logo
Fencing, signage revamp to help protect Yamuna floodplain: DDA

Fencing, signage revamp to help protect Yamuna floodplain: DDA

Time of India5 days ago
New Delhi: Delhi Development Authority (DDA) will restore and renovate Yamuna signage boards from Wazirabad Barrage to NH-24 on both banks of the river. Officials indicated the initiative aims to clearly mark the floodplain surrounding the northern ridge.
The DDA is also implementing a steel fencing project covering 11km of the Yamuna floodplain from Wazirabad Barrage to ITO Barrage to safeguard the environmentally critical zone from unauthorised occupation. The selected contractor is expected to complete the Rs 18 crore project within four months. This action is part of a comprehensive strategy to preserve and safeguard the floodplain.
In April, DDA reported to the National Green Tribunal (NGT) about recovering 24 acres of occupied land under the Yamuna Vanasthali project between Jan and April.
The initiative will secure restored floodplain areas like Yamuna Vatika, Asita and other vacant patches on both eastern and western banks. A tender has been floated for this, the authority said.
You Can Also Check:
Delhi AQI
|
Weather in Delhi
|
Bank Holidays in Delhi
|
Public Holidays in Delhi
The DDA has established various recreational facilities on the Yamuna floodplain over the previous two years, including parks and cafes, along the 22-km river stretch between Wazirabad Barrage and Okhla Barrage. The developments comprise Asita East and West and Kalindi Aviral, encompassing Baansera Park, Vasudev Ghat, Amrut Biodiversity Park and Yamuna Vatika near Rajghat, spanning 740 hectares in total.
The current Yamuna Vanasthali initiative — a floodplain restoration project on the eastern bank — extends from Wazirabad Barrage to Sarai Kale Khan ISBT Bridge, covering 236.5 hectares. The DDA intends to create connections between all existing and future parks situated along the Yamuna floodplain.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Water storage in Isarda dam from July 30
Water storage in Isarda dam from July 30

Time of India

timean hour ago

  • Time of India

Water storage in Isarda dam from July 30

Bhilwara: With construction of the Isarda dam project on the Banas River nearing completion, the irrigation department has issued orders for starting water storage from July 30. As per the initial plan, preparations are on to have the dam filled up to 3.27 TMC (thousand million cubic feet) out of its 10.77 TMC capacity. Constructed at a cost of Rs 615 crore, Isarda dam will supply water to seven towns and 1,256 villages in Dausa and Sawai Madhopur districts. It is the second largest in Tonk district after Bisalpur, which has a capacity of 38.800 TMC. Strategically positioned between Banetha and Isarda villages on the Tonk-Sawai Madhopur border, the dam features a 600-metre concrete structure with 28 gates. Water levels can reach a height of 262 RL metres, addressing the water needs of the region. Despite multiple deadline extensions, the dam is now completed nearly 95%. Keeping the monsoon rains in view, the Water Resources Department has ordered that from July 30, water will be stored in phases in the Isarda dam until Sept 15, marking a significant milestone for the project. Executive engineer of the Isarda Dam Project, Vikas Garg, told TOI, "Now, water is released daily from two gates of the Bisalpur Dam into the Banas River. The irrigation department in Jaipur has issued orders to stop water in the Isarda dam in phases until Sept 15. For the first time, water will be retained in the dam starting July 30, and we are fully prepared to do so." The dam is a critical part of the Eastern Rajasthan Canal Project (ERCP), with plans to channel water from Isarda to the Ramgarh dam.

H'bag man builds temple in wife's memory
H'bag man builds temple in wife's memory

Time of India

time2 hours ago

  • Time of India

H'bag man builds temple in wife's memory

Hazaribag: A man from Khambhwa village of Tatijharia in Hazaribag district is constructing a temple in memory of his late wife Satyabhama Devi, who died in 2023. Talking about his wife, the man identified as Bhola Sharma, a 65-year-old retired teacher, said, "A woman considers her husband as God and so the husband should also see and treat her in the same manner. Tired of too many ads? go ad free now She was one of my strongest pillars of my life in any circumstance I was in. Hence, it is my duty and responsibility to keep her memory alive by building a temple." Sharma also said he has spent over Rs 10 lakh of his retirement money on the construction of the structure. "The work is almost over now and only the painting work is pending," he said, adding that his son, Shivkumar Sharma, and grandson, Neelmani Pandey, helped him with the work. The retired teacher also said the temple would not have any statue of his wife. "My wife was a devotee of 'Gram Devi', or the local deity revered as the local guardian of the area. We will put an idol of the 'Gram Devi'. My wife used to talk about constructing a Gram Devi temple in the village, but she died with her dream unfulfilled. Now, this temple in her memory will be a fulfilment of her desire," he said, adding that the temple will have a plaque containing her name.

Nashik civic body to chop 154 trees to build STP at Agartakli
Nashik civic body to chop 154 trees to build STP at Agartakli

Time of India

time4 hours ago

  • Time of India

Nashik civic body to chop 154 trees to build STP at Agartakli

Nashik: The city is about to get a new sewage treatment plant (STP) as part of the Godavari purification project and it will come at the cost of 154 trees which will be felled to make way for the construction at Agartakli in the Nashik East division. Tired of too many ads? go ad free now The tree authority department of Nashik Municipal Corporation (NMC) has called for suggestions and objections from people regarding the felling of trees and will accept submissions till July 31. The garden department has also said they will plant at least 10 trees for each tree axed. Moreover, trees like peepal and banyan, will be transplanted elsewhere. "If a tree that is to be chopped is 15 years old, then we will plant 15 trees. We will calculate the total age of all the 154 trees to be chopped and will plant trees accordingly…Considering the average age of 10 years of all the trees, around 1,500 trees will be planted in the city," said Bhadane. The proposed STP is part of the Rs 1,475 crore Godavari purification projectwhich is slated to be completed before the upcoming Simhastha Kumbh Mela, scheduled to be held between 2026 and 2028. At Agartakli, NMC wants to build the new STP with a 97MLD capacity. A private agency has been finalised and work order has been given to the agency so far. At present 11 STPs in the city collectively have a total treatment capacity of 392million litres daily (MLD).

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store