
Uttarkashi floods: Villagers get 5k cheques; say amount 'too less, lost everything'
" "We have lost everything, our families, homes, businesses worth crores. This amount is an insult," one villager said.
Residents said since there was no electricity in the area following the disaster, candle packets were distributed to them but they arrived only four days after the disaster. "We spent those nights in darkness. Used firewood to heat food. Govt talks about ration, but that, too, has not reached us. We had to go door to door looking for it," one of them said.
On Friday, villagers staged protests outside offices of the DM and sub-divisional magistrate, shouting "Modi Ghaam taapo" over the slow trickle of aid. PM Modi had visited Harsil and Mukhba in March and had used the phrase to promote winter tourism in the area. Those very villages are now struggling for basic facilities, a protester said. A disaster management officer said the Rs 5,000 cheques were an immediate measure, and full extent of losses is still being assessed.
Stay updated with the latest local news from your
city
on
Times of India
(TOI). Check upcoming
bank holidays
,
public holidays
, and current
gold rates
and
silver prices
in your area.
Get the latest lifestyle updates on Times of India, along with
Raksha Bandhan wishes
,
messages
and
quotes
!

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hans India
17 minutes ago
- Hans India
Op Sindoor success linked to Bengaluru's innovation: PM
Bengaluru: Prime Minister Narendra Modi today emphasised Bengaluru's critical role in India's Defence technology and the Make in India mission, linking the city's vibrant tech ecosystem and talented youth to the success of Operation Sindoor. The operation, which involved striking terrorist camps deep inside enemy territory and swiftly overpowering Pakistan's forces, has been hailed as a demonstration of India's growing military prowess powered by indigenous technology and innovation. Addressing a gathering at the inauguration of the Bengaluru Metro Yellow Line and the foundation laying of Phase 3, PM Modi praised the contributions of Karnataka's youth to Defence manufacturing and technology, underlining how Bengaluru is emerging as a crucial hub not only for IT but also for high-end Defence production. He called upon Karnataka's talent pool to lead the vision of an 'Atmanirbhar Bharat' (self-reliant India) in the tech sector. 'The success of Operation Sindoor is a testament to the strength of our technology and Defence capabilities built on the foundation of Make in India,' said the Prime Minister. 'Bengaluru's youth and Karnataka's industrial ecosystem have played a major role in this achievement.' The Prime Minister described Bengaluru as a city deeply rooted in tradition and culture but simultaneously poised at the forefront of progress and innovation. He paid tribute to the city's founder, Nadaprabhu Kempegowda, highlighting his vision of a city that balances heritage with develop


Hans India
17 minutes ago
- Hans India
Bhatti: Devadula project top priority of Cong govt
Hyderabad: The Deputy Chief Minister, Mallu Bhatti Vikramarka, said that the Chokka Rao Devadula Project holds the highest priority for the state government. During his visit to the project along with his cabinet colleagues N Uttam Kumar Reddy, Ponguleti Srinivas Reddy, Vaakiti Srihari, and Seethakka, as well as local MPs and MLAs, Bhatti said that from the very beginning of the Devadula Project until now, the Congress government has taken it up with the utmost prestige. 'It is said that a total of Rs 100 crore is pending, including land acquisition costs and other outstanding bills. We will release these funds in phases. Officials should immediately send the related details. Through this project, irrigation water is being supplied to 17 constituencies in the state,' he said. The Irrigation Minister, N Uttam Kumar Reddy, who accompanied him, said that the project is designed to irrigate 5.57 lakh acres across Hanamkonda, Warangal, Karimnagar, Jayashankar Bhupalpally, Mulugu, Jangaon, Yadadri, Suryapet, and Siddipet a total lift of 469 metres—from +71 m to +540 m—and the utilisation of 38.16 TMC over 170 pumping days annually, the project is being executed in three phases. It includes major pump houses, rising and delivery mains, balancing reservoirs, and an extensive canal network to deliver water to high-elevation command areas. Uttam said the revised project cost was Rs 18,500 crore, of which Rs 14,168.49 crore had been spent. An additional Rs 4,331.51 crore was urgently required to clear contractor dues, complete delivery main encasement works, and finalise pending land acquisition. Once completed, the JCRDLIS would stabilise the existing ayacut, provide drinking water to rural habitations, improve crop yields, and reduce migration from water-scarce areas. Earlier in the day, Uttam Kumar Reddy participated in the foundation stone laying ceremony for the Rs 630.30 crore Jawahar Lift Irrigation Scheme (LIS) at Vangaveedu in Madhira mandal, Khammam district, alongside Deputy Chief Minister Bhatti Vikramarka and Ministers Ponguleti Srinivas Reddy, D Seethakka, Vakkati Srihari, and Komatireddy Venkat Reddy. Calling it a 'game changer' for Madhira, he said tenders had been finalised and the project would be completed within one year to provide irrigation to 33,000 acres.


