
Govt approves 4-laning of Marakkanam-Puducherry NH at cost of Rs 2,157 cr
The decision was taken at a meeting of Cabinet Committee on Economic Affairs chaired by Prime Minister
Narendra Modi
.
Productivity Tool
Zero to Hero in Microsoft Excel: Complete Excel guide
By Metla Sudha Sekhar
View Program
Finance
Introduction to Technical Analysis & Candlestick Theory
By Dinesh Nagpal
View Program
Finance
Financial Literacy i e Lets Crack the Billionaire Code
By CA Rahul Gupta
View Program
Digital Marketing
Digital Marketing Masterclass by Neil Patel
By Neil Patel
View Program
Finance
Technical Analysis Demystified- A Complete Guide to Trading
By Kunal Patel
View Program
Productivity Tool
Excel Essentials to Expert: Your Complete Guide
By Study at home
View Program
Artificial Intelligence
AI For Business Professionals Batch 2
By Ansh Mehra
View Program
Currently, connectivity between Chennai, Puducherry Viluppuram and Nagapattinam is dependent on existing 2-lane National Highway 332A and associated state highways. This causes significant congestion due to high traffic volumes, especially in densely populated stretches and key towns along the corridor.
To address these challenges, the project will upgrade approximately 46 km of NH-332A from Marakkanam to Puducherry to a 4-lane configuration, an official statement said.
This will decongest the existing corridor, improve safety, and cater to the mobility needs of rapidly growing towns such as Chennai, Puducherry Viluppuram and Nagapattinam, it added.
Live Events
The project alignment integrates with 2 major National Highways (NH-32, NH-332) and two state highways (SH-136, SH-203), providing seamless connectivity to key economic, social, and
logistics
nodes across Tamil Nadu.
Additionally, the statement said the upgraded corridor will enhance multi-modal integration by connecting with two railway stations (Puducherry, Chinnababusamudram), two airports (Chennai, Puducherry), and one minor port (Cuddalore), thereby facilitating faster movement of goods and passengers across the region
Upon completion, the Marakkanam-Puducherry section will play a pivotal role in regional economic growth, strengthening connectivity between major religious and economic centres, boosting tourism to Puducherry, and opening new avenues for trade and industrial development.
The project will also generate approximately 8 lakh person-days of direct and 10 lakh person-days of indirect employment, and will open new avenues of growth, development and prosperity in surrounding regions, the statement added.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
8 minutes ago
- Time of India
Maharashtra government to probe 26 lakh 'suspect' beneficiaries of Ladki Bahin Yojana
The Maharashtra government has initiated a large-scale verification drive targeting over 26 lakh beneficiaries of the Mukhyamantri Ladki Bahin Yojana due to suspicions of ineligibility and misuse. District administrations are physically verifying applications, with anganwadi workers conducting door-to-door checks to identify ineligible claimants based on age and household criteria. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads The Maharashtra government has ordered a large-scale verification drive targeting over 26 lakh beneficiaries of the Mukhyamantri Ladki Bahin Yojana amid suspicions of widespread ineligibility and misuse, state Women and Child Development department officials said on administrations have been directed to physically verify applications and eligibility of the listed women based on set criteria, while anganwadi workers have been tasked with conducting door-to-door checks to weed out ineligible claimants, they scheme allows only two women per household between the ages of 21 and 65 to receive benefits, but officials said cases have emerged where more than two women from the same family, or those outside the age bracket, have availed themselves of the monthly payment of Rs 1, to the department's officials, the current scrutiny focuses on two primary conditions, namely age and number of beneficiaries per household."Women found outside the eligible age group will be disqualified, and in households with more than two beneficiaries, only two will remain eligible. Additional checks are being conducted for bogus documents, false transfer certificates, and ownership of four-wheelers," an official by the then Mahayuti government last year, the Ladki Bahin Yojana is credited with helping the ruling alliance, comprising the BJP, Shiv Sena and NCP, retain power comprehensively in the November 2024 assembly reports revealed that around 14,000 men had received payments, amounting to more than Rs 21 crore, under the scheme for up to 10 months. In a separate probe, more than 2,000 government employees were found to have taken undue advantage of the scheme."The ongoing verification will also cover Jalna district, where 70,000 beneficiaries are under scrutiny. The WCD department has prepared a list of suspected ineligible claimants, and field checks have already begun in several districts," the official department indicated the verification is also being driven by the mounting financial burden of the scheme on the state exchequer as applications were approved initially without stringent checks in the run-up to the Assembly elections.


