
IndiGo starts operations at Hindon airport with daily Kolkata flights
The flight 6E 2588 will operate on the Kolkata–Hindon route daily, the airline said in a statement.
It will depart from Kolkata at 5.50 am and reach Hindon at 8 am. The return flight will take off from Hindon at 8.50 am and reach Kolkata at 11 am.
According to the statement, the airline has taken a strategic leap in strengthening its offerings from the National Capital Region (NCR) by commencing operations from Hindon Airport in Ghaziabad, its second airport in the NCR after Delhi.
The airline said it will also operate flights from Ahmedabad, Bengaluru, Chennai, Goa, Indore, Mumbai, Patna, and Varanasi to Hindon airport.
This development offers convenient travel options for millions of residents in Ghaziabad, Noida, East and Central Delhi, and parts of Western Uttar Pradesh, the airline statement said.
'We are committed to enhancing the aviation infrastructure across India to enable seamless and convenient service connecting the smallest towns in the country with the growing cities and metros.
"The Hindon Airport developed under the UDAN Scheme in Ghaziabad is offering the convenience of proximity to people living in Ghaziabad, Noida and Western UP,' the statement quoted Minister of Civil Aviation Kinjarapu Ram Mohan Naidu as saying.
With nearly 70 weekly departures from the airport, the airline aims to enhance point-to-point travel for customers from the region, offering them the option of taking a flight from an airport closer to their homes, IndiGo Chief Executive Officer Pieter Elbers said.
From March 1 this year, Air India Express launched direct flight services from Kolkata to Hindon airport.
The airline had said it will operate 40 weekly flights from Hindon, directly connecting Bengaluru, Chennai, Goa, Jammu and Kolkata.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
&w=3840&q=100)

First Post
2 hours ago
- First Post
‘Easy as I settled India-Pak': Trump claims ended Thailand-Cambodia clash using trade pressure
Trump has once again claimed credit for helping end hostilities between India and Pakistan, this time while discussing rising tensions between Thailand and Cambodia. Drawing a comparison, Trump said he used trade pressure to de-escalate both situations read more US President Donald Trump on Sunday once again reiterated his claim of helping broker a ceasefire between India and Pakistan by using trade pressure—this time while drawing a parallel with the ongoing tensions between Thailand and Cambodia. Speaking about Southeast Asia, Trump said the United States maintains strong trade ties with both Thailand and Cambodia. He claimed he personally called the prime ministers of both countries and warned them that no trade deal would move forward unless they de-escalated their conflict. STORY CONTINUES BELOW THIS AD 'We do a lot of trade with Thailand and Cambodia. Yet I'm reading that they're killing each other,' Trump said. 'I say this should be an easy one for me because I settled India and Pakistan. I called the Prime Ministers of each (Thailand and Cambodia) and I said, 'We're not going to make a trade deal unless you settle the war.' By the time I got off the phone, I think they want to settle now.' #WATCH | US President Donald Trump says, "We do a lot of trade with Thailand and Cambodia. Yet I'm reading that they're killing each other... I say this should be an easy one for me because I settled India and Pakistan... I called the Prime Ministers of each (Thailand and… — ANI (@ANI) July 27, 2025 He went on to reference the India-Pakistan standoff, saying 'India and Pakistan were really getting ready to go at it. So getting those things settled—and if I can use trade to do that—then it's my honour.' Trump's constant claims of de-escalating the conflict Trump has made similar claims before, crediting himself for de-escalating the India-Pakistan conflict by instructing his administration to cancel all trade deals with both nations. He believes that pressure forced both sides to back down. 'We did some great work—India and Pakistan. That was close to being nuclear. We handled it. We did a lot,' Trump had told reporters earlier at the White House. 'I don't know if any president has done more.' Earlier, Trump also cited a similar approach in other global flashpoints. 'Serbia and Kosovo were going to go at it. I said, 'You go at it, there's no trade with the United States.' That's what happened with India and Pakistan. I told (Treasury Secretary) Scott (Bessent) and (Commerce Secretary) Howard (Lutnick), 'Cancel all deals with India and Pakistan. They're not trading with us while they're at war.'' STORY CONTINUES BELOW THIS AD However, India has consistently rejected Trump's assertions. According to Indian officials, the ceasefire agreement reached on May 10—after four days of intense cross-border drone and missile strikes—was the result of direct military-to-military communication between the Directors General of Military Operations (DGMOs) of both nations. Officials also clarified that the dialogue was initiated at Pakistan's request. In a recent phone conversation with Trump, Prime Minister Narendra Modi reiterated India's long-standing position that all matters with Pakistan are strictly bilateral and that New Delhi does not and will never accept third-party mediation.


