
Toronto power outage leaves thousands without power as Ontario boils in sweltering heat
Thousands of homes and businesses across Ontario are still without electricity as a punishing heat wave pushes temperatures and tempers to dangerous levels. In Toronto, widespread power outages were reported Monday afternoon, just as the city sweltered under extreme heat reaching 36°C, with humidex values making it feel closer to 46°C.
Toronto Hydro
's outage map showed disruptions stretching from Bloor Street West and Avenue Road all the way north to Bayview and Finch. As of 2:00 p.m. EDT, at least 2,690 customers were confirmed affected, though the real number may be higher given the dense population of the impacted area.
Power is expected to be restored by 4:30 p.m., according to Toronto Hydro.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Julia Bradbury: 'I Thought Surgery Was My Only Option — Then I Found These'
Daily Buzz Report
Learn More
Undo
Hydro One
, Ontario's largest electricity provider, said the outage originated from its Bridgman Transmission Station, which disrupted the supply of power to Toronto Hydro and its customers.
In a statement posted on X shortly after 1 p.m., Hydro One confirmed its teams were working in coordination with Toronto Hydro to restore power 'safely and quickly.'
Live Events
The broader outage extends well beyond Toronto. According to real-time data from the website PowerOutage, as of 3:17 p.m. EDT, June 23, approximately 17,500 homes and businesses were without power across central and eastern Ontario.
Of those, Hydro One reported 12,314 affected customers out of its 1.46 million total. Toronto Hydro logged 2,767 outages out of 844,567 customers, Niagara Peninsula Energy had 243 without power out of 23,317, and Hydro Ottawa reported 76 outages among its 372,417 clients.
Much of Ontario remains under
Environment Canada
heat warnings, compounding risks for residents affected by the outages.
The disruption comes as Hydro One continues to address lingering issues from Saturday night's severe thunderstorms, which knocked out electricity for approximately 50,000 customers. Around 15,000 of those still remain without service.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
Monsoon may rain down on city in 48 hrs, IMD issues yellow alert
New Delhi: Parts of the city received rain on Monday. The monsoon is expected to arrive in Delhi in 48 hours. The India Meteorological Department has issued a yellow alert for light to moderate rain and thunderstorm for Tuesday and Wednesday. According to IMD, Safdarjung, which is the city's base station, logged 4.1 mm of rainfall between 8.30am and 5.30pm. Lodhi Road received 4.3mm of rainfall during the same period. "Conditions are favourable for the further advance of the southwest monsoon over the remaining parts of the north Arabian Sea, some more parts of Rajasthan, Punjab, some parts of Haryana, Chandigarh and Delhi, remaining parts of west Uttar Pradesh, Himachal Pradesh, and remaining parts of Jammu during the next two days," IMD said in its bulletin on Monday. The normal monsoon onset date for Delhi is June 27. Delhi is likely to get rain over the next seven days. The city has already received excess rainfall before the arrival of the monsoon — 80mm till Monday when the month's normal is 74.1mm. The maximum temperature on Monday was 36.2 degrees Celsius, two notches below normal. The minimum settled at 28.2 degrees Celsius, which is near normal for this time of the year. The relative humidity oscillated between 60% and 89%. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Perdagangkan CFD Emas dengan Broker Tepercaya IC Markets Mendaftar Undo The monsoon reached Delhi on June 28 last year. The city saw a rare day of "extremely heavy rainfall" — 228.1mm on a single day. The monsoon reached Delhi on June 25 in 2023, and Safdarjung logged 48.3mm of rainfall that year. On the other hand, a five-day streak of consecutive days of satisfactory air quality index ended after the AQI rose to 112, which is in the moderate category, on Monday. The AQI was 92 a day earlier. The city witnessed similar five-day streaks of satisfactory AQI in June in 2021 and 2020 too. According to the Air Quality Early Warning System for Delhi, which is the forecasting body under the union ministry of earth sciences, the air quality is likely to again turn satisfactory from Tuesday to Thursday. The Central Pollution Control Board considers a satisfactory day when the AQI is between 51 and 100, and an AQI between 101 and 200 is categorised as moderate.


