logo
Mumbai local train services disrupted today, megablocks on Central & Western Railway lines ; commuters face delays

Mumbai local train services disrupted today, megablocks on Central & Western Railway lines ; commuters face delays

Time of India15-06-2025
MUMBAI: Commuters travelling by local trains may face inconvenience on Sunday due to megablocks on the Central and Western suburban sections.
Main Line
There will be a megablock on the CSMT Mumbai–Vidyavihar UP and DOWN slow lines from 10:55 am to 3:55 pm.
UP slow services departing from Ghatkopar between 10.19 am and 3.52 pm will be diverted to the UP fast line between Vidyavihar and CSMT Mumbai stations, and will halt at Kurla, Sion, Matunga, Dadar, Parel, and Byculla stations.
Harbour Line
On the Harbour line, a block will be in place on the Panvel–Vashi UP and DOWN lines from 11.05 am to 4.05 pm (excluding the Port line). Special local trains will operate on the CSMT–Vashi section during the block period. Trans-Harbour line services will be available between Thane and Vashi/Nerul stations. Port line services will continue as normal during the block.
Western Railway
To carry out maintenance of tracks, signalling, and overhead equipment, a five-hour block will be in effect on the slow lines between Santacruz and Goregaon stations from 10.00 am to 3.00 pm today.
Follow more information on
Air India plane crash in Ahmedabad here
. Get
real-time live updates
on rescue operations and check
full list of passengers onboard AI 171
.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Air India's refurbishment plan deadline delayed again to 2028
Air India's refurbishment plan deadline delayed again to 2028

Economic Times

timean hour ago

  • Economic Times

Air India's refurbishment plan deadline delayed again to 2028

Air India's long-haul fleet refurbishment is now expected to conclude by the end of 2028, a year later than initially planned due to persistent supply chain disruptions and seat manufacturer delays. The retrofit program, crucial for transforming the airline, has faced multiple setbacks, impacting the Boeing 787 and 777 fleets. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads The refurbishment of Air India's long haul fleet has been significantly delayed and will be completed by the end of 2028- a year later after the five year transformation plan that the Tata group had announced earlier, the airline said on Sunday.A Boeing 787 aircraft, the first of the 39 aircraft has been sent to a facility in California last month. The aircraft is expected to return to service in December instead of October as previously upgrade is a crucial part of the five year transformation program that the group had announced in 2022, to convert the debt-laden airline into a world class the program has been delayed multiple times due to supply chain problems as seat manufactures have been strained due to delayed certification from regulators compounded by a manpower shortage after the refurbishment of the 25 787 aircraft will be completed by mid-2027. Part of Air India's ambitious $400 million programme, the retrofits for the 787 fleet were originally scheduled to begin in the second half of 2024 but have faced delays due to supply chain bottlenecks and issues with seat suppliers. The timeline to begin the programme has been revised twice — first to April and then to work on the Boeing 777 fleet will start in the airline will upgrade avionics and other critical components of the 26 legacy B787-8s to improve reliability. This involves analysing maintenance and configuration records and implementing modifications recommended by Boeing's service India's engineering and safety practices have come under regulatory scrutiny following the crash of a Boeing 787 aircraft in June killing 241 on board and 19 on the airline has been put on notice by civil aviation regulator DGCA for operating aircraft fitted with components that were beyond their permitted retrofitting programme for its 27 legacy Airbus A320neo aircraft, which began in September 2024, is 'progressing as scheduled' with completion due in September 2025.

Air India to upgrade avionics, critical components of Dreamliners to reduce operational issues
Air India to upgrade avionics, critical components of Dreamliners to reduce operational issues

The Hindu

time2 hours ago

  • The Hindu

Air India to upgrade avionics, critical components of Dreamliners to reduce operational issues

Air India on Sunday (August 10, 2025) said it will upgrade the avionics and other critical components of its 26 legacy B787-8 Dreamliner aircraft to reduce operational disruptions as well as improve overall reliability. In recent times, the airline has faced operational issues with some of its planes, including the Dreamliner. Air India's Dreamliners — 26 legacy 787-8s and seven 787-9s — had undergone checks, including that of fuel switches, after the fatal crash of a London Gatwick-bound 787-8 plane soon after take off from Ahmedabad that killed 260 people on June 12. Under the $400 million fleet retrofit programme announced in December 2022, the Tata Group-owned airline has now started the retrofit of the first legacy Dreamliner, which was flown to a Boeing facility in Victorville, California in July 2025. "A second aircraft is scheduled to depart for the same facility in October 2025, with both expected to return to service in December 2025," the carrier said in a statement on Sunday (August 10, 2025). As part of a Reliability Enhancement Programme, the airline said it will be upgrading the avionics and other critical components of the 26 legacy B787-8 aircraft up to the latest industry standards, thus improving their reliability. "The programme entails the analysis of maintenance and configuration records for these aircraft, followed by the implementation of recommended modifications based on Boeing's service information bulletins. "This is intended to reduce operational disruptions for both Air India and its customers," the statement said. Additionally, the airline said seven of the 26 B787-8s will undergo heavy, scheduled maintenance (D-checks) at Victorville, ensuring the fleet's long-term operational excellence. The retrofit of the legacy Dreamliners is expected to be completed by mid-2027 and the retrofitted planes will have a three-class configuration — Business, Premium Economy and Economy Class seats. "Starting in early 2027, Air India will additionally retrofit 13 of its legacy Boeing 777-300ER aircraft, aiming for completion by October 2028, with the timeline having shifted due to supply chain delays," the statement said. Air India has around 190 narrow-body and wide-body planes. The airline's retrofit programme for 27 legacy A320 neo aircraft that commenced last September is expected to be completed in September this year. So far, 16 A320neo aircraft have been retrofitted. Air India has also decided to retrofit its 13 legacy A321 ceo planes that were earlier planned to be taken out of service.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store