
MahaRERA pulls up real estate developer for allotting parking in a different wing, cites deficiency in service
₹ 3.5 crore, which included the cost of one 'puzzle car parking space' (mechanical) each. (Picture for representational purposes only)(Unsplash)
The case
Three homebuyers who purchased units in the D and E wings of Veena Serenity, a project by Mumbai-based Veena Developers in Tilak Nagar, were allegedly allocated parking spaces in the C wing. However, after the formation of the housing society, wings A, B, and C were grouped into one society, while D and E formed a separate one. As a result, residents of the C wing society informed the D wing buyers that they could no longer use the parking within their premises.
The buyers had purchased their apartments between 2018 and 2020 for a combined value of over ₹3.5 crore, which included the cost of one 'puzzle car parking space' (mechanical) each.
The homebuyers alleged that although the 'puzzle car parking spaces' were allotted to each homebuyer via separate allotment letters and confirmed through stickers issued by the developer, none of the homebuyers were provided with a dedicated, numbered parking slot, as required.
The homebuyers said two separate cooperative housing societies were formed, one comprising wings A, B and C, and another comprising wings D and E. The developer's staff orally informed the homebuyers that their allotted puzzle car parking spaces were located in Wing C, belonging to the other society.
Upon contacting the office bearers of the A, B, and C societies, the homebuyers were informed that residents of wings D and E are prohibited from parking in wings A, B and C, leaving them without access to the parking spaces they had paid for as part of their flat purchases, homebuyers said.
Also Read: Dubai vs Mumbai: What ₹5 crore can fetch you in real estate, returns, maintenance costs and more
The homebuyers alleged that they repeatedly corresponded with the developer from 2021 onwards, urging resolution of the parking issue. However, despite the existence of a sanctioned layout plan detailing designated parking numbers, the respondent failed to allocate a dedicated puzzle parking space or provide clarity regarding its location.
MahaRERA's circular on parking
The homebuyers told MahaRERA that, as per the authority's 2021 circular, all parking spaces must be clearly marked, numbered, and linked to specific apartments. They alleged that the developer violated these guidelines by failing to mention exact parking numbers in the allotment letters or agreements for sale.
The homebuyers alleged that the sanctioned layout plan and details available on the MahaRERA website confirm adequate parking provisions across all five wings. However, the developer's failure to meet regulatory obligations has caused them continued mental distress and inconvenience.
Also Read: Over 29,000 complaints filed by homebuyers against 5,500 real estate projects in Maharashtra: MahaRERA data
MahaRERA's order
The developer failed to appear at all three MahaRERA hearings, prompting the authority to pass the order in their absence.
MahaRERA's order said, "The Authority finds that the respondent's failure to allot specific, dedicated parking spaces constitutes a deficiency in service and a breach of obligations under RERA."
In its order dated July 10, 2025, MahaRERA directed the developer to allot and hand over a specific, numbered 'puzzle car parking space' located within wings D and E of the said project to each homebuyer within 60 days from the date of the order.
Also Read: MahaRERA update: Maharashtra regulator surpasses 50,000 project registrations in 8 years
An email query sent to Veena Developers did not receive a response. If a response is received, the story will be updated.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
19 minutes ago
- Hindustan Times
Mahindra, Toyota, JSW among 25 firms to revamp govt's industrial training institutes
MUMBAI: In a major boost for the upgradation of Industrial Training Institutes (ITIs) in the state, the skill education department has received expressions of interest from around 25 companies and non-profit organisations under its Public-Private Partnership (PPP) model. Big industry names like Mahindra & Mahindra, Toyota, Chitale Bandhu, JSW and the Baramati Industrial Development Association are among those willing to adopt ITIs to improve their training standards. Mahindra, Toyota, JSW among 25 firms to revamp govt's industrial training institutes Employment and skill development minister Mangal Prabhat Lodha said that ITIs had been bereft of the necessary upgrades for years. 'Through PPP and skill-based courses, we want to make these institutes more job-oriented and bring back their former reputation,' he said. Lodha revealed that JSW was interested in working on solar technology with several ITIs and Chitale Bandhu had evinced an interest in taking over a Sangli-based ITI. The state government approved the PPP policy for ITIs early this year. As part of the agreement, private partners have to invest a minimum of ₹10 crore for a 10-year term or ₹20 crore for 20 years. Half the amount will go towards upgrading infrastructure and modern equipment while the remainder will be used for staffing and training needs. The state had earlier reached out to over 5,000 companies and professionals to collaborate on ITI development. The state's skill education department, under the Maharashtra Startup, Entrepreneurship and Innovation Policy 2025, has designed 20 short-term courses across four categories: management, software, soft skills and New Age technologies such as artificial intelligence and machine learning. Each ITI will offer five courses based on local demand. 'Starting this academic year, ITI students in Maharashtra will have access to new short-term management and technical courses for free,' said Lodha. 'From September 15, courses in business analytics, marketing, production, finance and other management subjects will be introduced across all ITIs.' The courses, of three to four months (about 400 hours) each, aim to equip students with basic management and soft skills. While ITI students can enrol at no cost, others such as degree engineering and agriculture students can also join by paying a course fee. In addition to management training, new technical programmes in areas such as solar panel installation and maintenance, EV mechanics, industrial robotics and digital manufacturing will also be introduced. While talking on the Maharashtra Startup, Entrepreneurship and Innovation Policy 2025, Lodha said, 'To strengthen infrastructure, the government will establish micro-incubators in ITIs, polytechnics and other educational institutions, along with dedicated Regional Innovation and Entrepreneurship Centres (RIECs) in every division. These centres will focus on high-potential sectors such as Artificial Intelligence, Deep Tech, FinTech, Med Tech, Cybersecurity, and Sustainability.'