Indian Express
8 minutes ago
- Indian Express
Sukhoi-30-launched Brahmos was the primary offensive weapon in Op Sindoor: DRDO chief
Stating that Brahmos missile launched from Sukhoi-30 MKI was the primary offensive weapon used during Operation Sindoor, chairman of the Defence Research and Development Organisation (DRDO) Samir V Kamat said on Saturday that the development of a smaller version of the supersonic cruise missile, Brahmos-NG, will soon begin. He said this variant can be fitted on other aircraft because of its reduced size. Kamat was speaking to the media on the sidelines of the 14th convocation ceremony of Defence Institute of Advanced Technology (DIAT), Pune on Saturday. Speaking about Operation Sindoor during a press briefing, Kamat said, 'When it comes to offensive weapons, Brahmos was the primary weapon that we used, mainly the air-launched variant which was launched from Sukhoi-30 MKI platform. When it comes to defence weapons systems, Akash missile, the D4 anti-drone system and the MRSAM were used. All the sensors were networked using the AI-based Akashteer (indigenous automated air defence control and reporting system) which helped in identifying the threats coming towards us and deploying the right kind of weapon to neutralise them.' When asked about the development of a smaller version of the supersonic cruise missile Brahmos, Kamat said, 'Right now it is in the planning stages. We are looking at Brahmos NG which is a smaller version of Brahmos which can then be fitted on all our other aircraft. Today, Brahmos can be fitted only on the Sukhoi-30 MKI platform. But if we can make it smaller, it can be fitted on all our platforms. We are planning to start its development soon.' Brahmos is an extremely versatile stand-off range 'fire-and-forget' type supersonic cruise missile that has proved its capabilities in land-based, ship-based, air launched and submarine-based versions. The Brahmos Air Launched Cruise Missile (ALCM) is the heaviest missile to arm India's frontline fighter jet Sukhoi-30 MKI. Speaking about the indigenous light tank Zorawar, Kamat said, 'It is at a more advanced stage. We have finished the development trials and we will offer it for user trials starting September.' Answering a question on defence exports, 'Last year, we had defence exports worth nearly Rs 23,000 crore. Based on the interest we are getting now because of the success of our systems in Operation Sindoor, I expect these exports to double in the next two to three years. We should achieve Rs 50,000 crore of exports by 2028-29 which is also the target set to us by the Defence Minister. There is a lot of interest in the Pinaka rocket system, ATAGS (Advanced Towed Artillery Gun System), Brahmos and Akash. I am sure that in the years to come, the exports of these systems will increase.' When asked about the countries that have shown interest, Kamat said: 'I will not go into specifics. But South East Asia, Middle East and Africa are the regions.' Speaking about the development of Kaveri engine by the DRDO, 'When the development of the Kaveri engine was started, it was to be used in the LCA (Light Combat Aircraft.) The thrust required for LCA is about 84 kilonewtons. While the development was successful, the thrust that we could achieve based on our design was about 72 kilonewtons. So, Kaveri could not be fitted on LCA. But we are now modifying Kaveri. After removing its afterburner, we are terming it as Kaveri Derivative which is expected to provide a thrust of 49 kilonewton. It will be used in unmanned combat aerial vehicle programmes. Currently, the high altitude testing of this derivative engine is on and it will be tested on the flying testbed. And then it will be certified.' Sushant Kulkarni is a Special Correspondent with The Indian Express in Pune with 12+ years of experience covering issues related to Crime, Defence, Internal Security and Courts. He has been associated with the Indian Express since July 2010. Sushant has extensively reported on law and order issues of Pune and surrounding area, Cyber crime, narcotics trade and terrorism. His coverage in the Defence beat includes operational aspects of the three services, the defence research and development and issues related to key defence establishments. He has covered several sensitive cases in the courts at Pune. Sushant is an avid photographer, plays harmonica and loves cooking. ... Read More


Economic Times
8 minutes ago
- Economic Times
Maharashtra government to probe 26 lakh 'suspect' beneficiaries of Ladki Bahin Yojana
Synopsis The Maharashtra government has initiated a large-scale verification drive targeting over 26 lakh beneficiaries of the Mukhyamantri Ladki Bahin Yojana due to suspicions of ineligibility and misuse. District administrations are physically verifying applications, with anganwadi workers conducting door-to-door checks to identify ineligible claimants based on age and household criteria. iStock The Maharashtra government has ordered a large-scale verification drive targeting over 26 lakh beneficiaries of the Mukhyamantri Ladki Bahin Yojana amid suspicions of widespread ineligibility and misuse, state Women and Child Development department officials said on administrations have been directed to physically verify applications and eligibility of the listed women based on set criteria, while anganwadi workers have been tasked with conducting door-to-door checks to weed out ineligible claimants, they scheme allows only two women per household between the ages of 21 and 65 to receive benefits, but officials said cases have emerged where more than two women from the same family, or those outside the age bracket, have availed themselves of the monthly payment of Rs 1, to the department's officials, the current scrutiny focuses on two primary conditions, namely age and number of beneficiaries per household."Women found outside the eligible age group will be disqualified, and in households with more than two beneficiaries, only two will remain eligible. Additional checks are being conducted for bogus documents, false transfer certificates, and ownership of four-wheelers," an official said. Launched by the then Mahayuti government last year, the Ladki Bahin Yojana is credited with helping the ruling alliance, comprising the BJP, Shiv Sena and NCP, retain power comprehensively in the November 2024 assembly reports revealed that around 14,000 men had received payments, amounting to more than Rs 21 crore, under the scheme for up to 10 months. In a separate probe, more than 2,000 government employees were found to have taken undue advantage of the scheme."The ongoing verification will also cover Jalna district, where 70,000 beneficiaries are under scrutiny. The WCD department has prepared a list of suspected ineligible claimants, and field checks have already begun in several districts," the official said. The department indicated the verification is also being driven by the mounting financial burden of the scheme on the state exchequer as applications were approved initially without stringent checks in the run-up to the Assembly elections.