
Cardiff Bus Interchange closes for urgent repairs
A bus station which took nine years to be built has been closed for urgent repairs. Cardiff Transport Interchange was built to replace the bus station which was demolished in 2015 but delays meant it did not open until June 2024.Transport for Wales (TfW) said it would be closed while repairs were carried out to the building's internal sprinkler system.TfW said all services scheduled to run from the station would operate from an alternative location.
On its website, Cardiff Bus said services 92, 93, 94 and 95 would additionally stop at The Philharmonic in Cardiff city centre and service 305 would also stop at Canal Street.Newport Bus said its number 30 service would start and finish at Customhouse Street stop. A notice posted by TfW on X stated the 122/124 Stagecoach service would be stopping at the Esso garage on Cathedral Road and First Bus services X2, 304 and 320 will be stopping at Westgate Street.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BBC News
30 minutes ago
- BBC News
Concerns raised over proposals for new bio-fuelling site for HGVs
A local councillor is opposing plans to build a bio-fuel filling station for lorries in Wiltshire, raising concerns over traffic, flooding, and the potential environmental Borough Council's planning officers have recommended the approval of a bio-compressed natural gas refuelling station for heavy goods vehicles (HGVs) on Purley Road, near proposal has faced resistance from Wanborough and Liddington parish councils, several residents and ward councillor Gary Sumner."We have a duty to conserve and protect the area of outstanding natural beauty on the national landscape and this is riding roughshod over that," said Mr Sumner. CNG Fuels wants to build a refuelling station that would operate around the clock, the Local Democracy Reporting Service station would have 12 bays for HGVs, fuel dispenser islands, a plant compound, two electric vehicle parking spaces and newly-surfaced proposed site lies within the North Wessex Downs National Landscape and has previously been used for a temporary compound, but Mr Sumner said this does not justify it becoming a permanent site."The principle of turning what is in reality greenfield land, which had a temporary use as a compound, into an industrial axle fuelling station within a national landscape is still wrong," he said. He also raised concerns about flooding and requested the application be called in for full committee Fuels has argued the facility aligns with the UK's strategy to reduce its greenhouse gas emissions to net zero by firm said the biomethane on offer at the station was "100% renewable" gas produced from food, water and animal waste and would provide a "sustainable" fuel for freight wetlands, new trees and other landscape features would also reduce the site's environmental impact, CNG Fuels officers who recommended the application be approved said the support the site would provide for "local and national" net zero strategies are "in the public interest" and "outweigh" the disadvantages of it being located in the countryside and national landscape.


BBC News
30 minutes ago
- BBC News
Primary school near Matlock sets up pop-up pool in playground
Children at a Derbyshire primary school have been having a splashing time enjoying a pop-up swimming pool set up in their Primary near Matlock has installed a pool for children to take two-week intensive swimming lessons have been arranged for every child from Reception to Year of school Laura Duncker Brown said: "Historically only Reception to Year 2 would swim, whereas this has meant the Juniors can really work on their skills - it's brilliant for all of them." She said the programme inside the 10m-x5m heated, marquee-covered pool included water safety alongside regular swimming lessons. "Generally you do lessons at a leisure centre. The cost of transport is rising and that's making it really difficult for a lot of schools," she said."This is actually quite cost-effective, the children are getting to swim so much more, and all the children are getting to swim."The Pool2School initiative is run by Nottingham-based Next Level Sports for schools across Derbyshire and instructor Josh Kynoch said: "Usually we have between 10-12 kids in the pool at a time, so really small groups and intensive lessons, it's nice and fun." Children at the Brassington school have said how much they have enjoyed having the temporary pool on their Finley said: "It's really warm, not very crowded, it's just really nice."His sister Holly said the pool was "ten out of ten".


BBC News
31 minutes ago
- BBC News
Compton Dundon church bells to ring for first time in 90 years
A set of Somerset church bells which have been silent for most of the past century are set to ring once bell mechanism at St Andrew's Church, in Compton Dundon, fell into disrepair in the 1900s and, by 1935, the bells themselves were 'hung dead' in a fixed position facing meant it was only possible to ring the bells using a hammer to hit their sides, and so they instead fell now, after a six-year campaign by villagers to raise £160,000, the bells have been brought back to life and will ring at a service later. "I think they weren't rung much after World War Two, and within living memory they haven't been rung at all," said Somerset architect Mark Taylor, who designed the new fixtures in the bell tower."The oldest bell dates from 1630, and there's no reason we won't get another 400 years out of it," he added. The project saw five of the church's bells restored while two others were acquired from former churches in Lancashire and two oldest, from 1630 and 1668, were originally cast in the village by local family the Austens.A seventh bell in the church has been turned into a clock chime, after it was found to be "not so in tune with the others", Mr Taylor said. Judy Skelding, chair of the bell appeal committee, said the group had been fundraising since 2019."Once the bells stopped ringing, people just got used to them not sounding," she said. The group raised the money through a variety of sponsored events and applications for grant funding."People have been so supportive and have enjoyed the fact we are restoring part of the village tradition."We've had a lovely response from people who have never rung bells in the village and are now learning to do so," Ms Skelding bells will ring later, and dedicated in a service by The Bishop of Bath and Wells, the Right Reverend Michael Beasley.