logo
Chandigarh: For two weeks, traffic violators had free run as CCTVs didn't generate challans

Chandigarh: For two weeks, traffic violators had free run as CCTVs didn't generate challans

Hindustan Times18-07-2025
For over two weeks, traffic violators in Chandigarh had a free run as the integrated command and control centre (ICCC) cameras stopped issuing challans from June 25 to July 10 due to a payment issue between the Chandigarh municipal corporation (MC) and Bharat Electronics Limited (BEL), the company operating the system. Under Chandigarh Smart City Limited (CSCL), BEL was awarded a contract to operate ICCC services, including cameras and their software. (HT File)
Sources revealed that the MC owes BEL a whopping ₹20 crore. The city has over 2,000 cameras, including those monitoring traffic violations, city's entry-exit points, schools, hospitals, parking lots, and community centres, connected to the ICCC. On an average, the ICCC cameras record and issue around 1,800 challans a day for speeding, red-light jumping, and other violations.
The non-functional challan system created a backlog of nearly 25,000 pending traffic fines, which are now being uploaded on the National Informatics Centre (NIC) platform in bulk. 'The cameras were operational and recorded violations during this period, but no automated challans were generated due to the suspension of services. Now, these pending challans are being uploaded together,' confirmed an official familiar with the matter. There is a 15-day limit to issue challans by uploading the data on NIC based on recorded footage. Any violation recorded after this period cannot be legally challaned. In the last 15 days, no challans have been issued, leading to thousands of violations going unchecked.
Why the shutdown happened
Under Chandigarh Smart City Limited (CSCL), BEL was awarded a contract to operate ICCC services, including cameras and their software. BEL was to receive ₹1 crore every month for operations and maintenance. However, after the administration dissolved CSCL on March 31, its projects were redistributed among various departments, with ICCC being handed over to the MC. The corporation is yet to clear BEL's dues for the past 12 months, amounting to ₹12 crore in operational payments, ₹7 crore as capital expenditure for material installation, and an additional ₹60 lakh for police station camera surveillance. As a result, BEL had stopped its services from June 25, effectively suspending ICCC's software and shutting down access to the app, which powers the Police Command Control Centre (PCCC). The ICCC project is slated to run until 2027. The MC is currently verifying bills submitted by the company before them.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model
Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model

Time of India

time3 hours ago

  • Time of India

Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model

Chandigarh: In a significant move, approximately 100 buildings of the municipal corporation (MC) are all set to have solar energy on their rooftops, as the Chandigarh Renewable Energy and Science and Technology (CREST) has sent a detailed MoU to be signed with the corporation for this project. As per the proposal, the MC will not have to spend even a single penny on this project, and they will earn around Rs 40 lakh annually as rent from the private company. Now, this detailed MoU is coming in the monthly general house meeting of the MC, scheduled for Tuesday, for deliberation and subsequent approval of the members. As per the proposal, the solar panels will be installed under a 'Rent-a-Roof', Resco Model (Renewable Energy Service Company) framework, where the selected company through bids will install the solar on all the selected buildings' rooftops, maintain them, and pay rent to the MC. The move came following a high-level meeting under the chairmanship of chief secretary Rajiv Verma, recently. The proposal of the CREST, a copy of which is with TOI, reads, "Chandigarh administration has been consistently working towards the saturation of rooftop solar installations across all govt and private buildings in the city. To utilise this potential effectively, CREST proposes the implementation of grid-connected rooftop solar plants on MC buildings through the 'rent-a-roof' framework. Under this model, the developer offering the highest rooftop rent per unit of energy generated shall be selected through competitive bidding. This will ensure regular revenue for MC, with zero capital expenditure or maintenance responsibility." The letter further reads, "The rent-a-roof approach allows MC to monetise its rooftop assets, receive guaranteed bi-monthly income, and avoid long-term tariff commitments. The total feasible rooftop solar capacity assessed on MC buildings is approximately 3MW. Based on generation potential and other parameters, MC stands to earn an estimated Rs 39-40 lakh per year, depending on the rent rate received through bidding." Following this, CREST has requested approval of the proposed model and MoU and timely consent to initiate the process. Once approved by the MC's general house, the CREST shall thereafter proceed with the tendering and execution of the project in coordination with the MC. Key Terms of MoU Rooftop rent to be paid by the Resco developer bi-monthly based on the energy generation under the gross metering arrangement No damage to MC roofs - any structural damage to be repaired by the Resco Water supply for periodic solar panel cleaning to be provided by MC Plant security to be provided by MC Insurance and operational responsibilities lie with Resco Escrow mechanism for transparent and timely rent transfers

