
Murray Brook Minerals, Puma's Subsidiary, Closes $220,000 Private Placement
RIMOUSKI, Quebec, May 27, 2025 (GLOBE NEWSWIRE) — Puma Exploration Inc. (TSXV: PUMA) ('Puma'), announces that its subsidiary, Murray Brook Minerals Inc. ('MBM' or 'Murray Brooks Minerals') has closed a non-brokered offering consisting of 4,400,000 flow-through common shares (the 'FT Shares') of MBM at a price of C$0.05 per FT Share for aggregate gross proceeds of $220,000 (the 'FT Offering'). Following the FT Offering, Murray Brook Minerals has now 28,044,165 common shares issued and outstanding, with no warrants or options. Puma holds 23,644,165 common shares of MBM, representing approximately 84.3% of its issued and outstanding shares.
The proceeds of the FT Offering will be used to advance the Legacy Project, a copper and silver asset, previously held by Puma and contiguous to Puma's McKenzie Gold Project in Northern New Brunswick.
As part of Puma's successful DEAR strategy, the Murray Brook Minerals business model is to acquire prospective strategic and critical metals mineral properties with excellent discovery potential that a stand-alone public company can explore and develop. This business model provides Puma's investors with equity interests in another explorer and developer and exposure to other commodities while Puma continues to focus on its gold assets.
As a reminder, Puma spun out in 2021 its copper assets to Canadian Copper (CSE: CCI) under an option transaction and subsequently, the Puma shareholders received common shares of CCI upon its listing on the CSE in 2022. Puma currently owns a 9.5% stake in CCI. Over the past three years, CCI has developed and grown its assets and has recently announced the results of a positive preliminary economic assessment (PEA) (
see Canadian Copper's News Release
dated
May 22, 2025
).
'We are thrilled to have a brownfield project close to our New Brunswick exploration offices with a copper/silver deposit outcropping at surface. Our effective low-cost exploration technique will help generate new drill-ready targets and potentially expand the existing Legacy Deposit. As Canadian Copper in 2022, Murray Brook Minerals will develop this asset and other potential projects. With this transaction, Puma enhances shareholder valuation while minimizing dilution,
' mentioned Marcel Robillard, President and CEO of Puma Exploration.
The Legacy Project
The Legacy Project is contiguous to the McKenzie Gold Project in Northern New Brunswick and consists of two (2) claim blocks covering 10,100 ha (Figure 1). The property is easily accessible, located less than 15 km from St-Quentin, where Puma has its field exploration office.
Figure 1. Location of the Legacy Project
The underexplored Legacy Project has a high potential for discoveries. The property hosts high-grade copper-silver skarns similar to Osisko Metals' Gaspé Copper in Québec. The Legacy and Gaspé Copper projects exhibit many similarities—they are part of the same Appalachian orogenic system, are of the same age, and exhibit the same mineralization and metal associations.
Legacy hosts a copper and silver deposit, the Legacy Deposit, with a historical resource estimate reported in 2015
(Independent Technical Report for the Legacy Project, Restigouche County, New Brunswick, Canada, Marek Nowak, Peng, Chris Barrett, CGeol, Tessa Scott, B.A., Effective Date: June 22, 2015
). A Qualified Person on behalf of Puma has not reviewed or verified the mineral resource estimate, therefore it is considered historical in nature and is reported solely to provide an indication of the magnitude of mineralization that could be present on the property.
Figure 2. 3D model of the Legacy Deposit from historic resource estimate*
The true thickness of the copper/silver deposit varies from 30 metres to 50 metres, with mineralization occurring over large intervals. The mineralized zone has been delineated at surface over a distance of about 200 metres and drilled to a depth of 400 metres, and it remains untested below that depth.
Puma plans to complete follow-up work on the historic drill-hole intersections showing significant copper/silver mineralization over long intervals. It will also use the same proven low-cost exploration strategy, used at the Williams Brook Project, to identify new prospective targets on the property.