Hindustan Times
20 minutes ago
- Hindustan Times
Gurugram leads Delhi NCR in sale of luxury housing
The district of Gurugram has emerged as the top destination for luxury housing across Delhi-NCR, accounting for 91% of all luxury residential sales in the region in the first half of 2025, according to a report released by real estate consultancy JLL on Wednesday. Of the 5,168 luxury units sold across NCR between January and June, Gurugram accounted for 4,693 transactions. The report also noted that overall luxury housing sales in the NCR rose by 9% compared to the same period last year, when 4,763 units were sold. (Archives) The report defines luxury housing as apartments priced above ₹5 crore, and states that Dwarka Expressway and Southern Peripheral Road (SPR) were the city's two key micro-markets, jointly contributing 61% of Gurugram's total luxury housing sales. SPR alone accounted for 39%, while Dwarka Expressway made up 22% of the sales. The remaining luxury units were sold in micro-markets such as Golf Course Road, Golf Course Extension Road, and other areas. 'Despite a sharp 23% year-on-year decline in overall housing sales across all price segments in Delhi-NCR, the luxury segment remained resilient,' said Dr. Samantak Das, Chief Economist and Head of Research and REIS, India, at JLL. 'In fact, the share of luxury housing in total sales has grown significantly — rising to 27% in the first half of 2025, compared to 19% in H1 2024 and just 12% in H1 2023.' Noida, by contrast, witnessed sales of just 475 luxury units during the same period. Manish Aggarwal, senior managing director (North and East) at JLL, said that the Dwarka Expressway and SPR corridors are now the epicentres of luxury housing in Gurugram. 'These two corridors now account for 61% of Gurugram's luxury market. Since 2020, 22,000 housing units have been launched in the Delhi NCR primary residential market catering to the ₹5 crore-plus segment. Eighty-nine percent of these have been in various locations of Gurugram,' he said. The report also noted that overall luxury housing sales in the NCR rose by 9% compared to the same period last year, when 4,763 units were sold. Real estate developers attributed this growth to a shift in buyer preferences and evolving definitions of luxury. 'The buyers in the city aren't just acquiring square footage; they're buying into a holistic, high-end living experience. The luxury segment has become largely price inelastic—when a project delivers on all fronts, discerning buyers are willing to pay the premium,' said Aakash Ohri, joint managing director and chief business officer at DLF Home Developers Ltd. Experts said that the recent completion of the Dwarka Expressway has played a key role in boosting residential demand and prices along the corridor. They also pointed to upcoming infrastructure projects such as the new Gurugram Metro line as factors that would further enhance the area's appeal as both an investment and a residential option. Vinod Behl, a Gurugram-based real estate expert, said, 'The sustainable growth of the residential real estate sector cannot rely solely on a surge in luxury housing sales. The continued decline in budget and mid-segment sales poses a serious challenge. Unless this issue is addressed, overall residential sales are likely to fall further — especially given that the sector has already seen a consistent decline over the past three quarters.'


Time of India
35 minutes ago
- Time of India
KSLU to get dedicated administrative building after 15 yrs
Hubballi: After more than 15 years since its establishment, Karnataka State Law University (KSLU) in Hubballi is set to have its own dedicated administrative building. The construction of the G+3 structure is under way on 2.4 acres, at an estimated cost of Rs 39.5 crore. The building is expected to be completed by May 2026. KSLU, established in Jan 2009, currently operates from a former PWD guest house that was repurposed into an administrative office. Spread over a 55-acre campus, the university offers undergraduate and postgraduate courses in constitutional law, intellectual property rights, business and trade law, criminal law, and international law. While around 1,200 students study on the campus, the university has a total student strength of approximately 45,000 across the state. The total built-up area of the four-storey structure will be 94,761 sq. ft. The ground floor will be 24,440 sq. ft, first floor 20,321 sq. ft, second floor 22,255 sq. ft, and third floor 20,321 sq. ft. KSLU vice-chancellor Prof C Basavaraju told TOI that the new building is being constructed on 2.4 acres in front of the existing building. "The project faced land allocation issues earlier. The work was awarded to a Bengaluru-based company in Jan. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Why is everyone rushing to get their hands on this new air cooler? News of the Discovery Undo We expect the work to be completed within the stipulated 11-month timeframe.," he informed. RM Kulkarni, KSLU assistant executive engineer (AEE), explained that the ground floor will house a canteen, bank, post office, storeroom, physical director's office, laboratory and toilets. The first floor will include the vice- chancellor's office, related administrative offices, DPAR section, legal cell, clinic, and a 60-seat auditorium. The second floor will accommodate the finance section, ICT section, syndicate zone and cabins, student welfare and development section, academic zone and toilets. The third floor will feature the engineering section, SC/ST records cell, planning and management office, NSS office, administrative section, and toilets.