Time of India
3 hours ago
- Time of India
Record-breaking rainfall inundates Sivasagar town
1 2 3 4 5 6 Dibrugarh: A heavy spell of overnight rainfall brought life to a standstill in Sivasagar town on Monday, submerging all 14 municipal wards under knee-deep water and breaking the record of highest rainfall in a single day. According to district officials, the town recorded a staggering 146.5 mm of rainfall in 24 hours — the highest single-day precipitation ever recorded in Sivasagar, surpassing the previous record of 142.5 mm set on Apr 13, 2021. The deluge transformed streets into rivers, forcing residents to wade through knee-deep water as they navigated their submerged neighbourhoods. The relentless downpour triggered severe waterlogging, with residents claiming they had not seen such flooding in decades. Key areas like Melachakar, Phukan Nagar, Muktinath Chariali, BG Road, Amolapatty, HCB Road, ONGC Colony, Babupatty, Boarding Road, GNG Path, Dolmukh Chariali, Ganapatty, and Na Ali were among the worst affected. Even the parks and walkways surrounding the historic Rang Ghar, a symbol of Assam's Ahom-era heritage, was waterlogged. Shops, schools, homes, and major roads remained inundated, disrupting life. Local businessman Bhaskar Gogoi from Phukan Nagar said, "Sivasagar town has not witnessed such waterlogging in the last several years. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Scam Exposed: What They Won't Tell You about zero trust! Expertinspector Click Here Undo I have lived here for 30 years, but I've never seen water rise so quickly. Within hours, our ground floors were flooded, and people were struggling to move around." Sivasagar DC Ayush Garg said multiple agencies have been mobilised to address the crisis. "The District Disaster Management Authority, water resources department, Public Works Department, municipal board, civil defence, and district administration are working together to drain the accumulated water from the town. We have deployed pumps in critical zones and are cleaning clogged drains to restore normalcy as soon as possible," Garg added. The administration also focused on the Rang Ghar precinct, where water accumulation threatened the heritage site. Municipal workers were seen clearing debris from drains to facilitate faster water drainage. "This is an unprecedented situation, and our teams are working round the clock to clear the waterlogged areas. This kind of rainfall in such a short duration can overwhelm any drainage system. Our priority is to ensure the safety of residents while clearing the waterlogged areas as quickly as possible," chairperson of Sivasagar Municipal Board, Mrinali Konwar said. Residents expressed frustration with the recurring waterlogging issues, calling for long-term solutions. "Every monsoon we face the same problem, but this time it's unprecedented. The authorities need to upgrade the drainage infrastructure instead of temporarily fixing it," said Pranjal Lahon, a school teacher said.


Time of India
5 hours ago
- Time of India
Time of reckoning: As rains knock on capital's doors, MCD claims major desilting work done
New Delhi: The Municipal Corporation of Delhi claimed that it had achieved more than its goal of collecting and transporting around 1.3 lakh tonnes of silt dug out from drains deeper than 4 ft within its jurisdiction before the monsoon began. "Against a target of 1,26,474 tonnes of silt to be removed, in the first phase since Jan, we have collected 1,56,148 tonnes, which is 124% of the target," a municipal official said. MCD has 800 drains, spanning 530km, under its jurisdiction that are more than 4 ft deep. The first phase of silt removal was from Jan to May. MCD officials confirmed that the desilting target was achieved and, in fact more than the scheduled silt was removed in certain areas. "We will continue the task of clearing the drains over the next two months. As our drains carry mixed discharge and daily floating material is also dumped in the drains, regular cleaning is necessary to avoid overflowing of drains and flooding of areas. We are fully prepared to handle all situations during the monsoon," said an MCD official. The municipal corporation said that silt removal at three major drains — those at Defence Colony and Sunheri and the Kushak Nullah — was 85% completed and the remaining work was likely to be concluded within the next few days. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Free P2,000 GCash eGift UnionBank Credit Card Apply Now Undo Additionally, the sanitation department removed approximately 40,000 tonnes of silt from smaller drains, according to civic officials. Although MCD assigned the task of desilting drains 4 ft and deeper to contractors in Feb, the work faced delays and the civic body had to extend the deadline from May 31 to June 15. MCD is dumping the accumulated silt at the landfills at Bhalswa and Ghazipur but not at Okhla. Officials also claimed that at a few big drains that hadn't been taken over for maintenance by Delhi govt's irrigation and flood control department yet, MCD might take a few more days to complete their unclogging. The desilting work is done in two phases, with the first carried out prior to the monsoon between Jan 1 and May 31, when 60% cleaning is done of the drains more than 4 ft deep. The second phase is done after the arrival of the monsoon winds to facilitate uninterrupted flow of drains. In the second phase this year, the target is to remove 84,466.6 tonnes of silt, taking the total target to 2,13,859.5 tonnes. The civic body issued an order on Friday on the disbursement of Rs 25 lakh to each councillor under the local area development fund scheme. Instructions have been issued to use the money for repair work, acquisition of tiles and other works necessary to reduce waterlogging. The MCD circular said, "The funds can be used for maintenance works such as the engagement of tractor trolleys for lifting silt and malba, for carrying out repair work, procuring manhole covers, gully gratings, stone aggregate, coarse sand, pipes, etc., procurement of bags containing bitumen mixed material for undertaking patch repair after rains, procurement of slabs of different sizes for missing locations, minor repair at intersections, turnings, slip roads, or public spaces of larger gatherings. " It added that works would require the prior approval of the area councillor and cost estimates had to be booked with the planning section.