Rudrastra: Indian Railways Launches Asia's Longest And Largest Freight Train Stretching 4.5 Kms
Read More

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
6 hours ago
- News18
Govt Jobs 2025: 5 'Evergreen' Roles With Vacancies Every Year And No Exams
Last Updated: Govt Jobs 2025: No exams needed! Secure roles in Indian Railways, India Post, AAI & more through merit or GATE scores. Annual vacancies, low stress, high stability Securing a government job often involves rigorous written examinations, which can be stressful and time-consuming. However, several roles within the public sector allow for direct recruitment, bypassing traditional entrance exams. Selection may be based on academic merit, interviews, GATE scores, or specific qualifications, offering a streamlined route into stable and respected positions. These job roles span a variety of departments, including the Indian Railways, Indian Postal Services, Airport Authority of India, Indian Navy, and the Bureau of Indian Standards (BIS). For example, recruitment for the GDS post in India Post, Railway Apprentices, and Scientist-B in BIS relies on academic or GATE-based criteria, not entrance tests. 5 Government Job Roles Without Written Exams To increase your chances of securing one of these roles, it's vital to regularly monitor official job portals and stay updated on upcoming vacancies. Note: 'Evergreen' jobs refer to roles where vacancies are announced regularly, year after year, due to consistent demand across departments. 1. Gramin Dak Sevak (GDS) – India Post 2. Railway Apprentice 3. Anganwadi Worker/Assistant 4. Bank Sub-Staff / Sweeper 5. State-Level Contractual Roles (e.g., Data Entry Operators, Peons) Shortlisting Criteria Preparation Strategy A Wide Range Of Opportunities Whether your interests lie in technical fields (AAI, BIS), defence (Indian Navy), postal services (GDS), or transport (Indian Railways), the government offers diverse, exam-free career paths. These roles not only offer job security but also reduce the pressure and competition associated with traditional entrance exams. view comments First Published: Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


Business Standard
14 hours ago
- Business Standard
Western Railway Achieves Major Milestone with Commissioning of India's First 2x25 kV Traction Substation under "Mission Raftaar"
HT Syndication New Delhi [India], August 12: Ratlam Division, Western Railway: Western Railway has achieved a significant milestone with the successful commissioning and energisation of the First 2x25 kV Electric Traction System at the Nagda-Khachrod section under the Ratlam Division. The system includes two Scott-connected 100 MVA Power Transformers for efficient feeding of electrical load to the Overhead Equipment (OHE). The Nagda TSS was first to be energised by using Scott Technology of Transformer on PAN India and state of art technology has been erected and commissioned successfully. The inauguration was carried out by Shri Ranjan Srivastava, Principal Chief Electrical Engineer, Chief Electrical Engineer, Western Railway. This commissioning marks a historic moment as the first-ever segment of Indian Railways' 2x25 kV Traction Substation becomes operational under the ambitious "Mission Raftaar" initiative. This advanced system is expected to significantly enhance energy efficiency, traction power availability, and train operating speeds across the network. The successful execution of this project is the result of seamless coordination and joint efforts by the Divisional Electrical Engineering team, Ratlam, Construction Department of Western Railway, TRD team, and M/s BNC Power Projects Ltd. Western Railway remains committed to driving innovation and infrastructure upgrades in line with Indian Railways' mission to improve performance, sustainability, and passenger experience. BNC POWER PROJECT Ltd has Legacy of 40 years of Experience in field of Power Domain and first EPC contractor to execute Design, Supply, Erection and Commissioning EPC Project for construction of Traction Substation and associated Switching post for 2*25 KV Overhead Electrification System for Western Railway and work done was well appreciated by Railway Authority. Contact for Media Enquiries: Mr. Amit Jain Phone: +91 96430 04317 Email: amitjain@ About BNC Power Project Ltd. BNC Power Projects Ltd. is a leading engineering and infrastructure solutions provider specialising in power systems, traction substations, and railway electrification projects. With a proven track record in delivering large-scale, high-performance power infrastructure, the company blends technical expertise, innovation, and a commitment to quality to support India's growing infrastructure and transportation needs. (ADVERTORIAL DISCLAIMER: The above press release has been provided by HT Syndication. ANI will not be responsible in any way for the content of the same.)