Highlights from Historical Drilling*
In 1970, drill hole No. 17 returned a continuous section of 59.34 metres @ 1.22% Cu with three (3) important copper-bearing skarn zones:
1) 3.16 % Cu over 11.28 metres from 152.40 to 163.68 metres;
2) 1.84 % Cu over 10.42 metres from 167.64 to 178.06 metres;
3) 1.22% Cu over 13.47 metres from 188.98 to 202.45 metres.
The gold potential at Legacy was never assessed, although Hole MC-92-20 returned 4.00 m of 0.26% Cu, 6.08 g/t Ag, and 3.07 g/t Au from 43.00 m to 47.00 m downhole. Puma's detailed data compilation will study the metals zonation at Legacy and assess its copper/silver/gold potential.
*Independent Technical Report for the Legacy Project, Restigouche County, New Brunswick, Canada, Marek Nowak, Peng, Chris Barrett, CGeol, Tessa Scott, B.A., Effective Date: June 22, 2015
.
Use of Proceeds and Details
The gross proceeds of the FT Shares sold under the FT Offering will be used for Canadian Exploration Expenses (within the meaning of the
Income Tax Act
(Canada)) which qualify as a 'flow-through mining expenditure' for purposes of the
Income Tax Act
(Canada) related to the exploration program to be conducted on properties located in the Province of New Brunswick. MBM will renounce such Canadian Exploration Expenses with an effective date of no later than December 31, 2025.
The proceeds of the FT Offering will be used for data compilation, issuing a new 43-101 compliant technical report, targeting, and excavation operations to locate drilling targets at Legacy. The fieldwork program will cost at least $150,000.
Murray Brook Minerals paid $12,250 finders fee to arms-length finders. The FT Offering constitutes an 'Exempt Transaction' under the policies of the TSX Venture Exchange. All securities issued under the FT Offering will be subject to an indefinite hold period in accordance with applicable securities laws.
About Puma's Assets in New Brunswick
Puma has accumulated an impressive portfolio of prospective gold landholdings strategically located close to roads and infrastructure in Northern New Brunswick - the Williams Brook Project and the McKenzie Gold Project. Both are located near the Rocky Brook Millstream Fault ('RBMF'), a major regional structure formed during the Appalachian Orogeny and a significant control for gold deposition in the region. Puma's work to date has focused on the Williams Brook property, but prospecting and surface exploration work on its other properties have confirmed their potential for significant gold mineralization.
Qualified Person
The scientific and technical content of this press release has been prepared, reviewed, and approved by Mr. Dominique Gagné, P. Geo., Vice President of Exploration, who is a 'Qualified Person' as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ('NI 43-101').
About Puma Exploration
Puma Exploration is a Canadian-based mineral exploration company focused on finding and growing a pipeline of precious metals projects in New Brunswick, near Canada's Famous Bathurst Mining Camp. Puma has a long history in Northern New Brunswick, having worked on regional projects for over 20 years. Puma's successful exploration methodology, which combines old prospecting methods with detailed trenching and up-to-date technology such as Artificial Intelligence, has facilitated an understanding of the region's geology and associated mineralized systems. Armed with geophysical surveys, geochemical data and consultants' expertise, Puma has developed a perfect low-cost exploration tool to discover gold at shallow depths and maximize drilling results. Murray Brook Minerals (MBM) is a wholly owned subsidiary of Puma. The private company is focused on identifying prospective projects in Northern New Brunswick that could be monetized to the benefit of Puma shareholders.
Puma is committed to its DEAR business model of Discovery, Exploration, Acquisition and Royalties to generate maximum value for shareholders with low share dilution.
Connect with us on
Facebook
/
X
/
LinkedIn
.
Visit
www.explorationpuma.com
for more information or contact:
Marcel Robillard, President and CEO.
(418) 750-8510;
president@explorationpuma.com
Mia Boiridy, Head of Investor Relations.
