logo
Yogi Adityanath to inaugurate Gorakhpur Link Expressway today

Yogi Adityanath to inaugurate Gorakhpur Link Expressway today

Hindustan Times20-06-2025
Chief minister Yogi Adityanath will inaugurate the Gorakhpur Link Expressway on Friday, marking a major boost to road connectivity in eastern Uttar Pradesh and being hailed as the new gateway to the region's development.
The inauguration ceremonies will be held at both ends of the 91.35-kilometre expressway — at Salarpur in Azamgarh and the Bhagwanpur toll plaza near Gorakhpur.
After the formal launch at Salarpur, the chief minister will travel along the expressway to Gorakhpur, where he will conclude the inauguration.
The Gorakhpur Link Expressway stretches from Jaitpur (near National Highway-27) in Gorakhpur to Salarpur in Azamgarh, where it connects to the Purvanchal Expressway.
Spanning four districts—Gorakhpur, Sant Kabir Nagar, Ambedkar Nagar, and Azamgarh—the fully access-controlled, four-lane expressway is designed for future expansion to six lanes, said a press statement issued by the state government on Thursday.
Gorakhpur district magistrate Krishna Karunesh confirmed that preparations for the inauguration ceremony have been completed at both Salarpur in Azamgarh and Bhagwanpur near Gorakhpur.
The project, including land acquisition, has a total cost of ₹7,283.28 crore. Construction was divided into two phases: Jaitpur to Phulwaria (48.317 km) by APCO Infratech Pvt Ltd, and Phulwaria to Salarpur (43.035 km) by Dilip Buildcon Ltd.
The new expressway is expected to reduce travel time between Gorakhpur and Lucknow to just 3.5 hours.
The Gorakhpur Link Expressway will also reduce travel time between Gorakhpur city and its southern areas such as Urwa, Dhuriyapar, Khajni, and Belghat. Travel from Gorakhpur to Urwa, which currently takes around an hour, will now take just 20–25 minutes via the expressway, said the press statement.
During the event at the Bhagwanpur toll plaza, the chief minister will flag off the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) security fleet designed for commuter safety on the expressway. The fleet comprises five Innovas, five Campers, four ambulances, two cranes, and a Hydra vehicle. A full rehearsal of the security deployment was conducted on Thursday at the toll plaza.
Advanced Traffic Management Systems (ATMS) have also been installed along the expressway. These include CCTV surveillance, automatic number plate recognition (ANPR), and speed monitoring systems to enhance road safety and enforce traffic regulations.
The chief minister will visit photo galleries set up by UPEIDA at both Azamgarh and Gorakhpur ends of the expressway. He will also pose for photographs with personnel from the construction agencies to appreciate their contribution and boost their morale.
To mark the occasion, the chief minister will plant a Harishankari sapling near the Bhagwanpur toll plaza. Ministers and public representatives accompanying him will also participate in the plantation ceremony, commemorating the event with a green initiative.
UTTAR PRADESH'S SEVENTH OPERATIONAL EXPRESSWAY
The Gorakhpur Link Expressway will be Uttar Pradesh's seventh operational expressway, five of which have been completed in the last eight years. Currently, construction is underway on three additional expressways, a press statement issued by the state government.
Eight more expressways are in the proposal stage, the statement added.
With the inclusion of the Gorakhpur Link Expressway, Uttar Pradesh now holds the distinction of having the longest network of expressways in the country. These high-speed corridors are playing a pivotal role in fast-tracking the state's economic growth and regional connectivity.
Expressways currently operated by UPEIDA in UP include Purvanchal Expressway: Lucknow to Ghazipur (341 km), Bundelkhand Expressway: Chitrakoot to Etawah (296 km), Agra-Lucknow Expressway: Agra to Lucknow (302 km), Yamuna Expressway: Greater Noida to Agra (165 km), Delhi-Meerut Expressway: Meerut to Delhi (82 km), Noida-Greater Noida Expressway (25 km), Gorakhpur Link Expressway (91 km) (will be operational from Friday).
Expressways under construction are Ganga Expressway (591 km), Ballia Link Expressway (35 km) and the Lucknow-Kanpur Expressway (63 km).
OVER RS 2000 CRORE GIVEN TO FARMERS
Compensation totaling ₹2,030.29 crore has been disbursed to 22,029 farmers whose land was acquired for the Gorakhpur Link Expressway project.
Chief minister Yogi Adityanath personally honoured the farmers who provided land during the initial phase of the project. Their role will once again be acknowledged during the official inauguration of the Gorakhpur Link Expressway on Friday, said a press statement issued by the state government.
For the 91.35-kilometre expressway, approximately 1,148.77 hectares of land was acquired from farmers across 172 villages spread over four districts: Gorakhpur, Sant Kabir Nagar, Ambedkar Nagar and Azamgarh.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

UP govt signs MoU with UK for Chevening scholarship for study at Britain's top varsities
UP govt signs MoU with UK for Chevening scholarship for study at Britain's top varsities

