logo
Indian Army's Close-Quarter Battle Carbine Procurement Saga Poised to End with KSSL and Adani Deals

Indian Army's Close-Quarter Battle Carbine Procurement Saga Poised to End with KSSL and Adani Deals

The Wire3 days ago
Rahul Bedi
The process has underscored a key reality – for the MoD and the Indian Army, quick reaction weapons arrive at a glacial pace, if at all.
Representative image of an Indian Army soldier with a weapon. Photo: PTI.
New Delhi: It has been one of the longest procurement sagas in the Indian Army's history – nearly a quarter-century of tenders floated. scrapped, 'fast-track' acquisition contracts announced and abandoned, and intermediate or 'stopgap' fixes standing in for real solutions.
And, finally last month it appeared that the Indian Army's close-quarter battle (CQB) carbine requirement of 425,318 units, pending since the late 1990s is likely to be met, to replace its legacy 9mm 1A1/2A1 sub-machine guns (SMGs) – local versions of the L2A3 Sterling machine gun – developed in England in the mid-1940s, and entering British Army service in 1953.
For decades, these two SMG variants were licence-built for decades by the erstwhile Small Arms Factory at Kanpur, part of the erstwhile state-run Ordnance Factory Board, but their manufacture had ceased altogether on grounds of obsolescence by the early 2000s.
Thereafter, the Indian Army had largely been operating without a CQB carbine, which operationally was critical to providing troops, much like its description suggests, with a compact, lightweight weapon for rapid, accurate fire in confined or urban environments, mountainous terrain and jungle environments.
Since then, every attempt to replace the carbine has marched through the Ministry of Defence's (MoD's) familiar parade – tenders announced, trials held, everything voided, before sinking into the familiar swamp of bureaucratic futility with no weapon system.
But industry sources now say that this cycle of ineptness had seemingly ended with the recent shortlisting of Kalyani Strategic Systems Limited and Adani Aerospace & Defence to supply 425,213 5.56×45 mm carbines to the Army in a potential Rs 2,800-crore deal that is expected to be imminently signed.
According to the putative arrangement, KSSL, which had emerged as L1, or the lowest bidder, following trials, would supply the Army 60% or 255,190 CQB carbines of the overall tender from either its small arms unit at Jejuri or at Khed, near Pune.
Additionally, Adani Defence, which was L2 or the second lowest bidder, is likely to be awarded the deal to provide the remaining 170,023 carbines from its facility at Gwalior, which it had acquired in 2020 from Punj Lloyd Raksha. Industry sources said that, in all likelihood, Adani Defence would match KSSL's L1 bid for the carbines in keeping with MoD standing operating procedures in selling them to the Army.
The CQB carbine delivery timelines are expected to stretch over the next few years, with initial batches likely to be employed by Indian Army counter-insurgency units in Kashmir and the Northeast, where the absence of such a compact weapon small arms system has been most acutely felt. For soldiers used to presently lugging full-length assault rifles into tight alleyways or boarding helicopters with unwieldy weapons, the arrival of lightweight, rapid-firing CQB carbines will be more than an operational boost; it will finally usher in a vast operational change in counter-insurgency (COIN) operations.
Meanwhile, KSSL will series produce the Joint Venture Protective Carbine (JVPC) engineered by the Defence Research and Development Organisation's (DRDO) Armament Research & Development Establishment (ARDE) in Pune, as part of a public-private partnership (PPP), under the MoD's atmanirbharta or self-reliance rubric. This carbine will also incorporate over 60% of content sourced indigenously.
Weighing around three kg, the gas-operated JVPC features an ergonomic, ambidextrous design with a retractable stock and Picatinny rails for optics and accessories. Capable of firing over 700 rounds per minute to an effective range of 200-300m, it reportedly exhibits low recoil and is believed to demonstrate high reliability across extreme temperatures and in varied environments and incorporates a 120mm bayonet for hand-to-hand combat. Its service life is engineered for a service life of 15 years or 15,000 rounds, whichever comes first.
Adani Defence, on the other hand, will produce the Israel Weapon Industries (IWI) Galil ACE CQB carbines-locally named 'Jeet', meaning 'victory'. It features a 368 mm long barrel, a weight of 3.2 kg, and a rate of fire between 650-750 rounds per minute to a 300-500 m range.
Jeet incorporates a rotating bolt with a short-stroke gas piston, a full-length Picatinny rail for optics, a folding/telescopic stock, ambidextrous controls for quick handling, and compatibility with standard NATO magazines. The ACE CQB has also been deployed for extended periods by the Israel Defence Forces in its numerous COIN operations and other conflicts against Palestinians and many of its neighbours where firefights often occur in confined spaces.