(250) 575-3305;
mboiridy@explorationpuma.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements: This press release may contain forward-looking statements. Such forward-looking statements involve several known and unknown risks, uncertainties, and other factors that may cause the actual results, performance, or achievements of Puma to be materially different from actual future results and achievements expressed or implied by such forward-looking statements.
Readers are cautioned not to rely on these forward-looking statements, which speak only as of the date the statements were made, except as required by law. Puma undertakes no obligation to update or revise any forward-looking statements publicly. The quarterly and annual reports and the documents submitted to the securities administration describe these risks and uncertainties.
Figures
accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/7a862d32-b444-4cd4-a5de-701d560b2250
https://www.globenewswire.com/NewsRoom/AttachmentNg/767ed7e6-b6d3-412f-9291-c3d5f043cc84
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
4 hours ago
- Yahoo
Asante Provides Financial and Operating Results for the Quarter Ended April 30, 2025
VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) -- Asante Gold Corporation (CSE:ASE | GSE:ASG | FRANKFURT:1A9 | ('Asante' or the 'Company') announces the filing of its financial statements and management's discussion and analysis ('MD&A') for the three months ended April 30, 2025 ('Q1 2026'). All dollar figures are in United States dollars unless otherwise indicated. A summary of the financial and operating results for fiscal Q1 2026 are presented in this news release. For a detailed discussion of results for the first quarter, please refer to the Management's Discussion and Analysis filed on SEDAR+ at and Asante's website at Dave Anthony, President and CEO stated, 'We are pleased to report a significant ramp up in stripping operations during the first quarter, including the highest quarterly material movement at Bibiani in more than two years. Commissioning of the sulphide treatment plant will advance through July with full operations in August. Production and cost metrics were in line with annual guidance as noted in our recent five year outlook, which envisages growth to over 500,000 ounces per year by 2028 and free cash flow generation of over $2 billion through 2029. We look forward to updating investors on our financing process, which we expect to conclude by the end of July 2025.' Quarter ended April 30, 2025 Summary Financial Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Financial Results Revenue 141,982 114,311 Total comprehensive loss1 (20,038) (16,036) Adjusted EBITDA2 30,664 13,026 Operations Results Gold equivalent produced (oz) 51,912 53,379 Gold sold (oz) 48,190 53,600 Consolidated average gold price realized per ounce2 ($/oz) 2,946 2,133 AISC2 2,971 1,879 Notes:(1) Total comprehensive loss attributable to shareholders of the Company(2) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Asante's revenue for the three months ended April 30, 2025 was $142 million, a 24% increase from $114 million in the same period in 2024. The increase in revenue was primarily driven by higher gold prices and partially offset by a lower volume of gold sold. In the three months ended April 30, 2025, the Company realized an average gold price of $2,946 per ounce on the sale of 48,190 gold equivalent ounces, compared to $2,133 per ounce on the sale of 53,600 ounces in the same period in 2024. Adjusted EBITDA for the three months ended April 30, 2025 was $30,664, compared to $13,026 in the same period in 2024. The increase in Adjusted EBITDA reflects gold prices at all-time high only partially offset by a lower volume of gold sold. The Company produced 51,912 gold equivalent ounces for the three months ended April 30, 2025, compared to 53,379 gold equivalent ounces in the same period in 2024. The decrease in gold production in the three-month period ended April 30, 2025 compared to the prior year comparable period was due to lower feed grades at Bibiani. Consolidated AISC increased by 58% for the three months ended April 30, 2025 compared to the same period in 2024 primarily due to additional costs at Bibiani resulting from increased stripping in the Main Pit and lower grade ore. Additionally, higher sustaining capital expenditures at Chirano as well as lower consolidated volume of gold equivalent sold contributed to this increase. Bibiani Mine – Summary of the quarter ended April 30, 2025 Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Waste mined (kt) 11,412 2,472 Ore mined (kt) 558 587 Total material mined (kt) 11,970 3,058 Strip ratio (waste:ore) 20.5 4.2 Ore processed (kt) 581 596 Grade (grams/tonne) 1.33 1.65 Gold recovery (%) 68% 65% Gold equivalent produced (oz) 17,241 19,183 Gold equivalent sold (oz) 16,708 19,363 Revenue ($ in thousands) 46,674 41,309 Average gold price realized per ounce1 2,794 2,133 