
TVS Apache RTR 310 long term review
Test Started September 2024/5,405kmCurrent ODO reading: 6,143kmMileage this month: 738km
Efficiency this month: 26kmpl
You've got Rs 3 lakh in the bank, you've got an appetite for riding sharp motorcycles that look edgy and in your face. You're preferred style of choice is street naked, and oranges aren't exactly your favourite fruit. What are your options? The BMW G 310 R isn't with us anymore, and the Triumph Speed 400 design can be viewed as bland to most radicals out there. This could be a case of narrowing it down, but my point with this is that the Apache RTR 310 is the only real rival to the KTM 390 Duke, and that is no small feat. I actually prefer the Apache over the KTM simply because it's a brand that I've trusted for a long time, and colour options on the 390 Duke aren't exactly extensive. But, before being carried away further with my personal choices, it's time to bid farewell to the Apache RTR 310. Trellis frame finished in white, along with that 312cc motor, are the Apache's strongest points.
It's a motorcycle that I've come to adore over its tenure. At first, I wasn't too sure about its design language or its credentials on paper. As I began to spend time with this feisty yellow with a busy bee of a motor, it surprised me with its ride quality and extensive feature list. It also impressed me with its ample power on tap and handling. It strikes a balance that Iquite enjoyed, and even my father, who is 65 years old, didn't find it too overbearing. The Apache's tenure was an education, not only the understanding of the motorcycle, but of TVS' commitment to makingengaging motorcycles as a whole. Headlamp design is eye-catching.
Model: TVS Apache RTR 310 Fury Yellow BTOSpecifications:Powertrain: 312.12cc, single cylinder, liquid cooledPower: 35.6bhpTorque: 28.7NmTransmission: 6-speed manual with bi-direction quickshifterClaimed fuel efficiency: 23.23km/lDimensions (LxWxH): 1,991x831x1,154mmWheelbase: 1,358mm
Ex-showroom price: 2.72 lakh
Subscribe to Auto Today Magazine One of the most impressive features on offer has to be the seat with a heating and cooling function, that too, three levels of it!

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
Cracks, broken dividers put drivers at risk on Kisan Path
Lucknow: A TOI reality check on the Outer Ring Road, also known as Kisan Path, uncovered several commuter hazards that go well beyond minor road damage. Deep cracks along multiple stretches, deliberately broken dividers to facilitate two-wheeler crossings and defunct speed check boards meant to curb rash driving were among the major issues observed. Adding to the concern, several vehicles — especially two-wheelers and cars — were found driving on the wrong side of the road at various locations. There was no visible presence of traffic police or National Highways Authority of India (NHAI) personnel to monitor or prevent these violations. Intended to ease the city's traffic burden, the 104-km, Rs 6,214-crore Kisan Path instead became a high-risk corridor due to damaged infrastructure and lack of enforcement. The TOI survey began from the stretch near Kalli Paschim village close to PGI. The entrance was marked by a faded, partially damaged signboard and a pothole—setting the tone for what lay ahead. As the journey continued towards Sultanpur Road, the divider near Sarthuwa Village in the Mohanlalganj area was found damaged—reportedly broken to allow two-wheelers to cross over. Beyond this point, the road was relatively smooth up to Noorpur Behata, where some patchwork was done by the NHAI. However, at Noorpur Behata, a broken roadside barrier was observed, potentially allowing stray animals to wander onto the road. A crater, poorly patched, was already beginning to peel. The absence of street lighting in this stretch further added to the risks, particularly during nighttime travel. The TOI vehicle encountered a few bumpy sections as the journey progressed, but the road was largely manageable. Still, at multiple points—including near Sultanpur Road—wrong-side driving was widespread. Vehicles, including both two-wheelers and four-wheelers, were seen flouting traffic norms with no enforcement in sight. In Bijnor, a deep crater on the road posed a major hazard to fast-moving vehicles. Several other stretches showed signs of recent repair work, with some patches appearing to be filled just a day or two earlier. A particularly alarming sight was observed near Kakori and its surrounding areas, where a cow was seen crossing the high-speed corridor, navigating between vehicles travelling at an average speed of 60–70 km/h. This posed a serious danger to both commuters and the animal. Near Moradabad village along Deva Road, a bridge showed extensive wear, with long cracks clearly visible on its surface. When asked, Lt Col Retd Sharadchand Singh, project director, NHAI, who oversees the Kisan Path project, said, "We are already carrying out repair work wherever required. Our teams continuously survey the entire stretch and address issues as they arise. Additionally, if someone notices a problem, they can report it through NHAI's helpline or mobile app, and it will be resolved promptly."


