logo
2025 Bajaj Dominar 400: 5 Updates Keeping It Fresh

2025 Bajaj Dominar 400: 5 Updates Keeping It Fresh

NDTV14 hours ago
Bajaj recently launched the 2025 update of the Dominar 400 in India at a price tag of Rs 2.39 lakh (ex-showroom). The 2025 Bajaj Dominar 400 gets a bunch of upgrades over its previous iteration. As part of the updates, the brand revised the feature list, added more touring equipment, and made ergonomic revisions to the 2025 Dominar 400.
Digital Screen
The 2025 Bajaj Dominar 400 has now been updated with the same digital console as seen on the Pulsar NS400Z. This is a color LCD bonded glass speedometer that works with a new switchgear. It is enabled with smartphone connectivity, turn-by-turn navigation, call, and SMS alerts. The previous interaction of the Dominar 400 featured a secondary console near the fuel tank, which is now removed to place a USB port.
Old Bajaj Dominar 400 display and screen
Traction Control
Bajaj has also equipped the 2025 Dominar 400 with a traction control system. That allows riders to ensure a safe turn and braking in wet or loose conditions. The older Dominar 400 did not get this feature.
Ride Modes
The 2025 Bajaj Dominar 400 now comes with four riding modes: Rain, Road, Sport, and Off-Road. While the older Dominar missed out on the riding modes. Also, the brand has equipped the 2025 Dominar 400 with ride-by-wire technology, while the 2025 Dominar 250 retains the mechanical throttle from the previous model.
Ergonomic Adjustment
Bajaj has now readjusted the handlebars of the Dominar 400 with its recent update, which promises to provide a better riding position and stance to the rider. Also, it now gets a rear luggage carrier featuring a built-in GPS mount.
Engine
While the 2025 Bajaj Dominar 400 retains the power unit from its preceding model, it has now been tuned to comply with the OBD-2B norms. It is powered by a 373.3cc, liquid-cooled, single-cylinder engine, capable of delivering a peak power and torque output of 39 hp and 35 Nm, respectively.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

By early next yr, you won't have to pay toll at Kherki Daula toll plaza
By early next yr, you won't have to pay toll at Kherki Daula toll plaza

Time of India

time3 hours ago

  • Time of India

By early next yr, you won't have to pay toll at Kherki Daula toll plaza

Gurgaon: Residents of new sectors and Manesar businesses could finally get relief from regularly paying toll charges on NH-8 from next year. The National Highways Authority of India (NHAI) has prepared an estimate of Rs 18 crore to shift the existing toll plaza from Kherki Daula to Pachgaon, some 15km apart. An NHAI official said on Monday that the proposal for the new facility, which will have 12 lanes, has been sent to the authority's headquarters in Delhi for approval. NHAI has set a target of four months to complete construction of the plaza. But technical components such as digital toll infrastructure will be handled by the Indian Highway Management Company Ltd (IHMCL), and this could take a few more months. You Can Also Check: Gurgaon AQI | Weather in Gurgaon | Bank Holidays in Gurgaon | Public Holidays in Gurgaon The Kherki Daula facility will operate till the new one is opened. "The new toll plaza is expected to be operational only by early next year," the official said. TOI reported last month that Pachgaon was chosen to shift the toll plaza because it lies beyond Gurgaon and Manesar, and was close to an interchange to take the Western Peripheral Expressway. The relocation of the toll from Kherki Daula has been a long-pending demand from residents of new sectors along the Dwarka Expressway , and industrialists in Manesar. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Is it better to shower in the morning or at night? Here's what a microbiologist says CNA Read More Undo Commuters argue that the toll puts financial burden on residents and impedes free movement of vehicles and goods to and from industrial hubs in the region. The Haryana govt in 2014 promised to relocate the Kherki Daula toll, and a similar announcement was made by Union road transport and highways minister Nitin Gadkari in Aug 2017. Multiple timelines were floated, but execution was repeatedly delayed due to inaction and land acquisition problems. The opening of Dwarka Expressway last year increased traffic in the area and gave fresh impetus to residents' and commuters' demands. In a written reply to a question in Lok Sabha this March, the road transport ministry admitted that toll collected on NH-8's Delhi to Gurgaon stretch – called the Delhi-Gurgaon Expressway – was around Rs 2,775 crore, 11% higher than the cost incurred to build this portion of the highway. According to the proposal, the Pachgaon plaza will be a multi-lane free flow system, a toll without barriers that will allow transactions through FASTag. It will also be equipped with cameras and RFID (radio frequency identification) readers that will recognise vehicle registration numbers. A senior NHAI official said the authority will take possession of 28 acres of land where the new toll plaza will come up. "We are in the final stages of land takeover. Once the site is physically handed over to us, civil work will begin. The project will be executed in coordination with IHMCL, which will install and commission the technical components," the official said. To expedite this work, NHAI plans to change the scope of work to an agency, which was awarded the contract to renovate stretches along NH-8 in Gurgaon. "The agency is engaged for development of flyovers on NH-8. Now, it will also handle construction of the new toll plaza. We are amending the project scope to include this component. This will save time on carrying out the tender process all over again," the official said. Construction work will involve building lanes, setting up canopy, putting up road markings, signage, lighting, and the administrative office. IHMCL, a company promoted by NHAI to implement and manage electronic toll collection (ETC) systems, will be responsible for installing automatic number plate recognition (ANPR) cameras, sensors and other equipment for the plaza. Ravi Kant Sharma, a resident of Winter Hills in Sector 77, said he "hopes" the toll plaza is finally shifted out of Kherki Daula. "Every year, we hear that the toll plaza will shift, but it never happens. The idea of having to pay a toll to get home is absurd. It is an everyday burden. And for years, we have been penalised just for making 'new Gurgaon' our home. We can only hope this time that the shifting actually happens," Sharma said.