AISC1 3,693 1,752 Note:(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Total material mined increased by 291.4% in the three months ended April 30, 2025 compared to the three months ended April 30, 2024. In the three months ended April 30, 2025, ore mined totaled 558,133 tonnes, a 4.8% decrease from 586,536 tonnes in the same period in 2024. The increase in total material mined in the three months ended April 30, 2025 and the decrease in ore mined in the three months ended April 30, 2025 reflects the Company's strategy to reduce the waste strip backlog associated with the expansion of the Main Pit, as well as the continued mining activities at the Russel satellite pit. Gold equivalent ounces produced in the three months ended April 30, 2025 was 17,241 compared to 19,183 in the three months ended April 30, 2024. The decrease in the three months ended April 30, 2025 was due to lower grade plant feed, impacted by draws from low-grade stockpiles whilst operations are focused on reducing the backlog of waste stripping. In addition, results were impacted by a high proportion of sulphide ore processed without the benefit of a sulphide treatment plant, which continues to limit gold recovery. AISC increased to $3,693 per ounce in the three months ended April 30, 2025, compared to $1,752 per ounce in the same period of 2024. The increase was primarily due to elevated stripping requirements, lower grade ore processed, and other higher sustaining capital expenditures. Bibiani Mine – Outlook For the year ending January 31, 2026, the Company plans to execute on its growth strategy which includes: The construction, commissioning, and optimization of the sulphide treatment plant with commissioning expected to begin by the end of Q2 2026, and full operations expected to begin in Q3 2026, significantly enhancing gold recovery. Plant throughput expansions including completion of an upgraded crushing system, which has already started and progressing to plan to achieve a throughput increase from 3.0 Mt/y to 4.0 Mt/y and create a robust crushing circuit. Plant upgrades to the carbon-in-leach ('CIL') plant. Road construction connecting Bibiani to Chirano. Backup generator installation to ensure uninterrupted power to operations and reduced plant downtime. Commencement of underground mining. A definitive feasibility study has been completed, with the underground preparation program that already started targeting start of development in Q4 2026. Full production from the underground mine is planned for 2028, with an anticipated delivery of up to 2.6 Mt/year at an average in situ grade of approximately 3.0 g/t Au above the cutoff grade through 2030. Complete the advanced exploration grade control drilling program at Pamunu, Ayiseru, and Asempaneye to facilitate the development of new satellite pits in 2025, with the goal of improving oxide ore feed and maximizing plant throughput. External financing is being arranged to execute this growth strategy. The Company is currently pursuing various financing initiatives, and although there is no certainty that such financing initiatives will be completed, the Company is confident that it will be able to complete such initiatives in the near term. Subject to the availability of sufficient financing, the Company expects to successfully complete the above initiatives and produce between 155,000 and 175,000 gold ounces at Bibiani in the year ending January 31, 2026, including a significant increase in monthly production in the latter part of the fiscal year following advancement of the planned waste stripping program and completion of the sulphide treatment plant. Chirano Mine –Summary of the quarter ended April 30, 2025 Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Open Pit Mining: Waste mined (kt) 1,742 2,734 Ore mined (kt) 321 612 Total material mined (kt) 2,063 3,347 Strip ratio (waste:ore) 5.4 4.5 Underground Mining: Waste mined (kt) 204 210 Ore mined (kt) 461 460 Total material mined (kt) 665 670 Ore processed (kt) 929 840 Grade (grams/tonne) 1.31 1.47 Gold recovery (%) 86% 86% Gold equivalent produced (oz) 34,671 34,196 Gold equivalent sold (oz) 31,482 34,236 Revenue ($ in thousands) 95,308 73,002 Average gold price realized per ounce1 3,027 2,132 AISC1 2,587 1,951 Note:(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Ore mined from open pit mining decreased by 47.6% in the three months ended April 30, 2025 compared to the same period in 2024. Ore mined decreased in the three months ended April 30, 2025, due to decreased ore mining activity as a result of a focus on stripping activities at the Mamnao central, and Aboduabo open pits. Ore mined from underground mining was relatively constant in the three months ended April 30, 2025, compared to the same period in 2024. Obra, Suraw and Akwaaba were the contributors of underground material in the three months ended April 30, 2025 whilst development started at Akoti Far South to establish another stopping area, improving