The two carbines were shortlisted after technical evaluations and field trials involving other domestic vendors, partnering with overseas small arms makers. These included Jindal Defence and Aerospace – associating with Brazil's Taurus Armas, BSS Material in New Delhi, linking up with Indo-Russian Rifles Private Limited and Bharat Electronics, which had tied up with Italy's Beretta.
Over the years, the CQB carbine procurement process has been compelling and concerning, exposing both the Army's and MoD's procurement systems at their most ineffective, bogged down by delays, indecision, and missed opportunities.
After acknowledging the operational shortcomings of the aging 9mm Sterling submachine gun in the late 1990s – particularly its limited range, stopping power, and accuracy – the Indian Army adopted a stopgap solution.
It employed a shortened variant of the locally developed 5.56x45mm Indian Small Arms System (INSAS) assault rifle as part of its customary jugaad, or innovative fix, which only ended up highlighting its significant limitations and rendering it relatively ineffective for such specialised roles.
Senior infantry officers said the INSAS rifle was not optimised for CQB scenarios, as its relatively longer barrel and overall dimensions made manoeuvring in confined spaces cumbersome. The absence of features like a folding stock or compact design further hindered its suitability for rapid movement and handling in close and restrained urban situations. Soldiers found it challenging to quickly reposition and engage enemy targets, simply due to the rifle's size and weight. But despite these obvious limitations, these shortened INSAS alternates remained in widespread use for years and continue even today.
However, in 2002-3, the first global tender was floated for 44,618 5.56x45mm CQB carbines, with under-barrel grenade launcher compatibility. Several trials took place, involving major overseas small arms makers like the US's Colt, Italy's Beretta and IWI.
But in 2007-2008, after extended trials at the Infantry School at Mhow, in Madhya Pradesh, in the Rajasthan desert, Punjab's plains and high altitude regions in Sikkim and Himachal, the contract was terminated due to the Indian Army's 'overreach' in determining the carbines specifications or Qualitative Requirements (QRs) about their add-ons, like thermal-designated laser sights.
A follow-on RfP was issued in December 2010 for an equal number of weapons.
Then again, in 2013, after a protracted three-year trial process, the carbine procurement was once again thwarted, not by performance issues, but over a minor safety feature. One of the shortlisted carbines included a small, screw-like safety component designed to render the sights "eye safe" during low-intensity engagements, thereby preventing potential retina damage.
Yet, this feature was not specified in the original tender's technical requirements, and a three-member, senior Army committee failed in resolving the 'discrepancy', leading again to the contract's cancellation, despite escalating insurgent activities in Kashmir and increasing Army casualties in COIN encounters. Industry sources noted that this time round, the tender was scrapped solely because the "safety screw" had not been included in the original specifications, irrespective of the protection it offered.
Subsequently, in March 2018 the MoD issued yet one more RfP – its third in a decade, for 93,895 CQB carbines this time, in which the United Arab Emirates Caracal International's CAR 816 carbine was shortlisted, seven months later for procurement via the MoD's Fast Track Procedure (FTP), having bested its rival F60 model fielded by Thales of Australia in trials.
Under the FTP route, through which the CAR 816s were to be procured, the $110 million tender was to have been completed within the mandated 12-14 months or by August 2019. But 13 months later, in September 2020, the MoD opted to arbitrarily ditch the deal for undeclared reasons.
'Processing the carbine purchase via the FTP indicated the operational urgency of the buy, but that too was bafflingly blocked,' said a senior army officer associated with the deal. The entire endeavour was simply incomprehensible and mystifying, he added, declining to be named, as he was not authorised to speak to the media.
Conversely, in the ensuing years, the ARDE developed the JVPC in collaboration with KSSL, and Adani Defence partnered successfully with IWI to produce the 'Jeet', ostensibly clinching the CQB carbine buy as things presently stand. But it also underscored the reality that for the MoD and the Indian Army, quick reaction weapons arrive at a glacial pace, if at all.
The Wire is now on WhatsApp. Follow our channel for sharp analysis and opinions on the latest developments.
Advertisement
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

UER-II Inauguration: Developers See Big Boost For Dwarka Expressway, NCR Realty
UER-II Inauguration: Developers See Big Boost For Dwarka Expressway, NCR Realty

