
Credit growth influenced by economic activity rather than surplus liquidity: Report
New Delhi: Credit growth in the economy is influenced more by overall economic activity than by the size of the liquidity surplus, according to a recent report by Standard Chartered, an international bank.
The report noted that while a high liquidity surplus may provide some support to unsecured personal loan growth (excluding consumer durable loans), it does not automatically lead to broad-based credit growth.
It stated, "Credit growth depends more on economic activity than the size of the liquidity surplus; however, unsecured personal loan growth (ex-consumer durables) could get a fillip on a large liquidity surplus".
In fact, as the report mentioned that the credit growth excluding unsecured personal and consumer durable loans tends to slow during periods of excess liquidity.
This trend suggested that the real demand for credit, which is closely linked to economic activity, is a more important driver than the availability or cost of funds.
"Slower economic activity triggers action by the central bank to increase the liquidity surplus as a counter-cyclical measure," the report said.
However, despite such efforts, overall credit (excluding unsecured personal and consumer durable loans) as a share of GDP has declined during past episodes of high liquidity surplus.
For example, the report highlighted that during the period from December 2016 to September 2017, when liquidity surplus ranged between 2.6 per cent and 3.3 per cent of Net Demand and Time Liabilities (NDTL), credit (excluding unsecured personal and consumer durable loans) as a percentage of GDP fell from 48.9 per cent to 46.2 per cent. This decline continued until mid-2019.
Interestingly, unsecured personal loan growth (excluding consumer durables) has shown a strong uptrend over the last decade. Its size more than doubled to around 6 per cent of GDP.
While this growth is largely driven by structural factors such as improved access to credit and the rise of digital lending, the report pointed out that its pace of expansion tends to increase during periods of high liquidity surplus.
During March 2021 to March 2023, as per data shared by the report amid a large liquidity surplus and relaxed credit conditions, the share of unsecured personal loans in GDP rose at a faster pace than during previous similar episodes.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Times of Oman
an hour ago
- Times of Oman
Govt revises biomass guidelines to boost bio energy and ease of doing business
New Delhi: The Centre has revised guidelines for the Biomass Programme under Phase-I of the National Bioenergy Programme to promote cleaner energy solutions, ease of doing business, and accelerate the adoption of biomass technologies across the country, according to a statement. "The Ministry of New and Renewable Energy (MNRE) has issued revised guidelines for the Biomass Programme under Phase-I of the National Bioenergy Programme, applicable for the period FY 2021-22 to 2025-26. These amendments aim to promote cleaner energy solutions, ease of doing business, and accelerate the adoption of biomass technologies across India," the statement said. Under the new framework, Ministry has simplified several processes, such as cutting down on paperwork and easing approval requirements, which will enable the industry especially MSMEs to enhance their production. These changes align well with improvement of stubble management and India's broader goal of reaching net-zero emissions by 2070, the statement added. One of the major highlights of the revision is technological integration by enabling the use of IoT-based monitoring solutions or quarterly data submissions instead of expensive and high-tech systems like SCADA. This cost-effective step promotes digital monitoring and accountability, especially for smaller business operators. The guidelines also encourage significant simplification of documentation requirements. Developers of briquette and pellet manufacturing plants will no longer be required to submit a number of documents related to clearance matters. This change will save time, and promote ease of doing business. In a move to enhance operational flexibility, the earlier requirement for a two-year briquette or pellet sale contract has been replaced with a general sale agreement. This change will allow project developers to respond more dynamically to market conditions without being constrained by long-term contracts, as per the Ministry's statement. The amended guidelines allow flexible selling of biomass products, meaning businesses no longer need long-term contracts to get started. Furthermore, the subsidy disbursement mechanism under the Central Financial Assistance (CFA) component has been made performance-based and transparent. Projects that run efficiently, above 80%, will receive full financial assistance, while below 80 percent will receive on pro-rata basis. The performance inspection period has been simplified. Earlier, it has to be done within a period of 18 months from the date of commissioning, but now, it can be carried out within 18 months period either from the commissioning date or from the date of In-principle approval, whichever is later. Additionally, to cater on-ground operational challenges of developers, Secretary, MNRE may extend the time period, the Ministry added. During inspection, a performance report was made on the basis of Operation Plant at an average of 80 per cent of rated capacity measured over a period of three consecutive days, taking average 16 Hrs per day. However, now it has been reduced to just 10 hours as the inspection process primarily aims to verify the claimed and operational capacities and inspection for 10 hours of continuous operation would suffice for this purpose. Recognising the urgent need to address air pollution, especially from stubble burning in northern India, the new guidelines include a provision allowing biomass pellet producers in Delhi, Punjab, Haryana, and NCR districts of Rajasthan and Uttar Pradesh to choose the most beneficial support scheme, either from MNRE or CPCB. These revisions will not only support the smooth implementation of the biomass programme and timely delivery of approved financial support to commissioned plants, but also encourage the sector to establish more biomass-based plants. This would ultimately help in addressing the menace of crop residue burning and ensure sustainable management of agricultural waste. Overall, the updated guidelines will make it easier for businesses to adopt biomass technologies, provide financial incentives for efficient operations, and support India's clean energy efforts, all while promoting practical, business-friendly solutions to waste management and pollution reduction.