flexibility. Ore processed increased by 10.6% in the three months ended April 30, 2025 compared to the same period in 2024. The increase was mainly due to greater power availability and realised benefits from plant throughput improvement project initiatives. In the three months ended April 30, 2025, ore grade processed decreased to 1.31 grams per tonne (2024 - 1.47 grams per tonne) due to proportionally more plant feed from low grade stockpiles rehandled in 2025 as opposed to open pit ore in the comparable period. The increased in ore processed, offset by lower ore grades, resulted in marginal increased gold equivalent ounces produced of 34,671 ounces in the three months ended April 30, 2025 compared to 34,196 ounces in the three months ended April 30, 2024. AISC increased to $2,587 per ounce in the three months ended April 30, 2025 compared to $1,951 per ounce in the same period of 2024. This increase was primarily driven by higher sustaining capital expenditures and higher indirect costs associated with production as well as lower volume of gold equivalent sold. Chirano Mine – Outlook For the year ending January 31, 2026, the Company plans to execute on its growth strategy which includes: Execution of process plant projects as planned to improve performance and increase the annual mine production rate to 4Mt/annum. This includes vibrating screen for primary jaw crusher installation, run-of-mine bin refurbishment, apron feeder upgrade, cyclone feed hopper upgrade, carbon regeneration kilns upgrade, mill 2 feed end and half shell replacement, installation of 12-ton acid wash and elution columns, installation of thermic oil heaters, water storage facility construction, TSF1 SE stage 2 raise and TSF3 construction. Underground development of the Akwaaba, Tano and Akoti far south mines to ensure robust underground ore delivery. Development of exploration drifts towards the north to explore and target the reclassification of the resource at Sariehu and Mamnao underground mines and to reaffirm the north mine concept of existing continuity between Obra and Sariehu underground deposits. Start of Aboduabo open pit oxide mining. Ongoing underground exploration projects at the Suraw, Obra and open pit mine life extension projects at the Sariehu/Mamnao area are progressing as planned. The Company expects to produce between 155,000 and 175,000 gold ounces at Chirano for the year ending January 31, 2026. Qualified Person Statement The scientific and technical information contained in this news release has been reviewed and approved by David Anthony, Mining and Mineral Processing, President and CEO of Asante, who is a "qualified person" under NI 43-101. Non-IFRS Measures This news release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ('IFRS'), including 'all-in sustaining costs' (or 'AISC'), 'earnings before interest, taxes, depreciation and amortization' (or 'EBITDA'), and free cash flow. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and should be read in conjunction with Asante's consolidated financial statements. Readers should refer to Asante's Management Discussion and Analysis under the heading "Non-IFRS Measures" for a more detailed discussion of how Asante calculates certain of such measures and a reconciliation of certain measures to IFRS terms. About Asante Gold Corporation Asante is a gold exploration, development and operating company with a high-quality portfolio of projects and mines in Ghana. Asante is currently operating the Bibiani and Chirano Gold Mines and continues with detailed technical studies at its Kubi Gold Project. All mines and exploration projects are located on the prolific Bibiani and Ashanti Gold Belts. Asante has an experienced and skilled team of mine finders, builders and operators, with extensive experience in Ghana. The Company is listed on the Canadian Securities Exchange, the Ghana Stock Exchange and the Frankfurt Stock Exchange. Asante is also exploring its Keyhole, Fahiakoba and Betenase projects for new discoveries, all adjoining or along strike of major gold mines near the centre of Ghana's Golden Triangle. Additional information is available on the Company's website at About the Bibiani Gold Mine Bibiani is an operating open pit gold mine situated in the Western North Region of Ghana, with previous gold production of more than 4.5 million ounces. It is fully permitted with available mining and processing infrastructure on-site consisting of a newly refurbished 3 million tonne per annum process plant and existing mining infrastructure. Asante commenced mining at Bibiani in late February 2022 with the first gold pour announced on July 7, 2022. Commercial production was announced November 10, 2022. For additional information relating to the mineral resource and mineral reserve estimates for the Bibiani Gold Mine, please refer to the 2024 Bibiani Technical Report filed on the Company's SEDAR profile ( on April 30, 2024. About the Chirano Gold Mine Chirano