Woman dies in wall collapse; BBMP announces Rs 5 lakh compensation
BBMP
A 35-year-old woman lost her life after a wall collapsed in the Whitefield-Channasandra area. Following the incident,Chief Commissioner Maheshwar Rao announced a compensation of `5 lakh to the victim's family.The 35-year-old woman, Shashikala, was killed when a rain-soaked compound wall collapsed on her.A private sector employee, Shashikala succumbed to her injuries on the spot.In another rain-related incident, a compound wall collapsed in Ideal Homes Layout, RR Nagar, early Sunday morning, killing five buffaloes and a cow. The fire department received an alert around 7.08 am and responded from the Jnanabharathi station.Chief Minister Siddaramaiah and Deputy CM DK Shivakumar are scheduled to inspect various rain-affected areas on Monday evening, including Manyata Tech Park, Sai Layout, HSR Layout, Ejipura Junction, Silk Board Junction, and the BBMP control room.At a press conference, Rao said Bengaluru recorded the highest rainfall in the last decade.'With such intense rain, minor problems are unavoidable. Our teams have identified 206 sensitive locations and provided relief in many of them,' he said.Rao also highlighted that permanent solutions are being implemented in key areas.In Sai Layout, the drainage system will be expanded, and water inflow sources will be sealed. At Silk Board, where water stagnation is caused by overflow from Madiwala Lake, silt removal from stormwater drains is underway.BBMP teams, in coordination with BWSSB and the fire brigade, are actively working on the ground.Action has also begun to remove encroachments along stormwater drains (rajakaluves).In a separate tragedy at Madhuwan Apartments in Dollar's Colony, BTM Second Stage, two individuals died due to electrocution. Manmohan Kamath (63), a resident of the apartment, was using an external motor to pump water out of the inundated cellar when a short circuit occurred around 6.15 pm. In the same incident, 12-year-old Dinesh, the son of a Nepalese worker employed at the complex, also came in contact with the live current and died.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Indian Express
3 days ago
- New Indian Express
Use cold mix to quick fix potholes: BBMP Chief
BENGALURU: Bruhat Bengaluru Mahanagara Palike (BBMP) Administrator Tushar Girinath has instructed civic agencies to promptly fill potholes in the city with cold mix and eco-fix materials. At a meeting with officials on Tuesday, Girinath emphasised the need for swift action in tackling the menace of potholes, especially during the rainy season. 'In the eight BBMP zones, local contractors must be engaged to procure asphalt and complete the pothole-filling work promptly. Daily reports on the progress of pothole-filling work must be submitted,' he said. Informing that road asphalting projects worth Rs 690 crore are currently under way within BBMP limits, Girinath instructed officials to ensure that the work is completed without any delay. On flooding that proved to be the Achilles' heel of the Palike, he said during the monsoon, waterlogging is expected at 82 key locations. 'Steps must be taken to prevent water accumulation on roads, and ensure smooth flow of rainwater into side drains,' he said.


The Hindu
6 days ago
- The Hindu
A sinking feeling for ‘Brand Bengaluru'
For long-time residents of Bengaluru, it is beginning to feel like there is too much happening all at once. There are talks of extending Namma Metro to neighbouring cities. Work has started for a suburban rail network. The State government is busy pushing for a contentious network of tunnel roads to connect traffic-choked ends. And the civic body, the Bruhat Bengaluru Mahanagara Palike (BBMP), is being split into multiple corporations with the hope that they will manage the city better. Ironically, while these projects are being planned keeping the city's future in mind, there is little thought being given to existing problems, which arose out of Bengaluru's 'growth'. All it takes is for the sky to open up a few times for all that lies beneath the shine of 'Brand Bengaluru' to be exposed. For the motorists caught on dangerously waterlogged roads, the residents of layouts that are inundated after a few spells of rain, and the families of those who lost their lives in a a flooded underpass or a tree fall, the statements of ministers promising removal of encroachments only provide a sense of déjà vu. Spotlight | Bengaluru under water yet again The Chief Minister's Office said in a recent statement that the pre-monsoon rains in 2025 were the highest recorded during the season and in the month of May in the last 125 years. The rainfall recorded in the pre-monsoon period (March 1 to May 31) was 286 mm against the normal 115 mm. The actual rainfall was 219 mm against the normal 74 mm for May. The India Meteorological Department, Bengaluru, said the city received a record 307.9 mm of rainfall between May 1 and May 26 (till 11.30 a.m.). Bengaluru received a staggering 105.5 mm of rainfall in the 24-hour period between 8.30 a.m. on May 18 and 8.30 a.m. on May 19 — the second highest since 2011. This caught the authorities, who were still preparing for the monsoon, off guard. High-impact weather events have been occurring more frequently and with greater intensity globally. Many parts of Bengaluru were under water during the monsoon and post-monsoon seasons in 2015, 2017, 2020, and 2022. In 2023, Karnataka was hit by drought, which led to a water