
Powys Council planning committee chairman re-elected
Powys County Council's planning committee chairman will remain in the hotseat for at least another year.
Councillor Gareth D Jones was re-elected at a behind closed doors annual meeting of the Planning, Taxi Licensing and Rights of Way committee on Thursday, May 22.
Cllr Adrian Jones was also given the thumbs up and voted in to continue as the committee's vice-chairman.
The role of committee chairman comes with a senior salary, which will mean that Cllr Gareth Jones will receive £9,886 on top of the councillor's basic salary of £19,771,
Likewise, as vice-chairman Cllr Adrian Jones will receive half a senior salary worth £4,943 on top of the basic.
The council was asked by the Local Democracy Reporting Service (LDRS) why the meeting which was closed to the press or public had not been published online later – as has been the case in the past.
A council spokesman said: 'The meeting was held via (Microsoft)Teams.
'It lasted three minutes as no change to the elected positions of chair and vice chair.'
Last year Cllr Gareth Jones, who represents Llanfair Caerenion and Llanerfyl, took the chair from previous incumbent Cllr Karl Lewis by just one vote.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Powys County Times
8 hours ago
- Powys County Times
One hour parking set to be reintroduced to Powys car parks
Powys County Council is proposing re-introducing the one-hour parking after controversial changes made last year. The recommendations have been made following the council's car park review which was the subject of criticism for damaging trade on the county's high streets. The review saw a series of meetings, focus groups, discussions, data analysis and benchmarking exercises and has led to 'revised recommendations for the county's car parking arrangements'. The review has recommended that the council 'reintroduce the one-hour parking tariff to all long stay car parks in accordance with the Local Authorities' Traffic Orders (procedure) (England and Wales) Regulations 1996'. The new tariffs for up to one hour of parking would be £1.50, one to two hours parking would remain £2.50, two to four hours parking would be £3.50 and all-day parking would be £5. The review has also recommended the Powys County Council 'introduce a new single car park permit to be used at one specified car park only' at a cost of £280 annually, £155 for 6 months, £90 for three months and £30 for one month. 'We appreciate that car parking arrangements in the county is a very emotive subject for our residents and businesses,' said Cllr Jackie Charlton, Cabinet Member for a Greener Powys. 'It was really important that we took the time to consider all options and take on board the feedback from the review group, the scrutiny committee, our residents, businesses and visitors. 'There is still more work to do with regards to the long-term plans for parking arrangements in the county but, for now, we believe that these recommendations will be acceptable to our communities, as well as being a feasible, sustainable and affordable option for the council to deliver within our tight budget constraints.' Help support trusted local news Sign up for a digital subscription now: As a digital subscriber you will get Unlimited access to the County Times website Advert-light access Reader rewards Full access to our app The car parking review process has been conducted by a politically balanced cross-party group of local councillors, included representatives from town councils and local businesses where car parks are sited, and was led by an independent, impartial consultant. As well as car parking tariffs, the car parking review considered how best to manage all the 'council's car parks, town centre footfall, the impacts and benefits of local active travel schemes, available resources, the needs of the local communities and the council's Sustainable Transport Hierarchy'. Powys County Council have said 'work will continue over time to address all these aspects with a vision to create sustainable car parks fit for the future of Powys'


Wales Online
10 hours ago
- Wales Online
200m steel fence blocking beauty spot view to be removed after public outcry
200m steel fence blocking beauty spot view to be removed after public outcry The 2.1m-tall steel fence appeared suddenly and without warning across the face of Gilwern mountain in the Bannau Brycheiniog National Park and close to the boundary of the Unesco Blaenavon World Heritage site in April The fence that has been out across the Pwll Du Road on Gilwern Mountain, north Monmouthshire (Image: Local Democracy Reporting Service ) A massive fence erected without consultation across a mountain and overlooking a scenic spot is set to be dismantled following public outrage. Residents were angered when the 6ft steel barrier was unexpectedly installed across the face of Gilwern mountain in the Bannau Brycheiniog National Park and near the boundary of the Unesco Blaenavon World Heritage site in April. Locals