
4 lanes, 9 flyovers & 6 underpasses: New ₹325cr highway to link south Haryana & Rajasthan
Tired of too many ads? go ad free now
The new highway, part of National Highway 248-A, will have nine flyovers, six underpasses and bypasses at Malab and Bhadas of Nuh. The govt has set a two-year completion target for the ambitious project. On completion, the highway is expected to reduce travel time to Rajasthan and tackle safety lapses on a stretch notoriously known as the "bloody highway," where over 2,500 fatalities have been reported in the past 12 years.
This development is a result of persistent advocacy and public pressure over the years. The Mewat RTI Manch, a local activist group, has been at the forefront of this campaign since 2013, conducting hunger strikes and protests. Also, the group has filed a petition signed by over 20,000 residents to draw attention to the perils of existing narrow roads and demand immediate corrective measures.
Initially, a ₹186-crore proposal was approved in 2019, but the project was put on hold following construction plan for Delhi-Mumbai Expressway through the area.
Now, with a renewed focus and an increased budget, the Centre has moved forward with a revised estimate of ₹325 crore.
Union minister Rao Inderjit Singh, who has been a vocal advocate for the project, emphasised its transformative potential for Mewat. "The project is not just about a road; it's about giving the people of this region better connectivity, safety and opportunities they've long been denied," he said.
Locals and activists have expressed their approval of the project.
Tired of too many ads? go ad free now
"This is the result of our decade-long struggle. A safer and better-connected Mewat is finally taking shape," said Rajuddin, a prominent member of the RTI manch movement.
Release of the tender has sparked celebrations across Nuh and nearby areas. At Badkali Chowk — the epicentre of several protests — residents gathered on Friday to express their gratitude.
Mohammad Habib, an INLD functionary at Ferozepur Jhirka, said, "This road has taken too many innocent lives.
The BJP govt has finally taken a step that will prove to be a milestone for every Mewati."
Local activists recalled that the movement to expand NH-248A began with a five-day protest on July 9, 2017, under the banner of the Mewat RTI Manch. This was followed by a major state-wide campaign in Nov 2018, which drew national attention. The same year, the Khuni Highway Sangharsh Samiti was formed to intensify the movement.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

The Hindu
17 minutes ago
- The Hindu
Supreme Court agrees to hear pleas on the status of Rohingyas as ‘refugees', their deportation
The Supreme Court decided on Thursday (July 31, 2025) to hear in detail the question of whether the Rohingyas can be treated as 'refugees', or if they are illegal immigrants. A three-judge Bench headed by Justice Surya Kant said it would devote three days to hear the case extensively, saying once this question was answered authoritatively, the consequences would flow automatically. The primary questions recorded by the Court, as raised by petitioners who are Rohingya people living in camps in the national capital, represented by advocate Prashant Bhushan and senior advocate Colin Gonsalves, include protections available to the Rohingyas in India if they were entitled to be declared as refugees. Or, on the other hand, if they were not refugees but illegal immigrants, whether the action of the government in deporting them was justified. Mr. Bhushan said the petitions, some of which dated back to 2013, had also highlighted the prolonged detention suffered by persons, including Rohingyas, after being declared as foreigners in States such as Assam. The Bench agreed to hear arguments on whether persons, including illegal entrants to India, could be detained indefinitely. The Court said it would also hear submissions on the living conditions and availability of basic amenities in Rohingya camps. 'The first issue is whether they are refugees or illegal immigrants. Rest is consequential,' Justice Kant remarked. In an earlier hearing in May, the apex court had observed that if the Rohingyas were found to be 'foreigners' under the Foreigners Act, they would be dealt with by the Centre in accordance with law. The petitioners have challenged the Centre's power to deport Rohingyas. They argued that the Rohingyas had been identified as 'refugees' by the United Nations High Commission for Refugees (UNHCR). They had constitutional protection against deportation to Myanmar. The petitioners claimed non-refoulement, saying the Rohingyas would be tortured and killed if they were deported to Myanmar, which had anyway declared them 'stateless'. Solicitor General Tushar Mehta, for the Centre, had submitted that India was not a signatory to the UN Convention on Refugees. He had referred to an interim order passed by the Supreme Court that the government's power under Section 3 of the Foreigners Act to issue orders to 'prohibit, regulate, restrict entry or departure of foreigners' was absolute and unlimited, especially when national security concerns were in play. Mr. Mehta said Article 51(c), which emphasises respect for international law, could be pressed by the petitioners as long as they were in consonance with the domestic law.


