Trade unions criticise lenient sentence for businessman involved in Transnet fraud
Image: Independent Newspapers Archives
Trade unions have criticised the five-year effective sentence handed down to businessman Yakub Ahmed Suleman Bhikhu for defrauding Transnet of R66 million, saying the punishment does not reflect the severity of the crime or the damage caused to workers and the economy.
The Federation of Unions of South Africa (FEDUSA) said it 'fully supports and endorses' the position of its affiliate, the United National Transport Union (UNTU), which earlier raised concerns over the sentence.
'Like UNTU, FEDUSA is deeply concerned that the effective five-year sentence, following a conviction in one of South Africa's most egregious State Capture-related scandals, does not reflect the gravity of the crime nor the long-term damage inflicted on workers, the economy, and the integrity of public institutions,' the federation said in a statement.
Bhikhu and his company, Homix (Pty) Ltd, were convicted by the Pretoria Regional Court on 81 counts, including fraud, forgery, uttering, money laundering, and contravening the Tax Administration Act. The offences were committed between 2012 and 2015 and caused a loss of about R66 million to Transnet.
Bhikhu pleaded guilty and was sentenced to 10 years in prison, with five years suspended, effectively serving five years behind bars. He was also ordered to repay R300,000 to Transnet, while Homix received a suspended fine of R500,000.
However, FEDUSA said the sentence 'sends the wrong message' and risks emboldening other looters.
Video Player is loading.
Play Video
Play
Unmute
Current Time
0:00
/
Duration
-:-
Loaded :
0%
Stream Type LIVE
Seek to live, currently behind live
LIVE
Remaining Time
-
0:00
This is a modal window.
Beginning of dialog window. Escape will cancel and close the window.
Text Color White Black Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Transparent Semi-Transparent Opaque
Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps
Reset
restore all settings to the default values Done
Close Modal Dialog
End of dialog window.
Advertisement
Next
Stay
Close ✕
Ad loading
'It undermines confidence in our democratic institutions, particularly the National Prosecuting Authority and the judiciary, whose mandate is to protect the public interest and ensure accountability at all levels of society,' the federation said.
Bhikhu was implicated in evidence led before the State Capture Commission. He evaded arrest for six years before being apprehended at the border while trying to enter Botswana. He has been in custody since.
The NPA's Investigating Directorate Against Corruption (IDAC) said it welcomed the conviction and sentencing, adding that it was the result of collaboration among law enforcement partners.
But FEDUSA insisted that 'until the full weight of the law is brought to bear on those who defraud the state, economic justice will remain elusive'.
THE MERCURY
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The South African
an hour ago
- The South African
Cop accused of hiding key evidence in gang-related murder
A police officer was arrested for defeating the ends of justice after allegedly failing to declare a firearm linked to an alleged gang-related murder. Sergeant Myka Constance Shale, attached to the Crime Intelligence Gathering (CIG) unit, was allegedly handed the firearm by an informer. The weapon was reportedly found at the crime scene. Shale appeared at the Potchefstroom Magistrate's Court and was granted R4,000 bail on Wednesday, 23 July. According to a police report, the firearm was picked up at the murder scene of 38-year-old Wilfred Casper on Saturday, 12 July, in Marikana. However, after Shale received it, she allegedly failed to hand it in or declare it. Casper was found with multiple stab wounds and other injuries and was declared dead on the scene. Five days later, Ikageng Detectives arrested eight suspects, aged between 27 and 35. It is alleged they are all members of the SVK gang. The eight suspects appeared before the Potchefstroom Magistrate's Court on Thursday, 17 July, on charges of murder and were remanded in custody for a bail application. Shale is expected to appear in court again on Monday, 6 October. North West Acting Provincial Commissioner, Major General Patrick Asaneng, commended the Anti-Corruption Investigation Unit (ACIU) for their work in the matter. Let us know by leaving a comment below, or send a WhatsApp to 060 011 021 11. Subscribe to The South African website's newsletters and follow us on WhatsApp, Facebook, X and Bluesky for the latest news

IOL News
4 hours ago
- IOL News
Accused kidnapper Sameemah Jacobs back in the dock
Sameemah Jacobs appears in the Bellville Magitsrate's Court, charged with kidnapping and defeating the administration of justice. Image: Ayanda Ndamane/Independent Newspapers The woman accused of kidnapping 9 day old Mogamat Imaad Sharmar is expected back in the dock on Thursday for the continuation of her bail application. Cross-examination by Sameemah Jacobs's Legal Aid lawyer, Asongewa Mafuya, is expected to take place in the Bellville Magistrate's Court. Jacobs is charged with kidnapping and defeating the administration of justice and may face additional charges as the investigation continues. A week ago, State prosecutor Salaahuddeen Simon completed his portion of presenting the reasons why Jacobs was not a candidate for bail. Sergeant Dawid Fortuin took the witness stand in which he said Jacobs was a flight risk and that the community's plight had to be considered. Fortuin gave a blow-by-blow account of how baby Imaad was kidnapped. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad loading He said Jacobs had befriended Imaad's mother, Imaan Sharmar, also known as Britney Brandt, in February while she visited the clinic. He said that a day prior to the kidnapping, a woman by the name of "Chevon" contacted Sharmar and said she would receive R500 in cash and a baby parcel when they attended a workshop in Bellville on June 28. Imaad was found two days later at Jacobs's home following a tip-off from the Tafelsig residents. Fortuin had the court hanging on his lips when he detailed how Jacobs was attempting to breastfeed Imaad and that baby was crying. He said Jacobs had hospital documentation which had been tampered with. In another twist, he said a witness, who cannot be identified, gave police a statement that she had visited Jacobs at the Bellville Police Station following her arrest, in which she claimed that Sharmar had given her the baby and that she did not kidnap the infant. Get your news on the go, click here to join the Cape Argus News WhatsApp channel. Cape Argus