is an operating open pit and underground mine located in the Western Region of Ghana, immediately south of the Company's Bibiani Gold Mine. Chirano was first explored and developed in 1996 and began production in October 2005. The mine comprises the Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao open pits and the Akwaaba and Paboase underground mines. For additional information relating to the mineral resource and mineral reserve estimates for the Chirano Gold Mine, please refer to the 2024 Chirano Technical Report filed on the Company's SEDAR profile ( on April 30, 2024. For further information please contact: Dave Anthony, President and CEOFrederick Attakumah, Executive Vice President and Country Director info@ 604 661 9400 or +233 303 972 147 Cautionary Statement on Forward-Looking Statements Certain statements in this news release constitute forward-looking statements or forward-looking information. All statements, other than statements of historical fact, are forward-looking statements or information. Forward-looking statements or information in this news release relate to, among other things: production, free cash flow and all-in sustaining costs forecasts for the Bibiani and Chirano Gold Mines, estimated mineral resources, reserves, exploration results and potential, development programs, expansion and mine life extension opportunities, completion and timing of plant upgrades, commencement of underground mining, and completion and timing of external financing by the Company. These forward-looking statements and information reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: the impact of inflation and disruptions to the global, regional and local supply chains; tonnage of mineralized material to be mined and processed; future anticipated prices for gold and assumed foreign exchange rates; the timing and impact of planned capital expenditure projects, including anticipated sustaining, project, and exploration expenditures; risks related to increased barriers to trade, including tariffs and duties; ore grades and recoveries; capital, decommissioning and reclamation estimates; our mineral reserve and mineral resource estimates and the assumptions upon which they are based; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions at any of our operations; no unplanned delays or interruptions in scheduled production; all necessary permits, licenses and regulatory approvals for our operations are received in a timely manner; our ability to secure and maintain title and ownership to mineral properties and the surface rights necessary for our operations, including contractual rights from third parties and adjacent property owners; whether the Company is able to maintain a strong financial condition and have sufficient capital, or have access to capital, to sustain our business and operations; and our ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive. Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include, but are not limited to, the duration and effect of local and world-wide inflationary pressures and the potential for economic recessions; fluctuations in the price of gold; fluctuations in currency markets; operational risks and hazards inherent with the business of mining (including environmental accidents and hazards, industrial accidents, equipment breakdown, unusual or unexpected geological or structural formations, cave-ins, flooding and severe weather); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; employee relations; relationships and claims by local communities; changes in laws, regulations and government practices in the jurisdictions where we operate, including environmental, export and import laws and regulations; changes in national and local government, legislation, taxation, controls or regulations and political, legal or economic developments in countries where the Company may carry on business, including legal restrictions relating to mining, risks relating to expropriation; variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's inability to obtain any necessary permits, consents or authorizations required for its planned activities, the Company's inability to raise the necessary capital or to be fully able to implement its business and growth strategies, and those risk factors identified in the Company's management's discussions and analysis and the most recent annual information form. The reader is referred to the Company's public disclosure record which is available on SEDAR ( Although the Company believes that the assumptions and factors used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Except as required by securities laws and the policies of the securities exchanges on which the Company is listed, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. LEI Number: 529900F9PV1G9S5YD446. Neither IIROC nor any stock exchange or other securities regulatory authority accepts responsibility for the adequacy or accuracy of this in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data


