
Cork City Council seeks tenders for €15m road project that will 'act as the catalyst' for south docks
The Docklands to City Centre Road Network Improvement Scheme, with an indicative cost of €15m, will include significant works to Terence MacSwiney Quay, Albert Quay, Victoria Road, Monrea Terrace, and the Hibernian Buildings.
The area is the main gateway to SuperValu Páirc Uí Chaoimh, the Marina Market, Marina Park, and Marina promenade, as planners hope to redevelop the docklands to build homes and create thousands of jobs.
'Funding has been secured by Cork City Council from the Local Infrastructure and Housing Activation Fund (LIHAF) to implement measures aimed at unlocking sustainable transport access between the South Docks and the city centre, which will facilitate the beginning of the Docklands area realising its stated potential,' it said.
'The road improvement works will form part of [our] long-term infrastructure proposals for both the North and South Docks, which will interconnect all zones within the Docklands area as development parcels are being advanced.'
In April, city councillors approved the multi-million euro upgrade after key changes were agreed.
It paved the way for the construction of new public transport, walking, and biking links, new landscaping, and quayside parklets, and major improvements to the streetscape leading into the south docks area.
However, officials also agreed to drop the proposed residential access link, or through road, connecting Marina Terrace to Rosefield Terrace and Kingston Avenue. This was on foot of local concerns about a proposed new through road through a narrow cul de sac and potential impacts on a local grotto.
Nonetheless, Cork City Council has said it will provide a 'high-quality public realm' that will position the Cork docklands as a 'vibrant, innovative, mixed use, sustainable, socially inclusive new urban quarter'.
Business groups welcomed the original plans, with Cork Chamber saying that it shared the council's vision of 'creating sustainable transport corridors and people-centric environments'.
'Such projects will contribute to Cork's development as a sustainable city with vibrant communities and a strong quality of life,' its CEO Conor Healy said. 'In doing so, Cork will be well positioned to attract and retain investment and talent.'
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Irish Examiner
a day ago
- Irish Examiner
Medieval Cork unearthed for city's Culture Night
REMINDERS of Cork City's medieval past unearthed from the site of a €25m student block on the city's most dereliction-blighted thoroughfare, the North Main St, are to go on display as part of an 'art meets artefacts' month-long exhibition, with talks and creative displays. The Beneath our Feet interpretation of finds from a winter 2021/22 dig, going down 3m to reveal 12 medieval buildings and artefacts at Nos 92 to 95 North Main St, opens for Culture Night, September 19, at the street's St Peter's Church — itself built on medieval remains. Lost and found It combines visual art, oral history and talks, and includes an installation by the award-winning writer and artist Sarah Baume, amongst others. Student accommodation scheme Coleman Court at 92 - 96 North Main Street is on the site of a significant dig and dive into Cork's medieval past. Picture Larry Cummins Beneath our Feet comes exactly 30 years after a major exhibition of finds from the excavation by O'Callaghan Properties (OCP) of the North Main St shopping centre site/Kyrl's Quay in 1995, which revealed 13th-century city gateways, walls, tower, slipway, and unearthed 10,000 artefacts. Ironically, the North Main St shopping centre currently lies largely mothballed in recent years since anchor Dunnes withdrew, pending redevelopment by purchasers BMOR, with just its multi-storey carpark in daily use. The same London-based BMOR successfully redeveloped the site across the street for the 279-student bedspace €25m Coleman Court development, which also yielded valuable finds to be outlined in the forthcoming Beneath our Feet collaboration with writers, artists, and archaeologists. Delivered by Vision Contracting post-dig, BMOR's purpose-built Coleman Court in a four-to-seven-storey block got its planning in 2020, with later design tweaks. Cork City Council got a 10-year affordable (half rent) beds deal for 16 units until 2033. Firemen battling the fire at Munster Furniture Store, North Main Street in November 2008. Pic Diane Cusack/Provision. The site previously accommodated the Munster Furniture Centre, destroyed by an inferno in November 2008, and which lay idle for 15 years. Also long idle, derelict, and dangerous are Nos 62-65 North Main St, now in Cork City Council ownership under the derelict sites legislation, having been placed on the Derelict Sites Register in 2015. A City Hall spokesperson said it was hoped to have construction work on the four-buildings underway in 2026. Protesters gathered outside long-derelict buildings at 62-65 North Main Street in Cork. A query as to whether an archaeological dig will be required at this contentious eyesore site has been addressed to City Hall. Meanwhile, Cork City Council archaeologist Ciara Brett said: 'We know that archaeology interests the Cork public but, due to the rescue nature of the projects we engage in, they are rarely able to interact with the material and outcomes directly. 'By engaging with artists, some of whom have archaeological experience, we hope to interpret these narratives, of excavation, discovery, of imagining the past, of experiencing the materials from the past, telling both our own stories and the stories of Cork's past as understood from the evidence we have uncovered.' Ms Brett, along with artist and archaeologist John Sunderland, got Creative Ireland funding and Arts Council funding for the Beneath our Feet project's interpretation via visual arts and oral history with listening excerpts as part of the month-long exhibition at St Peter's Church close to the excavation site. 'It is, therefore, a fitting venue, as similar archaeology will literally be beneath the feet of anyone visiting the exhibition'. Lane Purcell Archaeology conducted the dig at Nos 92-96 North Main St to a depth of 3m below street level, and 12 identifiable buildings from the medieval period — including stake-built, post and wattle, and sill-beam timber houses — were recorded and preserved in the waterlogged lower levels alongside organic materials such as wood and leather, as well as plant and insect remains, some of them now extinct. Foundation piling/construction is a modern version of old post and beam buildings which would have been on this site in the 1300s 'The site is a valuable window on the lives of medieval Cork people, offering evidence of everyday life and activities, as well as indicators of the wider environmental conditions from the 12th to the 14th centuries and beyond,' say the Beneath our Feet team which includes Sara Baume, artist and writer; John Sunderland, mixed media visual artist and archaeologist; Matt Durran, glass and ceramics sculptor; Penny Johnston, archaeobotanist, research scientist, and oral historian; and Eva Kourela, entomologist, researcher, and illustrator.