Indian Express
17 minutes ago
- Indian Express
PM Narendra Modi inaugurates Yellow Line, Bengaluru metro network expands to 96 km
Prime Minister Narendra Modi Sunday inaugurated Bengaluru metro's Yellow Line covering a distance of 19km, connecting RV Road to Bommasandra via Electronic City. Modi also undertook a metro train ride from RV Road (Ragigudda) metro station to Electronic City with Karnataka Chief Minister Siddaramaiah, Deputy Chief Minister D K Shivakumar, central ministers and other local parliamentarians and legislators. The Yellow Line has 16 stations and has been built at a cost of Rs 7,160 crore. The prime minister Sunday also laid the foundation stone of the Bengaluru metro's Phase-3 project worth over Rs 15,610 crore. The total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project is estimated to be completed by the end of 2029. Phase 3 will primarily serve underserved areas along Magadi Road and the western portion of the Outer Ring Road (ORR). According to sources, the 19-km ride on Bengaluru Metro's Yellow Line between RV Road and Bommasandra is likely to cost Rs 60 when commercial operations commence on August 11. Yellow Line operations will begin with three trains, stopping at all stations, running every 25 minutes. According to Bangalore Metro Rail Corporation Limited (BMRCL) authorities, this will amount to around 72 trips in each direction daily, with 18 hours of service and a passenger capacity of around 2 lakh per day. The corridor runs through major tech hubs housing companies like Infosys, Wipro, Biocon, Delta, and Tech Mahindra, and will improve connectivity to residential areas, hospitals, educational institutions, and industrial zones on Hosur Road. It is also expected to ease traffic congestion at the infamous Silk Board junction. Credit war breaks out The inauguration of Bengaluru Metro's Yellow Line also triggered a political face-off, with Chief Minister Siddaramaiah and Deputy Chief Minister Shivakumar accusing the Union government of contributing very little towards the city's flagship infrastructure project, while the BJP claims otherwise. Siddaramaiah said the Karnataka government has borne 87.37 per cent of the cost for the metro, with the Centre's share being just 12.63 per cent. 'Although it was agreed that both governments would invest in a 50:50 ratio, the Centre's funds, other than equity, have come in the form of loans, which must be repaid with interest by the state and the metro corporation. This means the burden on the state is 87.37 per cent,' he said after the inauguration of the Yellow Line. He pointed out that the state has so far spent Rs 25,387 crore on Phases 1, 2, 2A, 2B, and 3, along with Rs 3,987 crore for loan repayment, totalling Rs 59,139 crore in allocations. The Centre, he said, has released only Rs 7,468.86 crore from its treasury. The CM appealed to PM Modi to increase central support, stressing that Bengaluru's growth is critical for the nation's economy. 'We request the central government to prioritise Karnataka just like it prioritises Maharashtra and Gujarat,' he said. Deputy CM Shivakumar reiterated the charge, stating that the state's share for Namma Metro was 80 per cent compared to the Centre's 20 per cent. 'The Centre was supposed to bear 50 per cent of the land acquisition cost for the metro, but it hasn't given. Yet, we completed the project in the city's interest. Bengaluru is the second-highest tax contributor in the country but gets very little in return,' he told reporters. Shivakumar also launched a direct attack on the BJP, saying no BJP MP from Karnataka had brought even Rs 10 in funds for Bengaluru. 'Some MPs (referring to Tejasvi Surya) think tweeting and media coverage amount to achievement. MPs must keep aside politics and work for the welfare of the people,' he said. He also accused the Centre of neglecting Karnataka, citing pending MGNREGA dues and a lack of tax devolution parity with cities like Ahmedabad.