Business Upturn
7 hours ago
- Business Upturn
Draganfly Announces Additional Exercise Of Over-Allotment Option
Saskatoon, SK., June 06, 2025 (GLOBE NEWSWIRE) — Draganfly Inc. (NASDAQ: DPRO) (CSE: DPRO) (FSE: 3U8A) ('Draganfly' or the 'Company'), a drone solutions, and systems developer, today announced that further to the closing of the Company's US$3.6 million underwritten public offering on May 5, 2025 (the 'Offering'), Maxim Group LLC, as underwriter and sole book-running manager, has partially exercised their over-allotment option to purchase an additional 100,000 common shares at the price of US$2.09 per share for aggregate gross proceeds of US$209,000 prior to deducting underwriter discounts and commissions. As previously announced, Draganfly intends to use the net proceeds from the Offering for general corporate purposes, including to fund its capabilities to meet demand for its new products including growth initiatives and/or for working capital requirements including the continuing development and marketing of the Company's core products, potential acquisitions and research and development. The Offering was made pursuant to an effective shelf registration statement on Form F-10, as amended, (File No. 333-271498) previously filed with and subsequently declared effective by the U.S. Securities and Exchange Commission ('SEC') on July 5, 2023 and the Company's Canadian short form base shelf prospectus dated June 30, 2023 (the 'Base Shelf Prospectus'). Draganfly offered and sold the securities in the United States only. No securities were offered or sold to Canadian purchasers. A final prospectus supplement and accompanying Base Shelf Prospectus relating to the Offering and describing the terms thereof has been filed with the applicable securities commissions in the Canadian provinces of British Columbia, Saskatchewan and Ontario, and with the SEC in the United States and is available for free by visiting the Company's profiles on the SEDAR+ website maintained by the Canadian Securities Administrators at or the SEC's website at as applicable. Copies of the final prospectus supplements and accompanying Base Shelf Prospectus relating to the Offering may be obtained by contacting Maxim Group LLC, at 300 Park Avenue, 16th Floor, New York, NY 10022, Attention: Syndicate Department, or by telephone at (212) 895-3745 or by email at [email protected] . This press release shall not constitute an offer to sell or the solicitation of an offer to buy these securities, nor shall there be any sale of these securities in any state or other jurisdiction in which such offer, solicitation or sale would be unlawful prior to the registration or qualification under the securities laws of any such state or other jurisdiction. About Draganfly Draganfly Inc. (NASDAQ: DPRO; CSE: DPRO; FSE: 3U8A) is a pioneer in drone solutions, AI-driven software, and robotics. With over 25 years of innovation, Draganfly has been at the forefront of drone technology, providing solutions for public safety, agriculture, industrial inspections, security, mapping, and surveying. The Company is committed to delivering efficient, reliable, and industry-leading technology that helps organizations save time, money, and lives. Media Contact [email protected] Company Contact Email: [email protected] Forward Looking Statements Certain statements contained in this news release may constitute 'forward-looking statements' or 'forward-looking information' within the meaning of applicable securities laws. Such statements, based as they are on the current expectations of management, inherently involve numerous important risks, uncertainties and assumptions, known and unknown. In this news release, such forward-looking statements include, but are not limited to, statements regarding the intended use of proceeds of the Offering. Actual future events may differ from the anticipated events expressed in such forward-looking statements. Draganfly believes that expectations represented by forward-looking statements are reasonable, yet there can be no assurance that such expectations will prove to be correct. The reader should not place undue reliance, if any, on any forward-looking statements included in this news release. These forward-looking statements speak only as of the date made, and Draganfly is under no obligation and disavows any intention to update publicly or revise such statements as a result of any new information, future event, circumstances or otherwise, unless required by applicable securities laws. Investors are cautioned not to unduly rely on these forward-looking statements and are encouraged to read the Offering documents, as well as Draganfly's continuous disclosure documents, including its current annual information form, as well as its audited annual consolidated financial statements which are available on SEDAR+ at and on EDGAR at Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same.