Economic Times
15 hours ago
- Economic Times
Railways' earnings showed 25.51-pc increase in 2022-23 over previous financial year: CAG
The Indian Railways earned Rs 2,39,982.56 crore from passenger and freight operations in the financial year 2022-23, reflecting a 25.51-per cent rise over the previous year, the Comptroller and Auditor General (CAG) said in its report tabled in both Houses of Parliament on Tuesday."This report provides an analytical review of the finances and accounts of the Indian Railways (IR) and is based on the audited accounts for the year ended March 2023," a press note from the CAG said. According to the report, in 2022-23, the total expenditure of the Ministry of Railways (MoR) was Rs 4,41,642.66 crore, which was 11.34 per cent more than 2021-22. The report said this total expenditure comprised Rs 2,03,983.08 crore (7.21 per cent more than the previous year) of capital expenditure and Rs 2,37,659.58 crore (15.15 per cent more than the previous year) of revenue expenditure. The ministry incurred around 72.22 per cent of the total working expenses on staff cost, pension payments and lease-hire charges on rolling stock, the press note said. Highlighting the Gross Traffic receipts (total earnings from passenger and freight services), the CAG said in 2022-23, it was Rs 2,39,982.56, reflecting a 25.51-per cent increase over the previous year (2021-22)."The increase in total receipts was mainly on account of an increase in passenger earnings, other coaching earnings and freight earnings. Transportation of coal constituted 50.42 per cent of freight earnings," the report said."There was a net surplus of Rs 2,517.38 crore in 2022-23 as compared to a net deficit of Rs 15,024.58 crore during the previous year. The Operating Ratio (OR) was 98.1 per cent in 2022-23 against 107.39 per cent in 2021-22. Indian Railways generated a net surplus during 2022-23 as compared to a net deficit in 2021-22," it CAG has observed that though there was a decrease in the loss on operation of passenger and other coaching services as compared to the previous year, the loss of Rs 5,257.07 crore in passenger operations was left uncovered during 2022-23."The profit from freight traffic was utilised to cross-subsidise the loss on operation of passenger and other coaching services," it said."Unsanctioned expenditure of Rs 6,483.71 crore, involving 1,932 cases, was incurred by MoR, which was 1.05 per cent of total expenditure during the year 2022-23," it about the financial performance of the public sector enterprises of the Indian Railways, the report said the investment of equity and loans in Railway Public Sector Enterprises as on March 2023 was Rs 5,38,869.02 crore, which comprised a paid-up capital of Rs 61,351.33 crore and long-term loans of Rs 4,77,517.69 crore."The Government of India contributed Rs 49,027.29 crore (79.91 per cent) in the paid-up share capital of Railway Public Sector Enterprises. The remaining paid-up share capital of Rs 12,324.04 crore was contributed by financial institutions (5.05 per cent), central government companies (5.03 per cent) and state government/state government companies (10.01 per cent)," the press note said."The net profit of the Railway Public Sector Enterprises had shown an increasing trend and had increased from Rs 6,146.29 crore in 2018-19 to Rs 12,056.61 crore in 2022-23," it audit found that of the total 45 Railway Public Sector Enterprises, 33 earned a profit (of Rs 12,145.97 crore) during 2022-23, which included 12 railway companies, 10 subsidiaries, five joint ventures (JVs) and six special purpose vehicles (SPVs)."Out of 33 profit-earning Railway Public Sector Enterprises, only seven Railway Public Sector Enterprises (six railway companies, one subsidiary) had declared a dividend as stipulated in DIPAM instructions of May 2016, which provided that every CPSE would pay a minimum dividend of 30 per cent of profit after tax or 5 per cent of net worth, whichever is higher," the press note CAG also reviewed budgetary and accounting controls in the accounts department of the North Western Railway, South East Central Railway and South Western Railway, and said the electrical department of construction organisation of the NWR raised a demand for Rs 5 crore for the Revised Estimates of 2022-23 against the Ratlam-Dungarpur via Banswara New Line Project frozen in September 2019 -- the demand that was cleared by the accounts department of the NWR as well as the Railway Board and funds were allotted to a frozen project."Up to March 2023, North Western Railway (NWR) and South Western Railway (SWR) incurred expenditure of Rs 3,142.49 crore against four works completed but not closed. The expenditure exceeded the revised sanctioned estimate by Rs 743.7 crore (31 per cent)," the press note said. "In NWR, the productivity tests of seven projects completed during the period 2011-12 to 2016-17, which were due between 2020-21 and 2022-23, had not been conducted as on date of audit (July 2023). Thus, the achievement against anticipated earnings/savings in working expenses when the proposals for the projects were embarked upon, could not be assessed," it added.