News18

time20 minutes ago

  • News18

UER-II Inauguration: Developers See Big Boost For Dwarka Expressway, NCR Realty

Developers believe UER-2 will be a gamechanger for Delhi-NCR's real estate sector as enhanced connectivity is expected to spur demand for both residential and commercial projects. Prime Minister Narendra Modi will on Sunday inaugurate the 76-km Urban Extension Road-2 (UER-2) and the 29-km Delhi stretch of the Dwarka Expressway, in what is being billed as a major infrastructure boost for the National Capital Region (NCR). Built at a cost of about Rs 8,000 crore, the four-to-six-lane UER-2 connects Alipur to Mahipalpur via Mundka, Bakkarwala, Najafgarh, and Dwarka. The new corridor is expected to significantly cut travel time between Indira Gandhi International Airport and several NCR cities. देशभर में हम कनेक्टिविटी के विस्तार के साथ आवागमन की सुविधाएं बढ़ाने में निरंतर जुटे हुए हैं। इसी दिशा में कल दोपहर करीब 12:30 बजे दो प्रमुख राष्ट्रीय राजमार्ग परियोजनाओं के उद्घाटन का सौभाग्य मिलेगा। इससे दिल्ली-एनसीआर का ट्रैफिक और सुगम होगा। — Narendra Modi (@narendramodi) August 16, 2025 With seamless links to the Delhi-Chandigarh, Delhi-Rohtak, and Delhi-Mumbai expressways, UER-2 is likely to ease congestion, reduce fuel costs, and enhance connectivity to Sonipat, Panipat, Karnal, Ambala, Rohtak, Jind, and Bahadurgarh. Boost for Real Estate Developers believe UER-2 will be a gamechanger for Delhi-NCR's real estate sector, as enhanced connectivity is expected to spur demand for both residential and commercial projects across multiple corridors. Dwarka and Najafgarh are emerging as attractive residential destinations, offering families value housing with better access to Gurugram's business hubs. Commercial real estate is also set to benefit. UER-2's links to major highways are expected to drive demand for warehouses, logistics hubs, and retail spaces in Bahadurgarh and Rohtak, where land rates could rise 20-30% over the next 18 months. Gurugram and Greater Noida may see growing interest in luxury housing and office complexes as reduced travel times attract corporate tenants and high-net-worth buyers. Historical trends along the Yamuna Expressway show similar infrastructure projects boosting plot values by up to 50%. Developers Welcome the Move Navdeep Sardana, founder of Whiteland Corporation, said, 'We welcome the inauguration of UER-II and the Dwarka Expressway by PM Modi, a landmark moment in Delhi-NCR's growth journey. UER-II will seamlessly connect key destinations such as Sonipat and Panipat while easing travel across the region, setting the stage for stronger economic lifelines and future-ready development." Robin Mangla, president of M3M India, called the project a breakthrough in regional mobility. 'The inauguration of the UER-II corridor is a watershed in regional mobility — cutting travel time from Gurugram and Delhi to Sonipat, Panipat and beyond, while enabling seamless access from the Delhi border to IGI Airport. By bypassing traditional chokepoints, this connectivity will redefine how people and businesses engage with emerging locations," he said. Abhay Kumar Mishra, president & CEO of Jindal Realty, said Sonipat is poised for a real estate boom post-UER-2. 'Enhanced connectivity will slash commute times from Sonipat to IGI Airport by over half and link seamlessly to Dwarka Expressway. Property prices here remain 30-50% lower than Gurugram or Noida, yet Kundli land values have surged 190% since 2020, while Sector 35 saw 252% appreciation in three years. Developments like Maruti Suzuki's Kharkhoda plant will further spur demand for affordable housing and logistics hubs," he said. Gaurav K Singh, founder of Womeki Group, said, 'The launch of the Dwarka Expressway and UER-2 is set to transform NCR real estate. Enhanced connectivity across Delhi, Gurugram, and Dwarka will make the entire corridor far more attractive for both homebuyers and investors. Strong infrastructure drives convenience, security, and long-term value growth." Harinder Dhillon, national sales head at BPTP, said, 'The inauguration of UER-2 by PM Modi marks a transformative moment for Delhi-NCR's real estate landscape. This enhanced connectivity will ripple across the region, linking key highways such as Delhi-Chandigarh and Delhi-Jaipur. The anticipated surge in property values presents a significant opportunity for buyers." Improved airport connectivity, reduced congestion, and stronger investment appetite are expected to drive both property demand and values across the region. tags : real estate view comments Location : New Delhi, India, India First Published: August 17, 2025, 10:11 IST News business » real-estate UER-II Inauguration: Developers See Big Boost For Dwarka Expressway, NCR Realty Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Navi Mumbai man duped of Rs 1.47 crore in property fraud
Navi Mumbai man duped of Rs 1.47 crore in property fraud