Yahoo
7 hours ago
- Yahoo
Nuclear Vision Announces New Private Placement
NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES Vancouver, British Columbia--(Newsfile Corp. - June 6, 2025) - Nuclear Vision Limited (CSE: NUKV) (the "Company" or "NUKV") is pleased to announce a non-brokered private placement (the "Offering") of up to 7,142,858 units of the Company (each, a "Unit") at a price of $0.28 per Unit for gross proceeds of up to $2,000,000. Each Unit will consist of one common share of the Company (each, a "Share") and one common share purchase warrant (each, a "Warrant"). Each Warrant will entitle the holder to purchase one Share at a price of $0.50 for a period of 24 months from the closing date of the Offering. The proceeds of the Offering will be used to advance the Company's assets in the Republic of Botswana, including but not limited to geophysical surveys, geological mapping, and permeability testing of the sandstone horizon at depth and its susceptibility to advanced Electric Pulse technologies to increase permeability and yield on roll front geological formations in a sandstone environment, and for general working capital purposes. All securities to be issued pursuant to the Offering will be subject to a statutory four-month and one day hold period. Finder's fees may be payable in connection with the Offering, all in accordance with the policies of the Canadian Securities Exchange (the "CSE"). None of the securities sold under the Offering have been and will not be registered under the United States Securities Act of 1933, as amended, and no such securities may be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in the United States or any jurisdiction in which such offer, solicitation or sale would be unlawful. The Company has elected not to proceed with the non-brokered private placement announced on January 23, 2025. About Nuclear Vision Limited Nuclear Vision Limited is an early-stage mineral resource exploration company. The Company's material property is the Regnault Project, consisting of 71 contiguous mineral claims covering an area of approximately 3,678 Ha located north-northeast of Chibougamau in the Province of Québec. The Company also holds the UA92 uranium project, consisting of 7 prospecting licenses totaling approximately 4,828 km2 located in central Botswana. CONTACT INFORMATION Derrick Dao, Chief Executive OfficerEmail: info@ (416) 427-4505 Investor Cubed Simon, CEOEmail: nsimon@ (647) 258-3310 Neither the "CSE" Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement Regarding Forward-Looking Information This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and plans of the Company. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions and includes information regarding; the expectation that the Company will receive all necessary approvals to complete the Offering; the expectation that the Company will complete the Offering on the terms disclosed; and the intended use of proceeds of the Offering. Such forward-looking statements are based on a number of assumptions of management, including, without limitation, that the Company will receive all necessary approvals to complete the Offering; that the Company will complete the Offering on the terms and timing anticipated; and that the proceeds from the Offering will be used as anticipated. Additionally, forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: that the Company will not receive the necessary approvals to complete the Offering; that the Company will not complete the Offering on the terms disclosed, or at all; that the Company will be unable to use the proceeds received from the Offering; that the Company will not yield results from its uranium properties; changes in the Company's business plans, including its planned field programs; that the Company may incur unanticipated costs; that the Company's operations could be adversely affected by possible future government legislation policies and controls or by changes in applicable laws and regulations. Such forward-looking information represents management's best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information. Neither the Company nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this news release. Neither the Company nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this news release by you or any of your representatives or for omissions from the information in this news release. The forward-looking statements herein speak only as of the date they were originally made. The Company has no intention and undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law. To view the source version of this press release, please visit