DefMin signs Rs 2K-cr deal with BEL
DefMin signs Rs 2K-cr deal with BEL

Hans India

time4 hours ago

  • Hans India

DefMin signs Rs 2K-cr deal with BEL

New Delhi: The Ministry of Defence on Friday signed a contract with public-sector defence company Bharat Electronics Ltd (BEL) for the procurement of Air Defence Fire Control Radars for the Indian Army, worth approximately Rs2,000 crore, under the Buy (Indian-Indigenously Designed Developed and Manufactured) category. With a minimum 70 per cent indigenous content, these Fire Control Radars will be able to detect all forms of airborne threats, including fighter aircraft, attack helicopters and enemy drones. This would mark a significant milestone in the modernisation of the Air Defence Regiments and enhance the Indian Army's operational readiness, while contributing to the economic growth of the nation, according to a Defence Ministry statement. The contract was signed and exchanged by senior officials of the Ministry of Defence and BEL in the presence of Defence Secretary Rajesh Kumar Singh. The procurement marks a pivotal step towards empowering indigenous defence industries by encouraging Indian MSMEs through components manufacturing and raw material supply, the statement said. The government is keen to promote the country's defence industry, and earlier this month Defence Acquisition Council, under the chairmanship of Defence Minister Rajnath Singh, gave the go-ahead for 10 proposals to purchase military hardware, including missiles and electronic warfare systems, worth approximately Rs 1.05 lakh crore through indigenous sourcing. India's indigenous defence production has surged to an all-time high of Rs1.46 lakh crore, with exports increasing to a record Rs24,000 crore in 2024-25, according to Defence Minister Rajnath Singh.'Our defence production, which was only Rs43,000 crore 10 to 11 years ago, has now crossed a record figure of Rs1,46,000 crore, with the private sector's contribution of over Rs32,000 crore. Our defence exports, which were around Rs600-700 crore 10 years ago, have surpassed a record figure of Rs24,000 crore today,' the minister stated in his address at the Confederation of Indian Industry (CII) annual summit recently. He described Make-in-India as crucial for security and prosperity, stating that the use of indigenous systems during Operation Sindoor has proved that India has the power to penetrate any armour of the enemy.

Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model
Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model

Time of India

time7 hours ago

  • Time of India

Chandigarh MC buildings set to get rooftop solar panels under rent-a-roof model

1 2 Chandigarh: In a significant move, approximately 100 buildings of the municipal corporation (MC) are all set to have solar energy on their rooftops, as the Chandigarh Renewable Energy and Science and Technology (CREST) has sent a detailed MoU to be signed with the corporation for this project. As per the proposal, the MC will not have to spend even a single penny on this project, and they will earn around Rs 40 lakh annually as rent from the private company. Now, this detailed MoU is coming in the monthly general house meeting of the MC, scheduled for Tuesday, for deliberation and subsequent approval of the members. As per the proposal, the solar panels will be installed under a 'Rent-a-Roof', Resco Model (Renewable Energy Service Company) framework, where the selected company through bids will install the solar on all the selected buildings' rooftops, maintain them, and pay rent to the MC. The move came following a high-level meeting under the chairmanship of chief secretary Rajiv Verma, recently. The proposal of the CREST, a copy of which is with TOI, reads, "Chandigarh administration has been consistently working towards the saturation of rooftop solar installations across all govt and private buildings in the city. To utilise this potential effectively, CREST proposes the implementation of grid-connected rooftop solar plants on MC buildings through the 'rent-a-roof' framework. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Bo Derek's Probably The Most Gorgeous 68-Year-Old. Paperela Undo Under this model, the developer offering the highest rooftop rent per unit of energy generated shall be selected through competitive bidding. This will ensure regular revenue for MC, with zero capital expenditure or maintenance responsibility." The letter further reads, "The rent-a-roof approach allows MC to monetise its rooftop assets, receive guaranteed bi-monthly income, and avoid long-term tariff commitments. The total feasible rooftop solar capacity assessed on MC buildings is approximately 3MW. Based on generation potential and other parameters, MC stands to earn an estimated Rs 39-40 lakh per year, depending on the rent rate received through bidding. " Following this, CREST has requested approval of the proposed model and MoU and timely consent to initiate the process. Once approved by the MC's general house, the CREST shall thereafter proceed with the tendering and execution of the project in coordination with the MC. Key Terms of MoU Rooftop rent to be paid by the Resco developer bi-monthly based on the energy generation under the gross metering arrangement No damage to MC roofs - any structural damage to be repaired by the Resco Water supply for periodic solar panel cleaning to be provided by MC Plant security to be provided by MC Insurance and operational responsibilities lie with Resco Escrow mechanism for transparent and timely rent transfers

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store