
Sr rly board official checks new metro stretches ahead of likely launch by PM, chairman may visit city today
Railway Board chairman
Satish Kumar is scheduled to be in the city on Tuesday to review preparations for the upcoming Prime Ministerial event on Aug 22. A senior Railway Board official was in town on Monday to take stock of new Metro stretches which are due to be launched by PM Modi on Aug 22.
East-West Metro's last leg (2.6 km Esplanade-Sealdah section), the Orange Line's Phase II (4.4 km Ruby-Metropolitan), and the Yellow Line's Phase I (the 7 km Noapara-Airport) may be flagged off by the PM. Braj Mohan Agrawal, member (traction and rolling stock), Railway Board, took stock of the readiness of the new stretches.
Agrawal inspected the N-S Metro (Blue) Line, which has an interface with the Yellow Line at Noapara. He took a train ride from Jatin Das Park to Noapara. He inspected the 7-km Noapara to Jai Hind (airport) stretch of Yellow Line by taking a train ride between the two stations. He also inspected Airport metro station. Agrawal also visited the Noapara carshed, where he dedicated two Dalian Rakes MR 508 and MR 510 for passenger service.
You Can Also Check:
Kolkata AQI
|
Weather in Kolkata
|
Bank Holidays in Kolkata
|
Public Holidays in Kolkata
Officials of RVNL, implementing agency of Orange Line or New Garia-Airport corridor, inspected Ruby-Metropolitan (Beleghata station).
Stay updated with the latest local news from your
city
on
Times of India
(TOI). Check upcoming
bank holidays
,
public holidays
, and current
gold rates
and
silver prices
in your area.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
an hour ago
- News18
Mumbai Metro-8: CSMIA-Navi Mumbai Airport In 30 Minutes, This Line Aims For Gold Standard Of Travel
Last Updated: Mumbai Metro Gold Line: When will work on CSMIA to Navi Mumbai airport Metro line 8 begin? Will it be linked to existing Navi Mumbai Metro? When will it be ready? Explained Mumbai Metro Line 8: Airports to underground & elevated travel – The answer to all of this is one Metro route, the line 8 connecting T2 of the Chhatrapati Shivaji Maharaj International Airport (CSMIA) to the upcoming Navi Mumbai International Airport (NMIA), which is being planned. What's more? There are plans to connect Mumbai Metro line 8 to the existing Navi Mumbai Metro network. Mumbai Metro-8: What will be the route of the gold line? What will be the stations? The line will begin at CSMIA Terminal 2 in Andheri, travel underground till Chhedanagar in Chembur, and then continue as an elevated line until NMIA. The alignment will pass through key urban locations including Kurla, Lokmanya Tilak Terminus (LTT), Mankhurd, Vashi, Nerul, Kharghar and Belapur. Total length: 35 km, with 25.8 km elevated and 8.2 km underground Likely station list (from DPR/concept): The likely route could cover CSMIA T2, Marol Naka (interchange Lines 1 & 3), Saki Naka (Line 1 interchange), Powai, Kanjurmarg (Line 6 interchange), Mulund East, Airoli, Ghansoli, Koparkhairane, Belapur CBD, NMIA Terminal 1, NMIA Terminal 2. What is the cost of Mumbai Metro-8? Estimated project cost: Rs 15,000 crore Being executed under a Public–Private Partnership (PPP) model, with CIDCO preparing the DPR and MMRDA also involved. What is the status of the Mumbai Metro-8? When will the work start? What is the deadline? Approval granted in January 2025 DPR completed by CIDCO; bidding expected late 2025 Construction expected to commence mid 2026, with full operations projected by late 2028 to early 2029. What is the frequency being planned for Mumbai Metro-8? Designed as an airport express, it is likely target to speeds up to 90 km/h, with reduced stops and fewer stations to ensure speedier travel (30-40 mins versus 2+ hours by road). Frequency planned at every 15 minutes. How will Mumbai Metro-8 cut travel time? The line is expected to cut airport-to-airport commute from 2 hours (by road) to about 30 minutes. HousieyI Love Navi Mumbai. Benefits include reduced congestion, eco-friendlier travel, real estate uplift along corridor (Powai, Kanjurmarg), economic growth, and tourism boost. Will Mumbai Metro-8 be connected to other lines? Metro 6: Kanjurmarg Likely with Line 2B (CSMT-Panvel), local suburban rail and bus systems in Belapur. Easy switching between lines is expected due to proximity and design of interchange stations. How will Mumbai Metro-8 help officegoers? It will help frequent airport commuters—corporate travellers, airport staff, business