crisis in many parts of the State in 2024. Why, then, have the civic authorities not learned any lessons? Bengaluru was once famed for its network of lakes. These served as flood management tools by harvesting rainwater and storing excess water. As the city grew, the government focused on providing piped water supply from the Cauvery river. It ignored lakes to the point where hundreds of them disappeared, making way for real estate, stadiums, and bus stands. Rivers that originate or flow through the city, such as the Vrushabhavathy, continue to be in a state of neglect. During the 2024 summer water crisis, the Bangalore Water Supply and Sewerage Board came up with a knee-jerk response. It filled up a few lakes with treated water to push up groundwater levels. This year, 63 of the 183 lakes under the BBMP have already reached full capacity before the monsoon season, raising questions about how important flood-mitigation barriers have been compromised. Citizen activists and experts have also repeatedly pointed to the reduced carrying capacity of drains due to the build-up of silt and flow of sewage. This has caused rainwater to overflow into the streets, leading to severe water-logging. The Karnataka Lokayukta, which took up a suo motu case about flooding in Bengaluru after the recent episode, said that the main reasons for flooding were negligence of officials and lack of coordination between various agencies. Justice B.S. Patil also directed officials to speed up de-silting work of drains, ensure a gradient to facilitate flow of water in them, and remove all encroachments on drains. Also Read | Bengaluru rains: Its a long struggle for people in flooded layouts Bengaluru is in the throes of an administrative transformation as the Greater Bengaluru Authority (GBA) will replace the BBMP, which came into being in 2007, as the city's primary governing body. The GBA aims to bring all the major agencies working in Bengaluru under one structure, which will be headed by the Chief Minister of Karnataka. Some civic activists fear this will result in centralisation of administration and power. Will this lead to a more cohesive and comprehensive approach to managing the city, especially in the light of extreme weather events? Or will the residents continue to suffer the same problems as the focus remains on extravagant projects? It is too early to tell.


Hindustan Times
26-05-2025
- Hindustan Times
Resolve issues in flood-prone areas: Maheshwar Rao
Bengaluru, Bruhat Bengaluru Mahanagara Palike chief commissioner Maheshwar Rao on Monday directed officials to resolve issues in flood-prone areas within BBMP limits. Of the 210 flood-prone areas identified across the city, issues at 166 locations have already been resolved, Rao added. Speaking at a meeting held at the BBMP head office, he instructed officials from every zone to actively engage in operations during the monsoon season. He emphasised the need to ensure smooth water flow in stormwater drains during the rainy season. The stormwater drain department must regularly carry out desilting and ensure the cleanliness of the drains. In areas where stormwater drains lack Reinforced Cement Concrete retaining walls, he directed officials to take necessary precautions to prevent waterlogging. Zonal commissioners have been tasked with verifying and confirming the resolution of flood-prone areas. He further instructed them to implement immediate interim measures for the remaining 44 locations and work towards permanent solutions. Noting that the traffic police department has provided a list of locations where stagnant water on roads causes heavy traffic during rains, Rao suggested that appropriate measures be taken to prevent water accumulation at these spots. 'Continuous desilting and cleaning of shoulder drains should also be carried out,' he added. As part of flood mitigation efforts, sluice gates have already been installed in 13 of the 183 lakes within BBMP limits, said the chief commissioner. 'In lakes with sluice gates, water levels should be reduced in advance to accommodate rainwater. Plans must be prepared to gradually install sluice gates in the remaining lakes and to desilt those that have not yet been cleaned,' he said. During heavy rains accompanied by strong winds, teams must remain ready to clear fallen trees and branches immediately, he instructed. Officials have also been directed to identify and remove dry or hazardous trees and branches to prevent accidents. Currently, waste is being transferred from auto tippers to compactors at roadside transfer points. These transfer points must be relocated to more suitable areas, he added. Officials have been asked to identify BBMP-owned or alternative land to shift these operations away from roadsides. Observing that even addressing minor footpath issues can greatly enhance pedestrian mobility, Rao instructed zonal officials to take up the task. Regarding the comprehensive survey of Scheduled Castes, zonal commissioners from all eight BBMP zones have been tasked with overseeing the process. They have been directed to ensure that the survey is completed promptly and effectively. Special Commissioners Muneesh Moudgil, K. Harish Kumar, Suralkar Vikas Kishor, Avinash Menon Rajendran, and Preeti Gehlot also attended the meeting. Zonal Commissioners Satish, Ramya, Digvijay Bodke, Karigowda, Snehal, and Ramesh, along with all Joint Commissioners, the Engineer-in-Chief, all Chief Engineers, and other officials concerned, were present.