The Citizen
4 hours ago
- The Citizen
Parliament fire: Over R500m already spent as restoration project now expected to cost R4.4bn
The reconstruction of Parliament is expected to be completed in late 2026. Smoke billows out of the National Assembly building after the fire at Parliament on 2 January 2022 in Cape Town. Picture: Gallo Images More than R500 million has already been spent on repairing Parliament after a fire in 2022, with the total cost of the reconstruction project now projected to reach R4.4 billion. This was revealed during a meeting of the joint standing committee on the financial management of parliament on Friday. MPs received updates on the investigation into the fire that destroyed parliament, which was not insured, as well as progress made in the ongoing restoration efforts. The Development Bank of South Africa (DBSA) provided detailed briefings on the restoration process, while officials from the auditor-general's office dealt with the financial management of the project. Sections of the National Assembly and Old Assembly buildings suffered major damage during the fire on 2 January 2022. The reconstruction is expected to be completed in late 2026 following delays that have extended the original deadline. Zandile Mafe, who admitted to starting the fire and was charged with terrorism and arson, was declared unfit to stand trial in December 2023. Parliament fire: Restoration progress Chuene Ramphele, DBSA group executive for infrastructure delivery, said during the meeting that work was initially stalled as the parliamentary site was treated as a crime scene and secured by police. 'Technically, the work actually started in March 2023,' he told the joint committee. Ramphele said that significant progress had been made since work officially began, including the construction of 155 offices for MPs on Plein Street. 'At this stage, our focus is primarily on the refurbishment,' he said. ALSO READ: Macpherson accused of being 'weak' after saying he's being sidelined over Parliament fire He said that demolition works were completed in March 2024 and came in under budget at R73 million, saving R2 million in the process. Due to design changes and necessary statutory approvals, the initial R2 billion budget had risen. 'When we concluded the detailed designs, you'll see that we started to be very sure of what are the detailed costs,' Ramphele said. 'After the final approval and the designs, the budget for both the refurbishment of the National Assembly and Old Assembly buildings amounted to R3.6 billion.' Watch the meeting below: Ramphele also said the DBSA is applying a risk-monitoring approach to minimise the impact of unforeseen challenges, such as bad weather, given the tight timeline. The revised total budget includes R900 million allocated for upgrading the information and communications technology (ICT) infrastructure. National Assembly construction Ramphele said that Raubex Construction was awarded a R2.27 billion contract to work on the new National Assembly wing. 'The site was handed over in April after having appointed [the company] in December 2024,' he said. He noted that the delay was caused by difficulties in obtaining a construction permit from the department of labour. READ MORE: Parliament quietly reclaims its power 'We could not start if we did not have the construction permit and also making sure that the occupational safety issues are intact to avoid any issues because our biggest risk that we want to mitigate is to ensure there is no fatality on the site or any particular kind of incident.' Ramphele told the committee that guarantees are in place to manage the contractor's performance in case of failure to deliver. 'Other things about the project contract management in place is how we are going to manage the penalties and the penalty regimes that are going to apply in that regard.' Timelines At the moment, work is focused on the basement and structural foundations, including support pillars for two additional floors and a new roof structure. 'At this point in time, the work is happening underground,' he said, adding that 'we want a climate resilient Parliament'. Ramphele said that once the three basement levels are complete, the team will begin construction of the first through sixth floors, including beams and slabs. READ MORE: Parliament allocates R71m for medical aid for former MPs This phase will take approximately 12 months, with the project expected to reach 40% completion by April 2026. Interior finishes – including flooring, toilets, offices, committee rooms, the public gallery and a banquet hall – will require another 18 months, pushing projected progress to 75% by September 2026. Ramphele said the full restoration of the new National Assembly is expected to be completed within 20 months. 'At that point, we will be looking at commissioning the building. In particular we are looking at November 2026. So at that time, the building will be practically complete.' Old Assembly restoration According to Ramphele, a contractor for the Old Assembly building was appointed last month. The R1.3 billion project is expected to take 18 months. Ramphele confirmed that the site has already been handed over to the contractor. He concluded with an update on the overall cost of the parliamentary restoration. 'So far, we have already spent, with what has been happening and what we have done, R574 million. 'Ultimately, the entire programme of Parliament is at a cost of around R4.4 billion with the major items being the National Assembly and Old Assembly.' NOW READ: Reconstruction of Parliament to finally begin – will include gym, sauna and daycare centre