travelers—due to reliability, reduced travel time, and avoidance of road traffic. #NaviMumbaiAirport is gearing up to welcome you — and at the heart of it all is ORAT: Operational Readiness, Activation, and systems and staff to passenger experience, every detail is being fine-tuned to ensure a smooth and coordinated opening day. Stay tuned… — Navi Mumbai International Airport (@navimumairport) July 15, 2025 Mumbai Metro-8: Ticketing and fare structure Official rates not yet announced. Estimated fares (projected) could be short segments: Rs 20-30; medium (e.g., Vashi-Belapur): Rs 40-60; Long (Seawoods/Nerul to CSMIA): Rs 100-120; Airport-to-airport: Rs 150-180. Likely to support smart card, mobile ticketing, integrated passes and perhaps airport-standard facilities (lounges, luggage space). Points to Remember for Ticket Buyers Watch fare slabs impacted by travel distance. Consider monthly passes or integration with existing smart cards/apps for convenience. If traveling airport to airport, luggage norms or premium charges might apply. Will Mumbai Metro-8 be connected to other public transport & future lines? Interchanges with existing Metro lines (1, 3, 6) are planned. It will connect indirectly to suburban rail and bus networks, particularly at Belapur CBD and Mankhurd. Future lines (e.g., Line 2B or others in Navi Mumbai) may further integrate with Line 8 corridor CSMIA & MUMBAI METRO For those directly travelling from Mumbai, Metro Line 7A, an extension of Metro-7, is the one which will take you to the CSMIA. It includes both elevated and underground sections. A tunnel breakthrough has been achieved. Points to remember From city: Metro-7A, an extension of Metro-7, connects Andheri East to CSMIA T2. From city, suburbs: Metro-1 (the existing Versova-Andheri-Ghatkopar corridor) also takes to Airport Road station, from where you can transfer to Metro-7A. From suburbs: Metro-9 (Dahisar to Mira-Bhayander) connects to Metro-7 at Dahisar. Metro-7 in short: It is part of the elevated 16.5-km red line from Andheri (E) to Dahisar (E) which runs along the Western Express Highway from Dahisar to Gundavali. The stations are — Dahisar East, Ovaripada, National Park, Devipada, Magathane, Poisar, Akurli, Kurar, Dindoshi, Aarey, Goregaon E (Interconnect Mumbai Metro-6: Pink Line), Jogeshwari E, Shankarwadi, and Gundavali (Earlier Andheri East, Interconnect Mumbai Metro 1 – Blue Line and Mumbai Metro: 7A – Red Line). Metro-7A has two stations — Airport Colony (elevated) and Chhatrapati Shivaji Maharaj International Airport (underground). Metro-9 in short: The Dahisar (East) to Thane's Kashigaon Metro line is an extension of Metro-7. Its stations are – Dahisar (East), Pandurangwadi, Miragaon, Kashigaon, (phase 2 begins) Sai Baba Nagar, Meditiya Nagar, Shahid Bhagat Singh Garden, Subhash Chandra Bose Stadium. Metro-9 connects to Andheri (West) via Line 2B, Ghatkopar via Metro-7 and 1, Link Road through Metro Line-2A at Dahisar (East), and Thane via Line 10 at Miragaon (in the future). The Link to existing Navi Mumbai Metro Line Operational since November 17, 2023, covering an elevated corridor of 11 km with 11 stations from CBD Belapur to Pendhar, the Navi Mumbai Metro line is being gradually extended toward Khandeshwar and Navi Mumbai International Airport (NMIA), reaching a planned full length of 23.4-23.6 km with 20 stations. Navi Mumbai is a rapid transit rail system, which has one operational line. The project has three phases: Phase 1: Belapur to Pendhar (11.10 km) with 11 stations – CBD Belapur, Sector 7, CIDCO Science Park, Utsav Chowk, Sector 11, Sector 14, Central Park, Pethpada, Sector 34, Panchanand and Pendhar Metro Station. Phase 2: Khandeshwar to MIDC Taloja (extension to Airport proposed) (10.3 km) with 8 stations –Khandeshwar, Kalamboli, Sector 13, Sector 11, Sector 7E, Sector 7, Sector 2E, and MIDC Taloja. Phase 3: Interlink between Pendhar and MIDC Taloja (2.2 km) with one station. Navi Mumbai Metro Line: Key stations CBD Belapur (interchange with Mumbai suburban rail) Belpada (Kharghar) (interchange with Kharghar railway station) Pethali–Taloja (near Taloje Panchnand rail station) Pendhar terminal Navi Mumbai Metro Line: What are its operating hours and frequency? Operating hours: 6:00 AM to 10:00 PM daily Frequency: Early operations indicate a train every 15 minutes, especially in Phase I stretch; frequency improvements are expected as ridership grows Navi Mumbai Metro Line: What is the fare structure? Distance-based