News18

time21 minutes ago

  • News18

Navi Mumbai man duped of Rs 1.47 crore in property fraud

Thane, Aug 17 (PTI) Police have registered a case against a real estate company director and two others for allegedly cheating a man of Rs 1.47 crore after promising him six flats with the amount in Navi Mumbai a decade ago, officials said on Sunday. The accused lured the 57-year-old transport firm owner from CBD Belapur in Navi Mumbai with the promises of multiple flats and collected the sum between June 2011 and January 2016, they said. The victim was assured that a formal Agreement for Sale would be executed and possession of flats would be handed over. However, no flats were provided and the money was not returned, an official from CBD Belapur plice station said. Based on the victim's complaint, the police on Friday registered a case against the real estate company director and two of his associates under the legal provisions for cheating, the official said. The police have appealed to the people to remain cautious and verify documents thoroughly before committing to property purchases. PTI COR GK view comments First Published: August 17, 2025, 10:15 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Noida to Delhi IGI airport in just 20 minutes! PM Modi to inaugurate these expressways; it costs..., will connect...
Noida to Delhi IGI airport in just 20 minutes! PM Modi to inaugurate these expressways; it costs..., will connect...

India.com

time42 minutes ago

  • India.com

Noida to Delhi IGI airport in just 20 minutes! PM Modi to inaugurate these expressways; it costs..., will connect...

The government is set to provide a big gift to residents of Noida. Prime Minister Narendra Modi will inaugurate the Urban Extension Road-II (UER-II) on Sunday. Once operational, the journey from Noida to Indira Gandhi International Airport will take only 20 minutes. The residents of Noida faced serious problems getting to the airport and sometimes faced hours of travel home from Delhi after landing. This new road is likely to eliminate all of that hassle. As reported by India Today, this route will offer great convenience to travellers to and from West Delhi and the NCR, and relieve the congested Ring Road in the city. Once these projects are complete, they would relieve congestion on the internal roads, relieving the pressure on NH-48, NH-44, the Ring Road, and finally the Barapulla Elevated Corridor. The estimated construction cost of UER-II is Rs 3,300 crore. Prime Minister Narendra Modi will inaugurate two major National Highway projects worth a combined cost of nearly Rs 11,000 crore on 17th August, 2025, at around 12:30 PM in Rohini, Delhi. The projects, the Delhi section of the Dwarka Expressway and the Urban Extension Road-II (UER-II), have been developed under the Government's comprehensive plan to decongest the capital, with the objective of greatly improving connectivity, cutting travel time, and reducing traffic in Delhi and its surrounding initiatives reflect Prime Minister Modi's vision of creating world-class infrastructure that enhances ease of living and ensures seamless mobility. As per the statement, the 10.1 km long Delhi section of Dwarka Expressway has been developed at a cost of around Rs. 5,360 crore. The section will also provide Multi-modal connectivity to Yashobhoomi, DMRC Blue line and Orange line, the upcoming Bijwasan railway station and the Dwarka cluster Bus Depot. 'This section comprises: Package I covers a 5.9 km stretch from the Shiv Murti intersection to the Road Under Bridge (RUB) at Dwarka Sector-21, while Package II spans 4.2 km from the Dwarka Sector-21 RUB to the Delhi-Haryana border, offering direct connectivity to Urban Extension Road-II,' the statement from PMO added. The 19 km-long Haryana section of the Dwarka Expressway was earlier inaugurated by the Prime Minister in March Minister will also inaugurate the Alipur to Dichaon Kalan stretch of Urban Extension Road-II (UER-II) along with new links to Bahadurgarh and Sonipat, built at a cost of around Rs. 5,580 Crores. It will ease traffic on Delhi's Inner and Outer Ring Roads and busy points like Mukarba Chowk, Dhaula Kuan, and new spurs will provide direct access to Bahadurgarh and Sonipat, enhance industrial connectivity, reduce city traffic, and expedite goods movement in the NCR.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store