
Bodaki, Noida's rail link to east, to have 12 platforms
Noida: The upcoming railway station at Bodaki — being designed as NCR's gateway to the eastern part of the country — will be called
Greater Noida Terminal
. Officials said this could be one of north India's most modern hubs, capable of handling 100 trains, including Vande Bharat and other premium expresses.
Spanning 46 hectares within a larger 176-hectare
multimodal transport hub
, the station will feature 12 platforms and 63 yard lines for comprehensive maintenance operations. While the ground floor will incorporate railway operations, the storeys above will house commercial spaces, creating a mixed-use development.
Complementing the
Noida International Airport
— which is set to start operations in a few months — the station, less than an hour's drive, will aid connectivity between Delhi-NCR and eastern India. The transport hub, of which Greater Noida Terminal will be a part, will integrate an inter-state bus stand, a local bus terminal, and a metro corridor connecting Depot station with Bodaki — serving as a convergence point for commuters from Greater Noida, Noida, and other NCR cities.
With multiple changes in its design, the project's scope has evolved significantly since its initial conception. Originally approved at Rs 1,850 crore, officials said the budget was expected to double with these enhanced capabilities.
The transport hub project gained momentum after being declared a special railway project in Dec last year — a move that streamlined land acquisition and subsequent approvals. According to officials, with the additional DM (land) appointed as the competent authority, acquisition for the project was likely to be completed within two months.
The master plan is being prepared by DMIC-IITGNL, a special purpose vehicle (SPV) jointly promoted by NICDIT (Centre) and Greater Noida Industrial Development Authority (GNIDA), each holding a 50% stake. Officials said SPV would submit the blueprint for state govt approval. While Indian Railways will oversee the construction of the station and other allied infrastructure, the SPV will manage the project's financing and develop supporting facilities, such as bus stands and utilities.
The project will have two distinct parts — zone I (130 hectares) housing transit and commercial facilities, and zone 2 (46 hectares) dedicated to the railway terminal and associated commercial development.
Connectivity has been prioritised in the planning, with the hub accessing the Delhi-Howrah railway line and connecting to major road networks, including a 60-metre arterial stretch and a 105-metre expressway-grade corridor. These links will facilitate seamless access to Knowledge Park I, NH-34, and Eastern Peripheral Expressway.
When operational, the Greater Noida Terminal will significantly decongest Delhi's existing transit points — particularly Anand Vihar — by absorbing east-bound passenger traffic from Noida, Greater Noida, Ghaziabad, and other NCR cities. Together with other major infrastructure projects in the region, including the airport, Film City, and Medical Device Park, the transport hub is poised to catalyse economic growth and urban development in this economic corridor.
According to officials, the project is expected to take three years to complete following approval of the master plan.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
43 minutes ago
- Time of India
Andhra Pradesh chief minister Chandrababu Naidu seeks funds for tobacco farmers
Vijayawada: Chief minister N Chandrababu Naidu has requested Union commerce minister Piyush Goyal to allocate ₹150 crore from the tobacco board to the state govt to manage the ongoing burley tobacco purchases. He said that the state govt is purchasing about 20 million kg of burley tobacco by spending nearly ₹300 crore as traders did not pick up the stocks leaving the growers into deep trouble. Union minister Goyal visited chief minister Chandrababu Naidu's residence in Undavalli on Sunday and held discussions on various issues. The chief minister explained that the state govt set up tobacco purchase centres at seven locations in Bapatla, Guntur, Palnadu, and Prakasam districts to avoid further delay causing distress among the farming community. "The state govt deployed state marketing agency-markfed to purchase burley tobacco from growers and it was expected to cost around Rs 300 crore. The state's burden would greatly come down if the Centre grants at least Rs 150 crore from the surplus revenues of the tobacco board," said Naidu. He had also requested the Union minister to bring burley tobacco production and marketing under the purview of the tobacco board with the amendment of tobacco board Act. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo He said that tobacco board is only regulating FCV tobacco while the burley growers are being misled by the private players resulting in crisis when there are no buyers. He observed that bringing the cultivation of white and black burley tobacco too under the tobacco board jurisdiction would be help regulate the crop properly. Chief minister urged Goyal to reconsider reducing the import duty on oil palm to 10%. He explained that reducing import duty is causing palm oil farmers in the state to receive unfair prices and suffer significant losses. Chief minister highlighted that the decision to reduce import duty could hinder the goals of the National Mission on Edible Oils (NMEO) set by the centre. He suggested the union minister to hold discussions with the US regarding the duties imposed on aqua exports. "The 27% duty imposed by the US on seafood is impacting eight lakh aqua farmers in Andhra Pradesh. The Centre should exert pressure on USA to reduce the burden to relieve aqua farmers," said Naidu. He had also urged Goyal to reduce GST on mango pulp from 12% to 5%. He said that the state govt had already brought the issue to the attention of the Union finance minister Nirmala Sitharaman.


