
Illegal chalet development raises alarm over Behrang River ecosystem in Perak
TANJONG MALIM: Several cases of unauthorised commercial development on government land are raising environmental concerns in Perak, as illegal chalet construction threatens the ecosystem along Sungai Behrang in Muallim.
What began as a trend of encroachment for agricultural and residential purposes has now shifted towards commercial ventures.
In this latest case, permanent structures — including a two-storey bungalow-style building — have been erected near the river, believed to be without planning approval, a visit by Berita Harian to the site revealed.
Located near Kampung Sungai Dara, the riverside area is a popular spot for nature enthusiasts, particularly hikers and swimmers. The illegal development poses a risk to the integrity of the river reserve, which plays a vital role in protecting water quality and biodiversity.
The structure is believed to have been built over an area of 500 square metres, encroaching on approximately half an acre of government-owned land, including part of the protected river reserve.
According to a source, the chalet construction has exceeded the boundaries of private land and intruded into both government land and the river buffer zone. "The construction of the permanent structure goes beyond private land and is found to encroach on government land and the river reserve," the source said.
Under environmental regulations, developments near rivers must maintain a buffer zone of between 20 and 40 metres. However, the structure in question was found to be less than 20 metres from Sungai Behrang, in direct violation of these guidelines.
"We found that the structure was erected about two months ago before a canvas fence was put up to hide the activity from villagers and authorities," the source added.
Authorities had already issued two eviction notices under Section 425 of the National Land Code (Act 828), dated February 2025. The notices confirmed that the party involved was occupying government land in the Sungai Dara region without permission.
"The developer is requested to vacate the site within 14 days from the date of the notice," the document stated. "If you fail to do so, the Muallim land administrator or any officer authorised by them has the right to take legal action to ensure the site is vacated."
"If necessary, destruction, demolition, seizure, or removal of any property belonging to you will be carried out without reference to any party," the notice warned.
Despite the deadline having passed, the structure remains standing, and the residence is believed to be occupied by foreign workers linked to the chalet project. A site inspection revealed gas cylinders and clothing, indicating recent activity inside the premises.
"This is the second time the operator has built on the same site," a source said, referencing a previous attempt in 2018 involving piling work, which was later dismantled by authorities.
Monitoring of the site began earlier this year, culminating in the issuance of the February notices. Still, the operator has failed to comply.
"We identified at least five workers at the site, but they have stopped work since February," the source noted.
The case highlights not only a legal violation but also a growing pattern of disregard for environmental safeguards. Experts warn that illegal development in river reserves accelerates erosion, pollutes water sources, and damages habitats.
Officials stress that any construction must follow the proper procedures. "For any development, the operator must obtain planning permission from the local authority before land ownership can be requested from the district land office," the source explained.
Muallim district is a natural gem, surrounded by the Titiwangsa Range and home to nine scenic mountains, including Mount Behrang, and Mount Sanggul.
The area also features popular waterfalls like Strata Falls, Warin Falls, and Ulu Slim, drawing both local and international tourists seeking outdoor adventure and relaxation.
Meanwhile, officials in Muallim have moved swiftly to curb illegal land encroachment, as unauthorised chalet developments threaten sensitive river ecosystems.
The Muallim District and Land Office has taken action in at least five cases of encroachment on government land and river reserves, all involving construction for commercial purposes. Investigations into other affected areas are currently under way.
Assistant District Officer from the Technical and Enforcement Unit, Sarina Omar, said the authorities have been proactive in demolishing structures built without approval. A recent operation involved dismantling a concrete structure in the Sungai Dara river reserve, believed to be intended for commercial use.
"Following investigations, we launched the operation in coordination with multiple departments and agencies, under the oversight of the Muallim District and Land Office and the Perak State Land and Mines Office," Sarina. Notices were issued in advance under Section 425 of the National Land Code (Act 828).
Sarina said that those found guilty of encroaching on government land face fines of up to RM500,000 or imprisonment for up to five years. She said that the operations aim to stop illegal expansion, protect river access, and preserve the area's natural environment.
River reserves serve as vital buffer zones, safeguarding ecosystems and nearby land from natural disasters, she explained. "This initiative is aligned with the Perak Sejahtera 2030 agenda, which places environmental sustainability at the heart of state development," Sarina added.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Straits Times
4 days ago
- New Straits Times
Police receive 188 reports over alleged LGBT event in PJ
KUALA LUMPUR: A total of 188 police reports have been lodged concerning allegations of a programme related to lesbian, gay, bisexual, and transgender (LGBT) issues, said to have been organised by the youth wing of a political party in Petaling Jaya. Federal Criminal Investigation Department director Datuk Seri Mohd Shuhaily Mohd Zain said the reports were filed by various parties nationwide after the issue went viral last week. He said that police would be summoning the event organisers to record their statements in due course. "As of now, the police have received 188 reports on the matter. We will be calling in the organisers for questioning," he said when contacted by Berita Harian today. Previously, Selangor police chief Datuk Hussein Omar Khan said that police had launched an i nvestigation following a social media post regarding a planned programme, believed to be scheduled for June 21 at an undisclosed location in Petaling Jaya. According to police, the programme is believed to have provoked public sensitivity and violated national laws, which do not recognise any form of LGBT practice. The case is currently being investigated under Section 298A of the Penal Code, for actions likely to disturb public harmony by insulting or degrading religion, and Section 233 of the Communications and Multimedia Act 1998, for the improper use of network services.