India Today
17 minutes ago
- India Today
After Indus treaty pause, India floats tender to tap Chenab's full potential
Months after India put the Indus Waters Treaty (IWT) on hold, it is now moving to revive a long-stalled hydropower project on the Chenab — first envisioned six decades ago but held back by the very treaty with Pakistan. India has floated an international tender, which shows a definitive shift in its strategy on the Indus Water premier Centre-owned agency for hydropower development, the National Hydroelectric Power Corporation (NHPC), on July 29 invited international tenders for the 1,856-MW Sawalkote Hydroelectric Power Project on the Chenab River in Jammu and the suspension of the IWT in April after the terror attack in Pahalgam, India is now moving to harness a western river, previously allocated to Pakistan under the treaty, to maximise its hydropower potential. It is asserting its rightful share and prioritising water development of the Sawalkote Hydroelectric Power Project follows its approval by the Environment Ministry panel in July and its designation as a "project of national importance", which enabled the NHPC to float a Rs 200-crore tender on July 29, cutting red tape and fast-tracking clearances for adherence to the IWT restricted India to non-consumptive use of the western rivers, the Indus, Jhelum, and treaty limited India's ability to build storage-based or large-scale irrigation projects on these three rivers. As a result, hydropower projects on the western rivers were mandated to be run-of-the-river, meaning they couldn't store large volumes of the IWT mandated that India provide a six-month notice to Pakistan before commencing any project. However, with the treaty now kept in abeyance, this requirement is no longer in effect, and data sharing will also like Sawalkote, Kishanganga, and Baglihar, all located on western rivers or their tributaries, have often faced objections from Pakistan, even though they store only limited water and are primarily designed for electricity the decision to fast-track the Sawalkote project, coupled with India holding the IWT in abeyance, and reports of India restricting water flows from existing dams, is being seen as a significant change in India's water strategy with respect to Pakistan, which relies heavily on the Indus basin for agriculture and hydropower. Map showing the proposed location of the Sawalkote Hydroelectric Project on the Chenab River in Jammu and Kashmir, between Ramban and Udhampur districts (Source: NHPC DPR) SAWALKOTE TO OVERTAKE BAGLIHAR AS J&K'S BIGGEST HYDROPOWER PROJECTThe Sawalkote Hydroelectric Power Project, near Sidhu village in Ramban district, is poised to become Jammu and Kashmir's largest hydropower initiative, surpassing the 900 MW Baglihar in the 1960s by the Central Water Commission, the project remained dormant due to IWT restrictions and geopolitical National Hydroelectric Power Corporation (NHPC) recently issued an e-tender for its construction, with bids due by September 10, project would feature a 192.5-metre roller-compacted concrete gravity dam, designed as a run-of-the-river scheme to harness the Chenab's high-velocity flow in the Western Himalayas. With over 10,000 square kilometres of its catchment area above the snowline, the Chenab offers immense hydropower potential, estimated at over 150,000 MW across the project's revival aligns with India's push for energy self-reliance and strategic control over water from the western rivers' resources after the suspension of the IWT, which several experts had termed "one-sided". The Sawalkote Hydroelectric Power Project on the Chenab River, a run-of-the-river project, is estimated to cost Rs 22,704 crore in two phases. (Image: NHPC) INDIA REDEFINED RED LINES, PUTS NATIONAL INTEREST FIRSTSigned in 1960 under World Bank mediation, the IWT allocated the eastern rivers (Ravi, Beas, Sutlej) to India and the western rivers (Indus, Jhelum, Chenab) to Pakistan, with India permitting limited non-consumptive uses like hydropower on the western Chenab, flowing from Himachal Pradesh through Jammu and Kashmir into Pakistan's Punjab, is critical for Pakistan, with the