Time of India
43 minutes ago
- Time of India
Private agency to manage Mahatma Gandhi park for one year
Hubballi: A private agency will handle the maintainance of amenities and activities at the Mahatma Gandhi Park for a year from now. The agency has significant experience in maintaining public places, as evidenced by their successful management of Tolankere Lake. Under the new agreement, they will oversee the daily operations of the park's key attractions, including the Indira Glass House, musical fountains, and the popular toy train service, along with the public toilets, drinking water outlets, and will also maintain the park's cleanliness. The agency plans to introduce new recreational activities and enhance existing ones to make the park more appealing. They will ensure regular maintenance of green spaces, walking paths, and children's play area. Park's lighting system, seating arrangements, and security measures will also be upgraded to ensure the safety and comfort of visitors. The Smart City project's redevelopment has transformed the park into a modern recreational space. Proper maintenance is crucial to preserve the upgrades. The agency will employ trained staff for gardening, cleaning, and technical maintenance. The HDMC's decision to outsource the park's management comes with financial benefits, as they will receive an annual revenue of Rs 11 lakhs from the agency without any operational cost. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo This arrangement ensures professional maintenance of the park, while also generating income for HDMC. The contract includes specific performance criteria and regular monitoring of service. According to sources in HDMC, the revised entry fees set by the new agency will be Rs 15 for visitors above 6 years of age and Rs 20 for adults. Additionally, visitors can enjoy a 15 minute musical fountain show at Rs 50, and a ride on the toy trains at Rs 50. Toilets at the park were in a deplorable condition without water supply. The park was occupied by stray dogs. Students emphasised the urgent need for a proper park management, suggesting that relevant officials should conduct regular inspections to ensure appropriate maintenance. Vijay Kumar R, superintending engineer of HDMC, said that the agency has already begun preliminary assessment and will gradually implement their management plan while keeping the park accessible to the public. A week ago, the agency commenced operations, with a team of HDMC officials supervising the maintenance activities, he added.


Time of India
43 minutes ago
- Time of India
Couple found dead at house, kin alleges threat from bank
Thiruvananthapuram: A couple, who were reportedly facing a severe financial crisis, were found dead at their house in Karamana, allegedly after receiving a call from a nationalised bank informing them that their house would be attached on Monday as part of revenue recovery. Police identified the deceased as Satheeshan, 55, of Keshava Bhavan near Kochu Kattanvila at Thamalam and Bindu V, 49. Bindu's body was found hanging in the bedroom and Satheeshan's body was lying on the floor. "Only after a postmortem can we confirm whether it was suicide or whether there was any foul play. The cause of Satheeshan's death has also not been confirmed. There was some bleeding from his body," said police. The relatives of the deceased alleged that the bank cheated the deceased by charging an enormous amount as interest on the loan taken. According to relatives, Satheeshan took a loan of Rs 60 lakh about seven years ago. He suffered a stroke in 2021. Following this, he could not repay the loan amount. "Two years ago, the bank offered him some money as a top-up of the existing loan. However, he received no money, and the bank asked him to pay Rs 1.10 crore to avoid revenue recovery. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Is USDJPY on the Upward Move? IC Markets Sign Up Undo In April, the bank staff members had reached the house to seal the property, but due to the resistance by local people, they did not proceed with it. The bank later directed him to pay back Rs 2 crore. Following that, he filed a case against the bank demanding a reassessment of the way the repayment amount was calculated and also for threatening him on the phone continuously," said Binu T, brother of Bindu. Binu also said the family was planning to sell the house to repay the loan, but by projecting a huge amount, the bank ruined their plans to clear the dues. Locals recently protested in front of the bank demanding justice by waiving off some part of the interest. But the bank was not willing to do so, alleged Binu.