitoring, especially within manholes, improving operational oversight and worker safety. Similar machines were tested successfully in Kochi, known for severe waterlogging and proved effective in tackling the issue. Each unit costs between Rs 70 lakh and Rs 80 lakh and is operated by two trained personnel from Genrobotics. Cleaning operations typically take between 15 to 45 minutes, depending on the site.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store