
IndiGo starts operations at Hindon airport with daily Kolkata flights
The flight 6E 2588 will operate on the Kolkata–Hindon route daily, the airline said in a statement.
It will depart from Kolkata at 5.50 am and reach Hindon at 8 am. The return flight will take off from Hindon at 8.50 am and reach Kolkata at 11 am.
According to the statement, the airline has taken a strategic leap in strengthening its offerings from the National Capital Region (NCR) by commencing operations from Hindon Airport in Ghaziabad, its second airport in the NCR after Delhi.
The airline said it will also operate flights from Ahmedabad, Bengaluru, Chennai, Goa, Indore, Mumbai, Patna, and Varanasi to Hindon airport.
This development offers convenient travel options for millions of residents in Ghaziabad, Noida, East and Central Delhi, and parts of Western Uttar Pradesh, the airline statement said.
'We are committed to enhancing the aviation infrastructure across India to enable seamless and convenient service connecting the smallest towns in the country with the growing cities and metros.
"The Hindon Airport developed under the UDAN Scheme in Ghaziabad is offering the convenience of proximity to people living in Ghaziabad, Noida and Western UP,' the statement quoted Minister of Civil Aviation Kinjarapu Ram Mohan Naidu as saying.
With nearly 70 weekly departures from the airport, the airline aims to enhance point-to-point travel for customers from the region, offering them the option of taking a flight from an airport closer to their homes, IndiGo Chief Executive Officer Pieter Elbers said.
From March 1 this year, Air India Express launched direct flight services from Kolkata to Hindon airport.
The airline had said it will operate 40 weekly flights from Hindon, directly connecting Bengaluru, Chennai, Goa, Jammu and Kolkata.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
2 hours ago
- Indian Express
Tender issued for widening of accident-prone Nuh-Alwar highway to 4 lanes
The highway connecting Haryana's Nuh with Alwar in Rajasthan is set to become a four-lane stretch within two years to reduce traffic congestion and provide better connectivity in this region. The Ministry of Road Transport and Highways (MoRTH) Thursday issued a notice inviting tender (NIT) for the four-laning of the 49.02-km stretch on the Nuh-Alwar highway (NH-248A). The current single-lane road has created traffic issues, reportedly resulting in approximately 3,000 deaths due to road accidents over the past 12 years. The project of four-laning is estimated to cost Rs 310.44 crore. To be executed under the engineering, procurement, and construction (EPC) mode, it includes strengthening and improving a 6.84-km section of the existing road in Malab and Bhadas villages in Nuh district, Haryana. The tender, issued by the superintending engineer and regional officer of the MoRTH in Jaipur, invites bids from qualified contractors. The completion period is 24 months, followed by a five-year maintenance period after the construction is complete. Bids can be submitted online via the Central Public Procurement Portal (CPPP) and Bill Information and Management System (BIMS) from July 24 to September 8, with the bid opening scheduled for September 9. The development comes after the Union government in April approved the project to convert the single-lane stretch into a four-lane road. On November 3, 2008, then Union minister S Jaipal Reddy laid the foundation for the four-lane road project. However, the project has remained in limbo. In a post on X, Transport Minister Nitin Gadkari in April said, 'This national highway section connects Gurugram, Sohna, and Nuh industrial areas. Due to the movement of heavy vehicles from Rajasthan to northern states, there is heavy traffic on this route. Making this section four-lane will reduce heavy traffic and provide better connectivity, which will promote economic development in this area.' Nuh Congress MLA Aftab Ahmed had earlier claimed it was the Manmohan Singh government that initiated works to convert the route into a national highway in 2014. 'But the BJP governments at the Centre and the state dropped this four-laning project in 2018, saying that the upcoming Delhi-Mumbai Expressway will take care of the needs of the people,' he had said. The Congress raised the issue repeatedly in the Haryana Assembly, Ahmed said, adding that he wrote to the ministry in December 2024 about the stretch between Nuh and the Rajasthan border via Ferozepur Jhirka.


Economic Times
3 hours ago
- Economic Times
Only 20-25% of India's 850 mn internet users shop online, shows untapped potential: McKinsey Report
Synopsis A McKinsey & Company report indicates significant growth for India's e-commerce sector. Currently, only 20-25% of Indian internet users shop online, but this is expected to rise substantially. E-commerce accounts for 7-9% of total retail sales, projected to more than double by 2030, driven by new business models, expansion into new categories, and rising demand from tier-two and tier-three cities. ANI Representative image. India's e-commerce sector is set for significant growth in the coming years, according to a report by McKinsey & report noted that only 20-25 per cent of India's 850 million internet users shop online. This is much lower as compared with mature markets like the United States and China, where over 85 per cent of internet users make purchases report said, "Out of the country's 850 million internet users, only about 20 to 25 per cent shop online".The report also highlighted that India has seen a strong rise in e-commerce activity over the past few country is not just catching up as a fast adopter of online shopping but is also emerging as an innovator in the field. This is especially visible in the rapid growth of quick commerce platforms that deliver goods in a very short time. However, e-commerce still accounts for only 7 to 9 per cent of India's total retail sales as of fiscal year 2023. This share is expected to more than double to between 15 and 17 per cent by 2030, showing the huge potential for business models are changing the shape of the e-commerce industry in India. Quick commerce and social commerce together make up more than 15 per cent of the e-commerce market today. Their share is expected to exceed 25 per cent by 2030.E-commerce companies are also finding new ways to serve consumers. They are expanding into new categories such as instant bookings for domestic services, professional help, and even medical next wave of growth in Indian e-commerce is likely to come from two main factors. One is the increasing entry into new segments like B2B (business-to-business) commerce and building materials. The other is the rising demand from tier-two and tier-three cities are seeing faster income growth than metro and tier-one cities. Monthly incomes in tier-two cities grew by 18 per cent between 2023 and 2024, which is higher than the growth seen in bigger report suggested that e-commerce in India will go beyond simply disrupting traditional retail. It is expected to reshape the entire retail system, including areas like last-mile delivery and logistics.


Time of India
3 hours ago
- Time of India
Nagpur Metro Phase 3: New Sitabuldi-Koradi corridor announced with future expansion plans
Advt Even as works under Metro Phase 2 continue at a rapid pace across the city and it's outskirts, Nagpurkars can look forward to the next big leap, which is 'Metro Phase 3'.A new metro corridor between Sitabuldi and Koradi has been finalised as part of the recently presented Comprehensive Mobility Plan (CMP), confirmed senior MahaMetro officials after a high-level stakeholder meeting held on Sunday in the presence of chief minister Devendra Fadnavis and Union minister Nitin Gadkari among CMP, prepared by MahaMetro in collaboration with RITES, outlines the development of mass rapid transit corridors in the Nagpur Metropolitan Region based on traffic density , projected ridership, and future mobility is also a proposal for a Metro Phase IV, though the route has not been revealed yet. Among the key proposals in CMP Phase 1 are two High Capacity MRTS Corridors - the 11.5 km Sitabuldi-Koradi corridor and the 25km Mankapur Chowk-Rachana Junction stretch on the Inner Ring Road. Together, they are estimated to cost 8,625 the two, the Sitabuldi-Koradi line was prioritised for development of the metro route. "We have finalised the Sitabuldi-Koradi corridor based on Peak Hour Peak Direction Traffic (PHPDT) assessments. The ridership projections and traffic volumes make it feasible for metro operations," said a senior MahaMetro proposed corridor is expected to cater to a daily ridership of 1.47 lakh commuters by 2054.