Indian Express

time4 hours ago

  • Indian Express

UP govt signs MoU with UK for Chevening scholarship for study at Britain's top varsities

The Uttar Pradesh government on Tuesday signed a memorandum of understanding (MoU) with the United Kingdom's Foreign, Commonwealth & Development Office (FCDO) for the 'Chevening-Atal Bihari Vajpayee Uttar Pradesh State Government Scholarship Scheme' under which five meritorious students from the state will pursue master's degrees at Britain's leading universities every year. The agreement was signed in Lucknow by British High Commissioner to India, Lindy Cameron, in the presence of Chief Minister Yogi Adityanath. The UP Cabinet had recently approved the proposal for the scholarship scheme. Speaking on the occasion, Chief Minister Adityanath said this scholarship scheme will serve as a powerful platform to transform the state's education system and prepare the youth for global leadership roles. The scheme, he emphasised, aimed to enable meritorious students to achieve excellence in education, research, and leadership at the international level. The programme will commence from the academic session 2025-26 and run for three years, with the possibility of renewal from the 2028-29 session. The CM urged the students to 'seize this opportunity and enhance the pride of both the state and the country'. The scholarship covers tuition, examination and research fees, living allowances, and airfare to and from the UK. The total cost per student is estimated to be £38,048 to £42,076 (Rs 45–48 lakh), with the state government contributing around £19,800 (Rs 23 lakh) and the remainder funded by the FCDO. The British High Commissioner highlighted that under the scholarship scheme, five students will receive full scholarships to study in the UK each year for the next three years. This initiative reflects the strengthening ties between India and the UK, an official statement said, adding this comes in the wake of Prime Minister Narendra Modi's recent visit to the UK, where he had signed the Trade Agreement and Vision 35, opening new avenues for business and education. On August 7, the state Cabinet had given nod to the draft proposal titled 'Bharat Ratna Shri Atal Bihari Vajpayee-Chevening Uttar Pradesh State Government Scholarship Scheme'. The government then announced that the scholarship will provide for students' stay and study at top UK institutions like the universities of Oxford, Cambridge, Edinburgh, and the Landon School of Economics and Political Science (LSE). UP Higher Education Minister Yogendra Upadhyay then had stated the scheme will be renewed or extended thereafter. He had also said the funding will be equally shared by the state government and FCDO. The state government has cleared Rs 2 crore for the current financial year for the programme, it is learnt.

Forensic experts stress strong security against digi fraud
Forensic experts stress strong security against digi fraud

Time of India

time7 hours ago

  • Time of India

Forensic experts stress strong security against digi fraud

Lucknow: With rising number of online/cyber/digital fraud cases, importance of cybersecurity, digital audits and cyber insurance had become crucial, said experts at a seminar organised by UP State Institute of Forensic Sciences (UPSIFS). The session highlighted Chief Minister Yogi Adityanath's initiatives to strengthen the state's cybersecurity framework. UPSIFS additional director Rajeev Malhotra said Yogi govt adopted a tough stance against cybercrimes, while stressing need for continuous education, teamwork and ethical clarity and highlighted India's DPDP Act and global policies like GDPR as key to protecting data. Cybersecurity expert Pawan Sharma from US underlined that digital audits formed foundation for assessing organisational risks, while Cisco representatives said companies were shifting from annual audits to continuous, risk-based assessments. Zscaler experts emphasised internal upskilling and certifications such as CompTIA Security+ and CISSP. UPSIFS expert Manish Kumar Rai urged adopting global perspectives, citing ransomware risks and stressed that only continuous assessments could ensure strong digital security. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.

UP's 1st State Hotel Mgmt Instt to be ready in 2 months
UP's 1st State Hotel Mgmt Instt to be ready in 2 months

Time of India

time8 hours ago

  • Time of India

UP's 1st State Hotel Mgmt Instt to be ready in 2 months

: Uttar Pradesh's first State Institute of Hotel Management (SIHM) is set to be completed within next two months, marking a significant step in CM Yogi Adityanath's push to boost the state's hospitality and tourism sector. Tired of too many ads? go ad free now Tourism deputy director Rajendra Prasad Yadav said the project's first phase has already achieved 95% progress The full completion is targeted by the end of Sept and the inauguration could take place any time after that, he said. The institute is coming up opposite the GIDA office here and will begin offering degree and diploma courses in hotel, tourism, and hospitality management from the next academic session. Construction began in Sept,2023, and so far over Rs38.42 crore has been spent on the first phase, which is estimated to cost Rs48.39 crore. This phase includes two academic blocks with classrooms, administrative offices, common halls, kitchens, underground parking, fire safety systems, and other modern facilities required for training in the hospitality sector. The second phase, with an estimated cost of Rs46.81 crore, started in May this year. includes a five-storey boys' hostel with 128 rooms and a girls' hostel with 84 rooms. This phase is expected to be completed by 2027. Officials said the SIHM will play a crucial role in addressing the growing demand for skilled manpower in the hospitality industry while also opening up new avenues of employment for youth in the Purvanchal region. tnn

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store