
The major infrastructural projects needed to give the West a boost and how much they will cost
At a breakfast briefing in Dublin, a delegation from the Northern and Western Regional Assembly (NWRA) presented Government Ministers, TDs, Senators and Senior Government officials with the report.
The report, 'Regional Infrastructure Priorities for the Northern and Western Region' identifies the need for a minimum €9 billion in capital investment needed across the region's transport, energy, education, water, and climate infrastructure.
These are specifically for the projects that could be costed at the time, with other projects to be costed at a later date. These initiatives are designed to address significant infrastructure deficits, unlock economic potential, and advance climate resilience in Ireland's most underfunded region.
NWRA Economist, John Daly said: 'Despite Ireland being regarded as one of the wealthiest economies in the EU, the Northern and Western Region of Ireland's transport infrastructure ranked in the bottom 20 at 218th out of 234 regions according to the European Commission's Regional Competitiveness Index'.
The publication of the report coincides with the public consultation on the revised National Development Plan (NDP), which remains open until 26th June 2025. The NDP is the Government's long-term vision and investment strategy for national infrastructure and public services, a crucial component of Project Ireland 2040.
Speaking at the event, NWRA Director Conall McGettigan stated: 'The Northern and Western Region has consistently received below-average investment in national infrastructure.
'This report aligns with the Regional Spatial and Economic Strategy 2020–2032 and presents a clear roadmap—with several projects already costed—to bring the region in line with national policy goals. It supports compact growth, regional accessibility, and sustainable development'.
Among the key projects proposed are:
· The N17 Knock to Collooney road scheme (€600 million)
· The Carrick-on-Shannon bypass and N4 upgrade (up to €500 million)
· Donegal TEN-T Projects (€790m to €915m)
· Phases 2 and 3 of the Western Rail Corridor (€400–600 million)
ADVERTISEMENT
· The Galway City Ring Road (€500 million to €1 billion)
· Strategic grid enhancement projects by EirGrid (€1.3 billion)
· Investments at Ireland West Airport Knock
· New capital projects at the Atlantic Technological University (€50m - €150 million)
NWRA Cathaoirleach Cllr Jarlath Munnelly added: 'The report highlights the severe regional imbalance in public capital investment. Between 2016 and 2024, the Northern and Western Region received just 5.7% of public tenders worth over €20 million, despite accounting for over 17% of Ireland's population'.
The NWRA developed the report following extensive consultation with all nine local authorities in the region, along with key infrastructure agencies including Transport Infrastructure Ireland, EirGrid, Uisce Éireann, and Atlantic Technological University.
The report will be transposed into a submission from the Northern and Western Regional Assembly on the review of the National Development Plan (NDP).
The submission to the NDP will aim to ensure the Northern and Western Region, through the provision of critical infrastructure, is fully empowered to meet Ireland's targets on housing, climate action, connectivity, and economic development.
The report on the Regional Infrastructure Priorities for the Northern and Western Region will be submitted as part of the NWRA's submission to the NDP consultation.
The Northern and Western Regional Assembly (NWRA) is one of three Regional Assemblies in the Republic of Ireland. It works with key stakeholders at EU, national, regional and local level to accelerate and optimise effective regional development.
As a public body charged with formulating Regional Policy, the NWRA advocates for greater economic development in the Northern and Western Region of Ireland, which covers the counties of Galway, Mayo, Roscommon, Sligo, Donegal, Leitrim, Cavan and Monaghan.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Irish Times
a day ago
- Irish Times
Eight new Cork rail stations to go to public consultation
Eight new potential rail stations and other Cork transport works are to be considered in a public consultation next week. The proposals include new stations at Blackpool, Monard, Tivoli, Carrigtwohill West, Water Rock, Ballynoe, Blarney and Dunkettle. A new fleet maintenance depot, which will be designed to cater for an electrified fleet of up to 150 carriages, will also be considered during the public consultation due to open on Wednesday. The proposals are part of the second phase of the Cork Area Commuter Rail Programme which, if fully delivered, will enable up to a 10-minute service frequency on all three Cork commuter lines. READ MORE The programme is funded by the National Transport Authority (NTA) under Project Ireland 2040, which also aims to address population growth, job creation and housing needs. It represents the largest investment in the Cork commuter rail network, and is noted as a key project in the Cork Metropolitan Area Transport Strategy 2040, which aims to reduce reliance on private vehicles in the area. Phase one of the programme involved the opening of a new platform at Kent Station in April. Commuters can now travel between Mallow in the north of the county and Cobh in the east without having to change trains at Kent. The first phase also incorporated the upgrading of the existing rail line between Glounthaune and Midleton to a twin track, which is expected to be finished next year. The project is set to facilitate a tripling of service frequency along the line. Former minister for transport Eamon Ryan previously said the programme represents 'the largest investment in the rail network in Cork undertaken by the State. It will completely transform transport in and around the city'. The consultation will be launched at Kent Station by Minister of State Jerry Buttimer, and will remain open to public submissions until Wednesday, July 23rd.