Times of Oman
8 hours ago
- Times of Oman
Credit growth influenced by economic activity rather than surplus liquidity: Report
New Delhi: Credit growth in the economy is influenced more by overall economic activity than by the size of the liquidity surplus, according to a recent report by Standard Chartered, an international bank. The report noted that while a high liquidity surplus may provide some support to unsecured personal loan growth (excluding consumer durable loans), it does not automatically lead to broad-based credit growth. It stated, "Credit growth depends more on economic activity than the size of the liquidity surplus; however, unsecured personal loan growth (ex-consumer durables) could get a fillip on a large liquidity surplus". In fact, as the report mentioned that the credit growth excluding unsecured personal and consumer durable loans tends to slow during periods of excess liquidity. This trend suggested that the real demand for credit, which is closely linked to economic activity, is a more important driver than the availability or cost of funds. "Slower economic activity triggers action by the central bank to increase the liquidity surplus as a counter-cyclical measure," the report said. However, despite such efforts, overall credit (excluding unsecured personal and consumer durable loans) as a share of GDP has declined during past episodes of high liquidity surplus. For example, the report highlighted that during the period from December 2016 to September 2017, when liquidity surplus ranged between 2.6 per cent and 3.3 per cent of Net Demand and Time Liabilities (NDTL), credit (excluding unsecured personal and consumer durable loans) as a percentage of GDP fell from 48.9 per cent to 46.2 per cent. This decline continued until mid-2019. Interestingly, unsecured personal loan growth (excluding consumer durables) has shown a strong uptrend over the last decade. Its size more than doubled to around 6 per cent of GDP. While this growth is largely driven by structural factors such as improved access to credit and the rise of digital lending, the report pointed out that its pace of expansion tends to increase during periods of high liquidity surplus. During March 2021 to March 2023, as per data shared by the report amid a large liquidity surplus and relaxed credit conditions, the share of unsecured personal loans in GDP rose at a faster pace than during previous similar episodes.


Observer
19 hours ago
- Observer
Oman's first green ammonia project begins receiving key cargo
MUSCAT, JUNE 27 Project cargo has begun arriving at the Special Economic Zone at Duqm (SEZAD) for Oman's first green hydrogen and ammonia venture — a landmark initiative set to kickstart the Sultanate of Oman's gigawatt-scale green energy industry. Green Hydrogen and Chemicals Company SAOC (GHC), a wholly owned subsidiary of India-based renewable energy developer ACME Group, is developing the green ammonia plant with an initial capacity of 100,000 tonnes per annum (tpa). The project, estimated at around $750 million, is designed for phased expansion to 1.1 million tpa. Last week, Khimji Ramdas Shipping announced the successful discharge and inland delivery of the first major consignment of project cargo from the Port of Duqm to the plant site. The shipment comprised 14 packages of oversized equipment, including a single unit weighing 120 metric tonnes. This shipment marks the first in a series of heavy cargo deliveries expected at Port of Duqm in the run-up to the plant's scheduled commissioning in Q1 2027. Forthcoming consignments will include solar PV modules, trackers and electrolysers — key components already under contract as part of the project's broader supply chain. Earlier this month, GameChange Solar, a global leader in solar tracking systems, announced a deal to supply its Genius Tracker technology for a 450 MWp solar installation that will generate renewable electricity for the project. The 1P single-row tracker system is engineered to withstand high winds and extreme weather conditions, making it suitable for Al Duqm's coastal environment. Leading Chinese manufacturer Sungrow Hydrogen revealed it had been contracted to supply multiple sets of 1000 Nm³/h alkaline electrolysis systems, along with flexible green hydrogen production solutions. Deliveries are expected to be completed by end-2025. Fellow Chinese company Shuangliang Hydrogen has also secured a contract to supply hydrogen production equipment for the same project, with delivery similarly due by year-end. In parallel, UAE-based DarkOcen Geostar recently completed the fieldwork phase of an offshore geotechnical investigation at SEZAD. The campaign included borehole drilling, Cone Penetration Testing (CPT) and evaluations of pipeline corridors and marine anchor points to support the development of future marine infrastructure for the ammonia plant. The Duqm green ammonia project is one of nine large-scale green hydrogen initiatives planned for development across Oman's Al Wusta and Dhofar governorates over the next decade. These projects collectively represent investments exceeding $40 billion. The timely delivery and execution of the Duqm plant is seen as pivotal to unlocking Oman's broader hydrogen strategy. As part of a long-term offtake agreement signed last year, Norwegian fertiliser giant Yara will lift the full annual output from the first phase — 100,000 tonnes of green ammonia — reinforcing the project's strong commercial foundation.