Hindustan Times
3 hours ago
- Hindustan Times
Kashmir blushes red with bumper apple crop
Following months of slumber, Sopore fruit mandi is once again abuzz with the sound of vehicles bringing in the season's first apple crop for sale. The July month is considered a very important time for fruit development, the rainfall has not only given magnificent colour to different early varieties of apples but has also ripened the harvest. (File) In the early hours everyday, pickup trucks, tractors, small vans and horse carts loaded with fruit boxes head towards Mazbough village in Sopore where Asia's second largest mandi is located. The back to back rainfall in July has given growers a good hope for not only bumper fruit crops but also best quality apples. As per data of meteorological department, Kashmir has received normal to excess rainfall especially in the belts producing quality apples. The July month is considered a very important time for fruit development, the rainfall has not only given magnificent colour to different early varieties of apples but has also ripened the harvest. 'When there was a heatwave in June we were staring at a very messy situation. But we were hopeful after the first rainfall and were expecting a bumper crop. Across Kashmir apple orchards have good fruit even the high density apples have good yield this season,' said Sahib Ahmad Khan who owns several orchards in north Kashmir. He said right now, besides two to three early varieties like Hazratbali and red delicious apples, three to four varieties of high density apples, are also being harvested across Kashmir. 'Right from the start the market locally as well outside mandies is very good,' he said. Sopore fruit mandi president Fayaz Ahmad Malik said that 40 to 50 apple trucks are being loaded from the mandi every day. 'Even dozens of trucks are also being dispatched from other mandies of the Valley. So far the market is good and it's because the fruit quality is good due to timely rainfall,' he said adding that now with every passing day more and more trucks will arrive in the mandies and by next month 300 to 400 fruit trucks will be dispatched across the country. 'We hope this year growers will make good profit.' Kashmir is India's largest apple-producing region, fetching revenue of over ₹8,000 to ₹10,000 crore to the Union territory, and contributing around 8-10% of its gross domestic product. The UT produces around 20 lakh metric tonnes of apples per year. Around seven lakh farming families (approximately 35 lakh people) are directly or indirectly associated with the horticulture sector. 'The season has already started. First it was stone fruits and cherries, now different apple varieties are arriving in the mandis. The markets are promising and prospects also look good. Hopefully things will remain the same incoming months,' said Javeed Ahmad Dar, a grower from south Kashmir. This year stone fruit and cherries also fetched good prices despite early spring weather vagaries.


Time of India
5 hours ago
- Time of India
Rs25,567Cr Mobility Plan To Ease Nagpur Gridlock
Nagpur: After months of deliberation and consultations with stakeholders, the much-anticipated ₹25,567-crore Comprehensive Mobility Plan (CMP) for the Nagpur Metropolitan Region (NMR) has entered its final stage before implementation. The latest and most detailed version of the plan was presented on Sunday to chief minister Devendra Fadnavis, Union minister Nitin Gadkari, Nagpur guardian minister Chandrashekhar Bawankule, and representatives from 16 departments during the third and concluding stakeholder meeting. Officials from Nagpur Municipal Corporation (NMC), MahaMetro, Nagpur Improvement Trust (NIT), traffic police, and the district collectorate were present at the meeting held at Metro Bhawan. The CMP, jointly prepared by MahaMetro and RITES, aims to streamline mobility, reduce congestion, and build long-term transport infrastructure for the region, which spans 3,780 sq. km and has a population of over 43.7 lakh. The final version of the plan reflects a significant budget hike of nearly ₹7,000 crore compared to the previous draft, indicating the inclusion of several new infrastructure components and upgrades pegged at ₹18,585 crore. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 10 Signs Your Dog Loves You More Than Anything Liseer Read More Undo Divided into three phases, the CMP allocates ₹13,927 crore for Phase 1, ₹10,774 crore for Phase 2, and ₹865 crore for Phase 3. A major addition in the latest draft is the proposed 148-km six-lane peripheral ring road, estimated at ₹3,700 crore. This key project, forming part of Phase 2, will act as a regional bypass connecting major highways including NH-44, NH-47, NH-353, NH-53, and the Samruddhi Mahamarg, thereby diverting heavy traffic away from the city core. "Urbanisation is increasing rapidly, especially in areas like the Mihan and Koradi-Kamptee belt. The road and transport infrastructure must be upgraded accordingly. All agencies must act swiftly on the final plan," said Gadkari. The plan focuses heavily on five core areas — non-motorised transport (NMT) facilities, mobility management, public transport, freight infrastructure, and road upgrades. These areas encompass 20 specific sectors, such as electric buses, intelligent traffic systems, flyovers, underpasses, off-street parking, and pedestrian-friendly pathways. The CMP also proposes restrictions on the movement of long-distance commercial vehicles within city limits from 7am to 9pm, relocation of godowns from the core city area, and promotion of smaller, low-emission cargo vehicles in inner zones. Four freight terminals are planned: Automotive Chowk and Kapsi in Phase 1, Gumgaon in Phase 2, and Gondkhairi in Phase 3 — each estimated at ₹20 crore. "To shape the growing expansion of the Nagpur metropolis, we will implement the mobility plan in three phases. I appeal to citizens and public representatives to share their suggestions, so the plan becomes more people-oriented," Fadnavis said during the meeting. Officials confirmed that a 15-day window has been opened for final suggestions or modifications from participating departments. The DPR, once ready, will be submitted to the state and then to the central government for final approval, after which it will be implemented on the ground. The first mobility plan for Nagpur city was prepared in 2013 by the Nagpur Improvement Trust (NIT). It was revised by MahaMetro in July 2018 and updated again with wider inputs through meetings chaired by the divisional commissioner. Infographics: Cost (₹ Cr) NMT Facility Improvement Plan Footpath (1.5–2 m wide)...................Km.........................156.................................131 NMV Lane (2–2.3 m wide)..................Km.........................139.5..............................116.9 At Grade Pedestrian Grade Separated Mobility Management Measures Automatic Off-Street Intelligent Traffic Mgmt Public Bicycle Sharing (PBS)...............Location..................120..................................24 Intersection Public Transport Improvement Plan High Capacity Medium Capacity Electric Bus Terminal New Bus Railway Station Freight Infrastructure Improvement Freight Road Improvement Projects Road Widening (2/4 lanes)..................Km.......................137.1...............................393.5 New Roads (4-lane C/W)....................Km.........................15.6................................89.5 Rail Over Bridges (4-lane)...................Nos............................7..................................200 Flyovers / Peripheral Ring Road (6-lane).............Km.........................148...............................3,700 Total……………………………………………………………………………………….25,567