Irish Independent
a day ago
- Irish Independent
The major infrastructural projects needed to give the West a boost and how much they will cost
At a breakfast briefing in Dublin, a delegation from the Northern and Western Regional Assembly (NWRA) presented Government Ministers, TDs, Senators and Senior Government officials with the report. The report, 'Regional Infrastructure Priorities for the Northern and Western Region' identifies the need for a minimum €9 billion in capital investment needed across the region's transport, energy, education, water, and climate infrastructure. These are specifically for the projects that could be costed at the time, with other projects to be costed at a later date. These initiatives are designed to address significant infrastructure deficits, unlock economic potential, and advance climate resilience in Ireland's most underfunded region. NWRA Economist, John Daly said: 'Despite Ireland being regarded as one of the wealthiest economies in the EU, the Northern and Western Region of Ireland's transport infrastructure ranked in the bottom 20 at 218th out of 234 regions according to the European Commission's Regional Competitiveness Index'. The publication of the report coincides with the public consultation on the revised National Development Plan (NDP), which remains open until 26th June 2025. The NDP is the Government's long-term vision and investment strategy for national infrastructure and public services, a crucial component of Project Ireland 2040. Speaking at the event, NWRA Director Conall McGettigan stated: 'The Northern and Western Region has consistently received below-average investment in national infrastructure. 'This report aligns with the Regional Spatial and Economic Strategy 2020–2032 and presents a clear roadmap—with several projects already costed—to bring the region in line with national policy goals. It supports compact growth, regional accessibility, and sustainable development'. Among the key projects proposed are: · The N17 Knock to Collooney road scheme (€600 million) · The Carrick-on-Shannon bypass and N4 upgrade (up to €500 million) · Donegal TEN-T Projects (€790m to €915m) · Phases 2 and 3 of the Western Rail Corridor (€400–600 million) ADVERTISEMENT · The Galway City Ring Road (€500 million to €1 billion) · Strategic grid enhancement projects by EirGrid (€1.3 billion) · Investments at Ireland West Airport Knock · New capital projects at the Atlantic Technological University (€50m - €150 million) NWRA Cathaoirleach Cllr Jarlath Munnelly added: 'The report highlights the severe regional imbalance in public capital investment. Between 2016 and 2024, the Northern and Western Region received just 5.7% of public tenders worth over €20 million, despite accounting for over 17% of Ireland's population'. The NWRA developed the report following extensive consultation with all nine local authorities in the region, along with key infrastructure agencies including Transport Infrastructure Ireland, EirGrid, Uisce Éireann, and Atlantic Technological University. The report will be transposed into a submission from the Northern and Western Regional Assembly on the review of the National Development Plan (NDP). The submission to the NDP will aim to ensure the Northern and Western Region, through the provision of critical infrastructure, is fully empowered to meet Ireland's targets on housing, climate action, connectivity, and economic development. The report on the Regional Infrastructure Priorities for the Northern and Western Region will be submitted as part of the NWRA's submission to the NDP consultation. The Northern and Western Regional Assembly (NWRA) is one of three Regional Assemblies in the Republic of Ireland. It works with key stakeholders at EU, national, regional and local level to accelerate and optimise effective regional development. As a public body charged with formulating Regional Policy, the NWRA advocates for greater economic development in the Northern and Western Region of Ireland, which covers the counties of Galway, Mayo, Roscommon, Sligo, Donegal, Leitrim, Cavan and Monaghan.


Irish Times
2 days ago
- Irish Times
Republic may need to consider nuclear power to meet energy demand and climate goals, says EirGrid chairman
The Republic may have to consider using nuclear energy in the future as it bids to balance growing electricity demand while cutting greenhouse gas emissions, says EirGrid chairman Brendan Tuohy . The State-owned national electricity grid operator published figures this week showing it earned €10 million profit in the 12 months to the end of September, its last financial year. Mr Tuohy cautions in his statement that a lack of low-carbon options for generating electricity could disadvantage the Republic's efforts to lure investment in the future. He argues that to make fully-informed decisions, the State needs to know the impact of the wider choices available in other countries, while looking at the full range of options that it needs to consider. READ MORE 'Beyond that, serious consideration should be given on how to increase the range of options available to Ireland, and even though some options may not be popular – for example, the use of nuclear energy – it is important they are given serious consideration,' he says. Wind, solar and limited water – hydro – power supply the State's renewable electricity. Mr Tuohy notes that these are mainly intermittent, posing a challenge when wind or sun are not available. [ Will nuclear really power the AI boom? Opens in new window ] Other countries have nuclear power, geothermal energy, which taps the heat under the earth's surface, and large hydroelectric dams, he points out. The national grid chairman argues that this gives other nations an advantage in 'decarbonising their energy systems', which could have serious implications for the Republic's competitiveness. 'As such, it is vitally important that all possible options available are considered so as to ensure that Ireland's future energy system is one that is reliable, sustainable, internationally competitive and affordable,' he says. [ Ireland should consider small nuclear reactors to achieve zero-carbon energy by 2050, engineers' think tank urges Opens in new window ] The use of nuclear power is banned under the Republic's Electricity Regulation Act, 1999, but various groups have argued that the Government should consider this as an option for generating electricity, as it is cheap and does not emit greenhouse gas. Professional body, Engineers Ireland , has debated the use of smaller nuclear plants, called small modular reactors, in this country. However, experts caution that nuclear power raises risks with safety and waste. Mr Tuohy stresses that the Republic should continue with its pledge to play its part in tackling climate change and moving to a society that depends less on technology that emits carbon dioxide. Will rent reform make building apartments viable? Listen | 40:12 Challenges facing the State in this include building 'significant electricity infrastructure', that is 'generation, storage and transmission' quickly and efficiently. Expanding the grid should be understood as key to ensuring the Republic's 'international economic competitiveness', Mr Tuohy argues. EirGrid is planning 16 projects in the Republic to prepare the national grid to carry more electricity and to take on more renewables to meet a Government target of producing 80 per cent of power from green sources by 2030. System Operator Northern Ireland, which runs the grid in the North, plans three major projects to expand the grid there to meet increasing demand and climate action targets. EirGrid is also working on the Celtic Interconnector, a power line between the south coast and France that will allow electricity to flow between the two countries. The project is the first to connect this country directly with any part of European electricity network.