Indus Valley collectively irrigating 80% of its suspension of the IWT in April, citing Pakistan's support for cross-border terrorism, freed India from treaty obligations like data-sharing and prior notification of projects. India has since restricted water flows from the Baglihar and Salal dams on the Chenab, with reservoir flushing operations in May reducing downstream flows by up to 90% at Pakistan's Marala headworks, according to Pakistan's Indus River System Chenab's reduced flow threatened Kharif crop sowing between April and June, particularly paddy and cotton, critical for Pakistan's food security and textile industry, respectively. Fluctuating water levels, observed in May, with flows dropping to 3,100 cusecs at Marala, rang alarms in Islamabad, with Pakistan's Prime Minister Shehbaz Sharif calling the IWT suspension an "act of war".Later, Pakistan urged India to restore the treaty, and proposed dialogue to renegotiate India is instead focussing on its own priorities, driven by strategic interests and long-term plans to expand storage at existing dams and build new ones. India is now focussed on water and energy security with all seriousness, and the international tender for the Chenab hydropower project reflects that.- EndsMust Watch advertisement
&w=3840&q=100)

Business Standard
17 minutes ago
- Business Standard
Cabinet raises PMKSY outlay to ₹6,520 cr to boost food processing
The Union Cabinet on Thursday increased the budgetary outlay for the flagship scheme Pradhan Mantri Kisan Sampada Yojana (PMKSY) by Rs 1,920 crore to Rs 6,520 crore to boost the food processing sector. The enhanced funds, to be provided this fiscal, will be utilised for 50 multi-product food irradiation units and 100 food testing labs. The decision in this regard was taken in the meeting of the Union Cabinet chaired by Prime Minister Narendra Modi. "The outlay of PMKSY has been increased to Rs 6,520 crore," I&B Minister Ashwini Vaishnaw told reporters after cabinet decisions. PMKSY, launched in 2017, was extended for one more year till the end of the current 2025-26 fiscal with an allocation of Rs 4,600 crore. On Thursday, the Cabinet decided to enhance the allocation by Rs 1,920 crore to implement the 2024-25 budget announcement to set up 50 multi-product food irradiation units and 100 food testing labs. Out of which, about Rs 1000 crore will be used for setting up 50 multi-product food irradiation units under the component scheme ICCVAI (Integrated Cold Chain and Value Addition Infrastructure) and 100 labs under the component scheme FSQAI (Food Safety and Quality Assurance Infrastructure) of the PMKSY. About Rs 920 crore will be used for sanctioning projects under various component schemes of PMKSY during the 15th Finance Commission Cycle (2021-22 to 2025-26). Both ICCVAI and FSQAI are demand-driven component schemes of PMKSY. In a separate statement, the government said the Expression of Interests (EOIs) would be floated for inviting proposals from eligible entities across the country. The proposals received against the EOI would be approved after proper scrutiny as per the eligibility criteria under the extant scheme guidelines. The implementation of the proposed 50 multi-product food irradiation units is expected to create a total preservation capacity, ranging from 20 to 30 lakh tonne per annum, based on the type of food products irradiated under these units. The setting up of the proposed 100 NABL-accredited food testing laboratories under the private sector will lead to the development of advanced infrastructure for testing food samples, thereby ensuring compliance with food safety standards and the supply of safe food. "Irradiation helps in minimising post-harvest losses, preventing sprouting, ripening, microbial contamination and extending the shelf life," the minister said. Having more food testing labs reduces time for sample analysis, improves compliance with domestic and international standards and boosts exports, he added. The export of processed food products has doubled to USD 11 billion from USD 5 billion. Share of processed food in agri-exports has increased to 24 per cent from 14 per cent, he noted.