dubbed the 200m long galvanised steel structure with sharp spikes the Great Wall of Clydach and demanded its removal sparking a planning dispute. Monmouthshire County Council, which argued it had to intervene to prevent people from accessing Pwll Du Road that runs across the face of the mountain and has been closed to traffic due to safety concerns for the past five years, has now agreed to take the gate down. The council has announced it will instead use stock fencing and the posts at either end of the road, supporting the fence, will be reduced in height. It will also be painted to blend in with the surrounding countryside. Farmer Wayne Elliot has been battling Monmouthshire council over the road, that is now fenced off, since 2020 (Image: Local Democracy Reporting Service ) Independent county councillor for Llanelly Hill Simon Howarth said during a recent assembly at Clydach village hall council authorities announced a plan to tender the dismantling of an unpopular fence for approximately £20,000 – a figure that has unsettled many residents. Article continues below The councillor said: "The fence is coming down. They did say they are going out to tender and the cost is around £20,000, which hasn't gone down very well. We shouldn't have got here." Following the uproar over the original £40,000 expense to erect the barrier it will now be replaced by a less obtrusive 1.5m-high stock fence while the current posts and concealed gates that bar vehicle access will remain in place. Cllr Howarth expressed frustrations about the financial impact, saying: "Overall we are where we should have started but around £50,000 to £70,000 worse off." The 2.1m-tall steel fence overlooks the village of Clydach in the Bannau Brycheiniog National Park (Image: Local Democracy Reporting Service ) The councillor said he was also pleased the council has said it will allow access to the back side of the fence, between it and the mountainside, for cyclists and pedestrians though some points still have to be made safe. He also said the council will hold talks with farmers and commoners over access for moving stock from the Keeper's Pond end of the mountain road, which he welcomed. Article continues below A council spokesman said: "Following a positive meeting the local community and the council agreed with the proposal to reduce the height of the back line of the palisade fencing, replacing it with stock proof fencing and painting the reveals and pillars with a suitable colour to blend in with the landscape." Earlier safety measures, such as installing gates and boulders, had been ineffective since they were frequently damaged or removed. As a result of a 2023 rockfall incident the council commissioned another report, which proposed banning pedestrians in addition to vehicles from using the road. That report also suggested potential alternatives including the creation of new footpaths above and below the current road and realigning the road farther into the mountain. However the council has said these alternatives would require a multi-million-pound outlay.


BBC News
13 hours ago
- BBC News
Decision deferred on Ripon petrol station site flats plan
A decision on whether to allow flats to be built on the site of a former petrol station in Ripon has been deferred by Fuel Oils had sought permission from North Yorkshire Council to build a four-storey six-apartment block on the site of Skellbank Garage, in a meeting on Monday, councillors heard the application was "strongly" supported by Ripon City Council, while Ripon Civic Society had welcomed changes to the original officials recommended the plans be turned down as the height of the new building would be "harmful" to the setting of a nearby listed building, and councillors decided to discuss the application again at a future date. A report seen by councillors stated that the design of the proposed development, which included three two-bed flats and three one-bed flats, "fails to reflect local characteristics of the Ripon Conservation Area at ground floor level".It would prove "harmful to the character of that conservation area and, through its form, the setting of the adjacent listed building", it the report also raised concerns that no ground stability report had been carried out, despite the site being in "an area with shallow gypsum that could cause subsidence".Documents supporting the application stated that the site, which had been vacant for over 20 years, was currently boarded off and in poor condition, according to the Local Democracy Reporting underground tanks from the former petrol station had been removed, the documents heard that Harrogate Borough Council, which was abolished in 2023, approved a plan in 2003 to demolish the former petrol station and build eight that work never took place and the permission had since lapsed, and a similar plan for the site which was submitted in 2016 was withdrawn three years later. Listen to highlights from North Yorkshire on BBC Sounds, catch up with the latest episode of Look North.