Irish Examiner
a day ago
- Irish Examiner
Cork City Council seeks tenders for €15m road project that will 'act as the catalyst' for south docks
Cork City Council has gone out to tender on a major new road project it says will 'act as the catalyst' for development in the south docklands area. The Docklands to City Centre Road Network Improvement Scheme, with an indicative cost of €15m, will include significant works to Terence MacSwiney Quay, Albert Quay, Victoria Road, Monrea Terrace, and the Hibernian Buildings. The area is the main gateway to SuperValu Páirc Uí Chaoimh, the Marina Market, Marina Park, and Marina promenade, as planners hope to redevelop the docklands to build homes and create thousands of jobs. 'Funding has been secured by Cork City Council from the Local Infrastructure and Housing Activation Fund (LIHAF) to implement measures aimed at unlocking sustainable transport access between the South Docks and the city centre, which will facilitate the beginning of the Docklands area realising its stated potential,' it said. 'The road improvement works will form part of [our] long-term infrastructure proposals for both the North and South Docks, which will interconnect all zones within the Docklands area as development parcels are being advanced.' In April, city councillors approved the multi-million euro upgrade after key changes were agreed. It paved the way for the construction of new public transport, walking, and biking links, new landscaping, and quayside parklets, and major improvements to the streetscape leading into the south docks area. However, officials also agreed to drop the proposed residential access link, or through road, connecting Marina Terrace to Rosefield Terrace and Kingston Avenue. This was on foot of local concerns about a proposed new through road through a narrow cul de sac and potential impacts on a local grotto. Nonetheless, Cork City Council has said it will provide a 'high-quality public realm' that will position the Cork docklands as a 'vibrant, innovative, mixed use, sustainable, socially inclusive new urban quarter'. Business groups welcomed the original plans, with Cork Chamber saying that it shared the council's vision of 'creating sustainable transport corridors and people-centric environments'. 'Such projects will contribute to Cork's development as a sustainable city with vibrant communities and a strong quality of life,' its CEO Conor Healy said. 'In doing so, Cork will be well positioned to attract and retain investment and talent.'


Irish Examiner
3 days ago
- Irish Examiner
Planning decision due on major Wilton housing development with 348 affordable homes
A planning decision is due this week on a major new housing development on State-owned land in Cork that would see almost 350 affordable, social and cost-rental homes built. In one of its first major forays in the county, the Land Development Agency has sought permission for 348 homes on former ESB lands in Wilton. First identified for affordable housing in the Government's Housing for All strategy in 2021, the plans submitted to Cork City Council would provide for 296 cost rental apartments, 16 two-storey affordable townhouses and 36 social housing apartments. Alongside this, a childcare facility would be built with communal open spaces. 'Wilton faces a severe undersupply of rental properties, despite being a key employment hub with a high concentration of young professionals, smaller households, and a reliance on private rental accommodation,' it said in its planning statement. 'The unit mix is market-driven, policy-compliant, and financially sustainable, addressing Wilton's acute housing needs while supporting sustainable urban development.' It said this need is underscored by recent reports suggesting the average rent listed in Cork city has risen to €2,000 per month, which is being driven by a severe shortage of properties available. Construction target When first launching the scheme, the Land Development Agency said that construction could start in early 2026 with the first homes being delivered in late 2028, pending planning approval. However, it has sought planning permission for seven years across the 2.61-hectare site. 'We submit to the Local Authority that a 7-year planning permission is necessary to accommodate the scale and complexity of the large residential development,' it said. 'This is to ensure sufficient time for construction, infrastructure installation, and compliance with regulatory requirements while addressing potential unforeseen delays which may occur subsequent to obtaining planning permission.' According to filings on Cork City Council's planning website, no formal objections were received to the plans although three observations were lodged with the local authority. Cork City Council is due to issue its decision on the planning bid this Wednesday. Other major Land Development Agency projects in Cork include sites at Anglesea Terrace and the former St Kevin's Hospital. In the case of the latter, it has said that 267 homes there are under construction. Last year, its chief executive John Coleman said that 'Cork is very much a priority' for the State agency. 'We think Dublin is largely built out. There may be infill sites available, but the opportunity in Cork, particularly in the docklands, is massive, and one that we anticipate playing a big role in,' he said.