
GHMC to build twin three-lane flyovers at Kukatpally ‘Y' junction
The Rs 180 crore project will be executed under the Engineering, Procurement and Construction (EPC) model and is part of the Hyderabad City Innovative and Transformative Infrastructure (H-CITI) initiative, aimed at easing traffic congestion and improving urban connectivity.
The state government granted administrative sanction in December 2024 and permitted the GHMC to invite tenders. Bids have been called for the Kukatpally 'Y' and IDL lake junctions flyovers. The scope includes standard and obligatory viaduct spans with sacrificial shuttering, reinforced soil (RE) and RCC toe walls, crash barriers, friction and approach slabs, anti-carbonation coating on exposed concrete, safety view barriers, overhead gantries, landscaping below the viaduct, electrification, signages, road studs, drainage connections and utility shifting.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
24 minutes ago
- Time of India
MapmyIndia to invest Rs 25 crore in Zepto
Synopsis MapmyIndia will invest Rs 25 crore in Zepto for a 0.0490% stake, valuing the quick commerce startup at Rs 51,000 crore. This investment is part of a larger $250-million secondary deal aimed at increasing Indian ownership and streamlining the company's cap table before its planned public listing.


Time of India
24 minutes ago
- Time of India
JSW Cement to triple capacity to 60 million tonnes a year, aims to be among top-5 players
Synopsis JSW Cement's Rs 3,600-crore IPO has opened, with plans to triple manufacturing capacity to 60 MTPA. Managing Director Parth Jindal said the company may tap capital markets for funding. The IPO received 29% subscription on day one. JSW Cement aims to be among the top five players post-expansion, leveraging internal accruals and potential stake dilutions for faster growth and acquisitions.


Indian Express
24 minutes ago
- Indian Express
Mumbai's first ever public gymkhana to come up at Fort, BMC floats Rs 33-crore tender
The Brihanmumbai Municipal Corporation (BMC) on Thursday floated a Rs 33-crore tender for constructing a Townhall Gymkhana at the Fort area. This will be the first ever gymkhana in Mumbai accessible for common citizens unlike the existing ones which allow only exclusive members. The project will be initiated as per Engineering, Procurement and Construction (EPC) model which means that a single contractor will be appointed by the authorities who will be responsible for planning, construction as well as maintenance of the plot. The gymkhana is being constructed by redeveloping an existing recreation facility that was known as the BMC's Krida Bhavan, which was an exclusive indoor recreation facility for the civic employees. However, this structure remained underused and over the time fell into a dilapidated state, following which the BMC has decided to revive it into a city townhall. According to the plan the building will have a five storey structure with a glass dome on the top. There will also be a viewing deck on which will provide citizens a 180-degree view of the Fort and Azad Maidan area. The facility will also have a cafeteria, community hall along with a parking facility. Civic officials also maintained that the facility will have indoor recreation facilities for citizens as well. 'The objective of this plan is to provide citizens a space where they can visit and enjoy recreational activities. This facility will not cater to a specific section of people and will be open to everyone. Another primary purpose behind this plan is to engage tourism in the fort area,' said a civic official. The officials said that the BMC may also set up a museum inside one of the floors that will provide information about Mumbai's history as well as India's freedom movement. 'The facility will be located in a prime plot so it is quite evident that people from various walks of life including tourists will visit it. Therefore, it is the civic body's objective to use the plot entirely,' the official added. Civic sources said that while there has been no proposition made on entry fees yet, the final call will be taken once the project is ready. The last date of submission of bids to this tender is on August 29 and officials said that once the work order is issued it will take at least 3 years to finish the construction. Meanwhile, the existing sports complex will be relocated to Tulasiwadi near the Mahalakshmi racecourse, where a new state-of-the-art facility is proposed to be constructed to cater to the civic staff. Responding to questions about the relocation of the new sports complex, officials said the Mahalaxmi racecourse area was finalised owing to its natural space as well as the proximity to other sports facilities.