
Liverpool: £37m allocated to build new SEN school in West Derby
Almost £40m is to be allocated to fund the construction of a brand new primary school in Liverpool to support children with special educational needs (SEN). Pupils at the existing Princes School are spread across four sites which have been described as unsuitable and in "poor condition", including the main one in Toxteth.Liverpool City Council's cabinet is to be asked to back the £37m investment into the purpose-built facility for 250 pupils on long-derelict land off Princess Drive in West Derby.More than 30 classrooms would be created on one level with hygiene rooms and hoist access, along with two hydrotherapy pools and rebound and multisensory rooms.
The city council said the current main locations for SEN pupils were "not suited to the complex needs of the pupils or the growing demand of the service needs to provide sufficient places within the city for pupils with an Education Health and Care Plan (EHCP)".
Satellite sites
In Liverpool, pupils with an EHCP has risen by 50% in the four years since 2020, the Local Democracy Reporting Service said.The case for a new school was made several years ago and needs to be delivered "as quickly as possible", according to the city's own analysis.Currently along with the main Princes School site on Selborne Street and Picton site, there are an additional two cohorts being managed on satellite sites on Dingle Lane and Overbury Street. The Toxteth and Picton sites are described as "nearing the end of their functional life" but remain safe to use for the time being. The proposed new site on Colwell Road was formerly a primary school but has remained vacant since its demolition in 2006.The funding is expected to be agreed when the cabinet meet on Tuesday.
Listen to the best of BBC Radio Merseyside on Sounds and follow BBC Merseyside on Facebook, X, and Instagram. You can also send story ideas via Whatsapp to 0808 100 2230.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BBC News
a day ago
- BBC News
New Alconbury Weald school approved after cost-cutting changes
A new secondary school will be built after cost-cutting changes were made to its school will be built at the Alconbury Weald Education Campus, near Huntingdon, Cambridgeshire, with space for 600 of being built in the originally proposed "H" shape, the main teaching block will be a "T" school is being built to serve the new development in Alconbury which will turn a former airfield into about 6,500 new homes. In planning documents, Cambridgeshire County Council and developer Morgan Sindall said the changes "introduced improvements to the design of the scheme".The plans, which have been approved by the council's planning committee, said it was a "more efficient use of area and improves pupil and staff circulation between the school facilities".It could also allow for an expansion to create an enclosed external courtyard space. If expanded, the school could double its pupil capacity to 1,200, said the Local Democracy Reporting Service. Last year, the council proposed not installing a sprinkler system in the new school as construction costs had "significantly" exceeded the £37m project was thought a sprinkler system could cost between £850,000 and £900,000, although it was later suggested this figure may have been "on the high side".The report said a risk assessment found it was acceptable not to include sprinklers, with other fire protection features the time, some councillors disputed the proposals not top have final plans for the school include a sprinkler tank – a tank that typically provides the water for a sprinkler system. Follow Cambridgeshire news on BBC Sounds, Facebook, Instagram and X.


BBC News
2 days ago
- BBC News
Sunderland Museum and Winter Gardens plans include galleries and new entrance
A museum's entrance could be moved and new galleries created if plans are proposals for Sunderland's Museum and Winter Gardens have been officially submitted, after they were revealed earlier this Grade II listed building will have more space when the city's library moves to the Culture House development on Keel Square in the autumn.A decision on the redevelopment plans is expected later this year. The museum was last refurbished more than 20 years ago, according to Local Democracy Reporting the entrance is moved, the existing shop will become a learning hub called Growing Space, where visitors will be able to learn about the exhibition space will be created next to the new entrance lobby, along with a relocated reception desk and museum the city's pottery and glass collections will be moved into a new gallery on the third floor called The new galleries include Window on Wearside, which will feature "vibrant displays of star objects" to enjoy Sunderland's story of sports and music. The soon-to-be-vacated library space will become Sunderland Story, exploring the city's history through "mass displays" of early archaeology, ship models and mining for the proposed first and second floors are described as "more limited" but include the creation of a new meeting space, according to planning documents submitted to the council. Follow BBC Sunderland on X, Facebook, Nextdoor and Instagram.

Leader Live
3 days ago
- Leader Live
Flintshire Catholic 'super-school' consultation now open
After a number of delays and growing opposition from parents at two of the schools affected, the period for people to have their say on the plans has been formally opened. The public have until July 18 to submit their views on the proposals, which involve closing St Anthony''s Catholic Primary School in Saltney, St David's in Mold, St Mary's in Flint plus Flint's St Richard Gwyn Catholic High School. They would be replaced by a £55 million catholic 'super-school' on the site of St Richard Gwyn and St Mary's for pupils aged 3-18. Under the plans St Anthony's would be closed from August 31, 2026 while the other three schools will continue to operate as a single 3-18 school across three sites until the new school building project is completed. The intention is to apply to the Welsh Government's Sustainable Communities Fund to cover 85% of the cost of the new school with the Diocese of Wrexham contributing 15% through the transfer of land at St Anthony's and St David's. Since the proposals were announced in February parents at St David's and St Anthony's have been vocal in their opposition to the plans - raising concerns over safeguarding, safe travel to school and the impact on pupils' quality of life and education. All four schools are facing building maintenance costs, with St Richard Gwyn requiring £430,000 of investment, St Mary's in need of just over £253,000, St David's requiring over £90,000 and St Anthony's in need of £16,300 of work. In the consultation documents the reasons for the proposals are that those costs, coupled with the fact that each affected primary school is currently under-occupied and the falling birth rate, mean keeping the existing schools open is not financially viable. Members of the public can have their say by visiting Flintshire County Council's website and clicking on the Consultation and Engagement page link. Read more: Bishop greeted by silent protest against catholic super-school plans in Buckley Parents action group challenges Flintshire catholic super-school data 'Senseless' - Flintshire parents slam catholic super-school report Taxpayer-funded Flint catholic super-school will be owned by church if approved Opposing the move, St David's School Action Group and the parents of pupils at St Anthony's have pointed to their schools' good Estyn ratings, quality of education and SEN provision. They have raised concerns over the increased distances children will need to travel - St Anthony's is more than six miles from its nearest catholic primary school Venerable Edward Morgan Catholic Primary in Shotton and around 14 miles from the proposed 'super-school'. St David's is almost six miles from both Venerable Edward Morgan and new 'super-school' site. They have also cited the excellent SEN provision that both schools currently provide and have questioned whether in a larger school children would receive the same attention and care they need to thrive. Flintshire County Council will compile all feedback from the consultation and review it through September and October, with a view to publishing a statutory notice in October or November. There will then follow a one-month objection period where further feedback on the proposals will be sought with the final decision expected between January and March 2026.