Review meeting held to fast-track infrastructure projects worth Rs 36,296 crore in Gujarat, Rajasthan
Review meeting held to fast-track infrastructure projects worth Rs 36,296 crore in Gujarat, Rajasthan

India Gazette

time4 hours ago

  • India Gazette

Review meeting held to fast-track infrastructure projects worth Rs 36,296 crore in Gujarat, Rajasthan

New Delhi [India], July 7 (ANI): A high-level meeting was convened to review key issues impacting major infrastructure projects in Gujarat and Rajasthan, with a focus on resolving bottlenecks through the Project Monitoring Group (PMG) mechanism. A total of 22 issues related to 18 critical projects--collectively valued at over Rs 36,296 crore--were taken up for discussion at the meeting that was held on July 3, 2025, the Commerce Ministry said in a release on Monday. Among the major initiatives discussed was the Transmission System Strengthening Scheme for the evacuation of power from solar energy zones in Rajasthan and Gujarat, with a projected investment of Rs 14,147 crore. The scheme aims to facilitate seamless integration of renewable energy into the national grid by developing high-capacity transmission infrastructure, including substations and transmission lines. In Rajasthan, the scheme targets solar zones in Jaisalmer, Bikaner, and Barmer, while in Gujarat, the focus areas include Surendranagar, Patan, and Kutch. 'These projects are crucial for evacuating solar power from renewable energy-rich regions and delivering it reliably to consumption centres across India. The meeting focused on addressing key challenges such as right-of-way (RoW) and land acquisition to accelerate progress,' the statement from the commerce ministry said. The meeting also reviewed the 5G/4G network expansion project of Reliance Jio, recognised as a project of national importance. The initiative seeks to extend 5G mobile services to uncovered and remote areas, while also strengthening existing 4G infrastructure. Discussions were held with the State Government to expedite resolution of pending forest-related issues. Once completed, the project will significantly improve digital connectivity, especially in remote and strategically important regions. Principal Economic Adviser, Department for Promotion of Industry and Internal Trade (DPIIT), Praveen Mahto, who chaired the meeting, reaffirmed the Government's commitment to strengthening the institutional framework for project monitoring. He directed the concerned authorities to adopt a proactive approach in resolving pending issues. Mahto also underlined the importance of private project proponents actively leveraging the Project Monitoring Group (PMG) platform ( to accelerate implementation. He emphasised that effective coordination among Central Ministries, State Governments, and private stakeholders are essential for timely and efficient resolution of project-related concerns. (ANI)

DPIIT reviews 22 issues affecting infra projects worth Rs 36,296 cr in Guj, Raj
DPIIT reviews 22 issues affecting infra projects worth Rs 36,296 cr in Guj, Raj

Time of India

time5 hours ago

  • Time of India

DPIIT reviews 22 issues affecting infra projects worth Rs 36,296 cr in Guj, Raj

The Department for Promotion of Industry and Internal Trade (DPIIT) has reviewed 22 issues affecting 18 infrastructure projects worth Rs 36,296 crore in Gujarat and Rajasthan, an official statement said on Monday. The meeting, chaired by DPIIT Secretary Amardeep Bhatia, was attended by senior officials from central ministries, state governments, and project proponents. "A total of 22 issues related to 18 critical projects, collectively valued at over Rs 36,296 crore, were taken up for discussion," the commerce and industry ministry said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 15 Most Beautiful Female Athletes in the World Click Here Undo Among the major initiatives discussed was the Transmission System Strengthening Scheme for evacuation of power from solar energy zones in Rajasthan and Gujarat, with an investment of Rs 14,147 crore. The scheme aims to facilitate seamless integration of renewable energy into the national grid by developing high-capacity transmission infrastructure, including substations and transmission lines. Live Events It said that the meeting also reviewed the 5G/4G network expansion project of Reliance Jio, recognised as a project of national importance. PTI

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store