logo
What you get for £3 million in Northumberland, Powys and France

What you get for £3 million in Northumberland, Powys and France

Times07-05-2025

​Lipwood Hall is a grade II listed country estate near the village of Haydon Bridge, about six miles west of Hexham. Dating back to 1820 and attributed to the architect John Dobson, this near-9,000 sq ft house has seven bedrooms, five bathrooms and four reception rooms, plus an orangery. Set within about 12 acres, the property includes three cottages, a garaging block, a smokehouse and original Victorian stables, all surrounded by landscaped gardens and meadows.​
EPC​ F (potential E) — on a scale of A (best) to G (worst)
Upside Opportunities for guest accommodation or rental income.
Downside​ ​Massively pricey to heat.
Price £3 million
Contact struttandparker.com
A four-bedroom super-modern detached house on the border with Bedfordshire, near Leighton Buzzard. This custom-designed home features

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Climate crisis is more worrying than Putin
Climate crisis is more worrying than Putin

The Guardian

time04-06-2025

  • The Guardian

Climate crisis is more worrying than Putin

If only we were moving towards 'war-fighting readiness' (Report, 1 June) in the defence of our country against climate change, which is 100% likely to occur, unlike a Russian attack. Although I don't disagree with the need to do a bit of sabre‑rattling towards Vladimir Putin, the threats of disastrous floods, storms and droughts are what I worry about much more for my children and StoneSheffield There are plenty of male authors being published ('Men need liberation too': do we need more male novelists?, 31 May). Richard Osman, the Rev Richard Coles, Graham Norton and Bob Mortimer are across all the supermarket bookshelves. All that we authors need to do is become TV celebs, and all our publishing issues are ParkeSelf-published author, Carrshield, Northumberland I recall my old English teacher writing on the blackboard and asking the class to punctuate: 'time flies you cannot they fly at such irregular intervals' (Letters, 3 June). We were all Wagstaff Ammanford, Neath Port Talbot Elon Musk is a 'special government employee' (Report, 30 May), Russia's war on Ukraine is a 'special military operation'. These days, 'special' never seems to signify anything de BrunnerBurn Bridge, North Yorkshire The best colon advice I have ever received is 'eat sufficient fibre' (Letters, 28 May).Chris OsborneWest Bridgford, Nottinghamshire Have an opinion on anything you've read in the Guardian today? Please email us your letter and it will be considered for publication in our letters section.

Decision deferred on Ripon petrol station site flats plan
Decision deferred on Ripon petrol station site flats plan

BBC News

time04-06-2025

  • BBC News

Decision deferred on Ripon petrol station site flats plan

A decision on whether to allow flats to be built on the site of a former petrol station in Ripon has been deferred by Fuel Oils had sought permission from North Yorkshire Council to build a four-storey six-apartment block on the site of Skellbank Garage, in a meeting on Monday, councillors heard the application was "strongly" supported by Ripon City Council, while Ripon Civic Society had welcomed changes to the original officials recommended the plans be turned down as the height of the new building would be "harmful" to the setting of a nearby listed building, and councillors decided to discuss the application again at a future date. A report seen by councillors stated that the design of the proposed development, which included three two-bed flats and three one-bed flats, "fails to reflect local characteristics of the Ripon Conservation Area at ground floor level".It would prove "harmful to the character of that conservation area and, through its form, the setting of the adjacent listed building", it the report also raised concerns that no ground stability report had been carried out, despite the site being in "an area with shallow gypsum that could cause subsidence".Documents supporting the application stated that the site, which had been vacant for over 20 years, was currently boarded off and in poor condition, according to the Local Democracy Reporting underground tanks from the former petrol station had been removed, the documents heard that Harrogate Borough Council, which was abolished in 2023, approved a plan in 2003 to demolish the former petrol station and build eight that work never took place and the permission had since lapsed, and a similar plan for the site which was submitted in 2016 was withdrawn three years later. Listen to highlights from North Yorkshire on BBC Sounds, catch up with the latest episode of Look North.

River Breamish rerouting in Northumberland to be reversed
River Breamish rerouting in Northumberland to be reversed

BBC News

time04-06-2025

  • BBC News

River Breamish rerouting in Northumberland to be reversed

Work has begun to restore a river's traditional course after centuries of re-routing straightened it to create historic meandering of a 1km (0.6 mile) section of the River Breamish on the Harehope Estate, south of Wooler in Northumberland, will be are excavating and diverting the river into its historic channels, installing silt traps, shallow ponds, wetlands, embankment breaches and constructing new woody Breamish restoration is expected to be completed by late Summer, the Life Wader project said. It is part of a wider River Till Restoration Strategy, named after the river the Breamish flows from its floodplain has led to a decline in freshwater species, reduced biodiversity and an increased risk of flooding, Life Wader work, which has been in development since 2019 and received planning approval in 2024, got under way late last week. Phil Kearney, project manager at Tweed Forum which is involved in the restoration, said: "We should be hopefully complete within about eight to 10 weeks."Jim Heslop, from the Environment Agency in north-east England, said the scheme will give "a boost for wildlife".It is part of a five-year, £5.8m nature recovery project co-funded by the European Union and due for completion in December 2026. Additional reporting by James Robinson, Local Democracy Reporting Service Follow BBC North East on X, Facebook, Nextdoor and Instagram.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store