Time of India
6 hours ago
- Time of India
Insurance firm directed to pay 11L for unfair trade practice in settling claim
Raipur: The Chhattisgarh state consumer disputes redressal commission directed an insurance firm backed by a public-sector bank to pay Rs 11,16,801 to a Raipur-based firm for deficiency in service and unfair trade practice in settling a vehicle insurance claim. The commission also awarded Rs 50,000 for mental agony and Rs 5,000 towards litigation costs. The order, passed by President Justice Gautam Chourdiya and Member Pramod Kumar Varma, set aside an earlier ruling by the District Consumer Disputes Redressal Commission, Raipur, which dismissed the complaint as premature. The commission noted that keeping the claim pending for an extended period, especially after the damaged vehicle was handed over as per the insurer's instructions, amounted to deficiency in service and unfair trade practice. "After accepting the surveyor's assessment, instructing disposal of the damaged vehicle, and its actual disposal, it was improper for the insurer to raise further objections. Keeping the claim pending despite receiving the wreck value amounts to deficiency in service and unfair trade practice. The insurer is liable to pay the remaining Rs 11,16,801, along with compensation for mental agony and litigation costs. The district commission erred in holding the claim premature, making its order unsustainable and liable to be set aside," remarked the consumer commission on the case. The firm's car, insured with the insurance firm, met with an accident on Nov 8, 2019. The insurance company assessed the loss at Rs 11,16,801 and instructed the complainant to hand over the damaged vehicle to a salvage buyer, who paid Rs 13,30,000. The firm alleged that despite these actions and assurances of payment, the remaining amount of Rs 11,16,801 was not disbursed. A complaint was filed before the district commission seeking the balance amount and compensation. The insurance firm, in its defence, said that the claim was pending as the complainant did not provide clarifications and relevant documents regarding the incident. The state commission, however, observed that the insurer already acted upon the surveyor's settlement recommendation and instructed the disposal of the vehicle's wreckage. The commission noted that after proceeding towards settlement and the disposal of the wreckage, it was improper for the insurer to raise further objections. The insurance company has been directed to pay the remaining assessed loss of Rs 11,16,801 with 6% annual simple interest from the date of filing the complaint until realisation, along with the compensation and litigation costs.


New Indian Express
9 hours ago
- New Indian Express
Cholamandalam ordered to pay Rs 7.3 lakh to policyholder for service deficiency
Following the incident, Afnan informed the insurance company and sought compensation. A surveyor was appointed by the insurer, and the vehicle was inspected both physically and via video conference with officials at the police station concerned. Later, the insurer sent a letter to the complainant asking him to submit the accident-related documents. Afnan responded that he could not furnish the documents as the vehicle was still in police custody. He contended that the insurance company had already obtained the relevant documents during the survey and claim form submission. On February 1, 2024, as per court orders, the vehicle was released and taken to a garage in Shivamogga for repairs, which were estimated at Rs 6,01,482. Afnan requested the insurer to treat the claim as a total loss, as the repair cost exceeded 75 percent of the IDV. However, the insurer declined, stating the claim had been closed due to delayed submission of documents. Afnan also stated that the second respondent, IndusInd Bank Ltd, had repossessed the vehicle as he failed to pay EMIs following the accident. He approached the consumer commission, alleging that the insurer had failed to process the claim despite having all necessary documents and had thereby caused a deficiency in service. After reviewing the evidence and arguments from all parties, the Commission observed that the second and third respondents -- IndusInd Bank's Chennai and Shivamogga branches -- had only provided the vehicle loan and bore no responsibility in processing the insurance claim. The Commission ruled that the insurance company had wrongfully denied the claim despite proper documentation and deemed it a service deficiency. The bench comprising commission president T Shivanna and member B D Yogananda Bhandya issued the final order recently. The commission directed that within 45 days from the date of the order, the second and third respondents must hand over the vehicle to the insurer, and the insurer must pay Rs 7,30,550 to the complainant at 9 percent annual interest from May 8, 2024, until the full amount is paid. If delayed, the interest rate will increase to 10 per cent until settlement. The commission further instructed the complainant to cooperate with the insurer in transferring the vehicle records at the relevant authority as and when required.