Free Malaysia Today
6 days ago
- Free Malaysia Today
Malaysian man drowns while diving in Aceh
The diver was said to have attempted to surface following the instructor's instructions but lost consciousness upon reaching the surface. (Freepik pic) PETALING JAYA : A 33-year-old Malaysian man drowned while diving in the waters off Iboih in Kota Sabang, Aceh, Indonesia, yesterday morning. Berita Harian reported that the victim was diving at the popular site with two other Malaysians and a dive instructor when the incident occurred at 9.30am. The daily quoted Berita Rakyat Aceh as saying Indonesian police rushed to the site after receiving a report. The group had been diving for about 20 minutes at a depth of 30m when they were caught in a strong underwater current. The victim was said to have attempted to surface following the instructor's orders but lost consciousness upon reaching the surface. He was immediately assisted by the others and taken to Pantai Iboih in a speedboat. Cardiopulmonary resuscitation was administered by the instructor and fellow divers before he was taken to a nearby clinic. He was pronounced dead upon arrival an hour later at 10.30am. His body was taken to Sabang City Hospital for a post-mortem. The remains are expected to be repatriated to Malaysia once the post-mortem is completed.


New Straits Times
6 days ago
- New Straits Times
RM10,000 'backdoor' fee for couples married in Thailand to register marriage in Malaysia
KUALA LUMPUR: Marriage agents are allegedly charging up to RM10,000 to couples who want to legally register marriages conducted abroad in Malaysia using the 'selit' (backdoor) method. These agents claim to have insiders or contacts among religious office officials who can assist in registering overseas marriages without following the standard procedures set by the authorities. However, there is no guarantee that the marriage registration process will be completed quickly, as it also depends on the availability of the officer handling the process, which may take up to a year or more. This information was revealed by a marriage agent known as Abang Ismail, who has nearly 15 years of experience helping Malaysian couples get married in Thailand, particularly in the provinces of Songkhla, Satun, and Narathiwat. The agent told Berita Harian that most couples choose to marry in neighbouring countries because the process is easy, quick, and inexpensive. Additionally, many men do not want their polygamous marriages to a second or subsequent wife to be known to their first wife or family. "We help a lot of Malaysian couples, starting from Changlun (in Kedah) or Padang Besar (in Perlis), before taking them to marry in front of a qadi from the Southern Thailand Islamic Religious Council. "There are witnesses, and a dowry that the husband must provide to the wife. We follow all religious laws, and the marriage is valid. "Once the marriage is completed, we register it at the Malaysian Consulate in Songkhla. The fee isn't too expensive; I charge around RM2,500 or slightly more, depending on how many days they stay on holiday in Thailand." When asked about the process of registering the marriage in Malaysia, Abang Ismail said he initially advises couples married in Thailand to handle the registration themselves in their state of residence. He said this process is easier for the couple, as they only need to pay a fine imposed by the court for marrying outside the designated area or without the necessary permissions under Malaysian law. He also claimed that these marriage agents have some "good friends" who can help manage the marriage registration at religious offices in Malaysia, though there is no guarantee it can be done quickly, with most cases taking more than a year. "Those who marry in Thailand must register at the Malaysian Consulate in Songkhla, and after three days, they will receive a certified marriage letter. "This letter must be brought back to Malaysia to register the marriage at the religious office in their area of residence. "If they do not want to register at the counter (at the religious office), we can register through the 'backdoor,' but it will also take time to complete. "A small token (payment) is required for the 'friend' (agent) handling it, but no need to worry as they want to help Malaysians who marry in Thailand. "Marriage under Thai law is indeed valid, with the couple becoming husband and wife as usual, but as Malaysians, we have to follow the law and register the marriage in Malaysia. It is easier to register it themselves, but many are afraid, so we help as needed," he said. Unauthorised marriage agents operating along the northern border have been identified as a cause of corruption and abuse of power involving officers from the Islamic Religious Affairs Department in a northern state, as previously uncovered by the Malaysian Anti-Corruption Commission (MACC). MACC deputy chief commissioner (Prevention), Datuk Azmi Kamaruzaman, said his department had detected several governance weaknesses in the management of Foreign Marriage Registration by the department. He added that the religious agency needs to act swiftly to close any gaps and opportunities for corruption, abuse of power, and misappropriation.