fare slabs from Rs 10 (up to 2 km) to Rs 40 for journeys over 10 km. CIDCO recently rolled out a QR-based ticketing system, allowing mobile or paper tickets purchased via app or soon via WhatsApp and NCMC smart cards for unified travel across networks. Navi Mumbai Metro Line: Is it linked to Mumbai Metro? Direct link proposed via Mumbai Metro Line 8 (Gold Line), with an interchange at proposed Sagar Sangam station in Belapur, linking it with Navi Mumbai Metro Line 1. Several stations provide direct or nearby suburban rail interchanges: CBD Belapur: Belapur suburban railway (Harbour Line) Belpada (Kharghar): Kharghar railway station Pethali-Taloja: Taloje Panchnand railway station top videos View all Feeder systems are being planned: shared autos, BEST bus bays, and pedestrian access with autorickshaw facilities near key stations. Additionally, the Mumbai Metro Line 12 (Kalyan-Taloja Metro) will interlink with the Navi Mumbai Metro at Taloja. About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Mumbai airport Mumbai metro mumbai metro inauguration mumbai metro line mumbai metro project Mumbai Metro Rail Corporation Mumbai Metropolitan Region Development Authority Navi Mumbai airport Navi Mumbai Metro view comments Location : Mumbai, India, India First Published: August 12, 2025, 17:28 IST News cities » mumbai-news Mumbai Metro-8: CSMIA-Navi Mumbai Airport In 30 Minutes, This Line Aims For Gold Standard Of Travel Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


Time of India
2 hours ago
- Time of India
Union Cabinet approves Phase-IB of Lucknow Metro project at a cost of Rs 5,801 crore
The Union Cabinet on Tuesday approved Phase-IB of the Lucknow Metro project with a corridor length of 11.165 km at a cost of Rs 5,801 crore, Railway Minister Ashwini Vaishnaw said. According to the government, on operationalisation of Phase-1B, Lucknow will have 34 km of active Metro rail network. Finance Value and Valuation Masterclass - Batch 4 By CA Himanshu Jain View Program Artificial Intelligence AI For Business Professionals Batch 2 By Ansh Mehra View Program Finance Value and Valuation Masterclass - Batch 3 By CA Himanshu Jain View Program Artificial Intelligence AI For Business Professionals By Vaibhav Sisinity View Program Finance Value and Valuation Masterclass - Batch 2 By CA Himanshu Jain View Program Finance Value and Valuation Masterclass Batch-1 By CA Himanshu Jain View Program The Cabinet meeting was chaired by Prime Minister Narendra Modi. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Tiger got separated from her zookeeper 5 Years Ago. See their reunion! Story To Hear Undo In a statement, the government said that Phase-1B of the Lucknow Metro Rail Project represents a significant advancement in the city's infrastructure development , marking a major expansion of the Metro rail network in the state capital. The new corridor will introduce approximately 11.165 km of new Metro lines with 12 stations -- seven underground and five elevated -- improving public transportation in the oldest and the most densely-populated areas of the city, which currently lack efficient connectivity, the statement said. Live Events This phase aims to seamlessly integrate the key zones of Old Lucknow, including commercial hubs such as Aminabad, Yahiyaganj, Pandeyganj and Chowk, it said. It will also integrate the other key zones such as the King George's Medical University (Medical College) and major tourist attractions such as Bara Imambara, Chota Imambara, Bhool Bhulaiya, Clock Tower, and Rumi Darwaza, besides the culinary destinations in a city known rich and historic food culture, the statement said. "By bridging these vital areas with the Metro network, Phase-1B will not only enhance connectivity but also stimulate economic activity, tourism, and ease urban mobility for both residents and visitors," it said. The Phase-1B of the project promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth , and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase-1B will play a crucial role in shaping the city's development trajectory and sustainability, the statement said. PTI


Time of India
2 hours ago
- Time of India
Cabinet approves Rs 5,801 crore Phase-1B expansion of Lucknow Metro
The Union Cabinet on Tuesday approved Phase-IB of the Lucknow Metro project with a corridor length of 11.165 km at a cost of Rs 5,801 crore, Railway Minister Ashwini Vaishnaw said. According to the government, on operationalisation of Phase-1B, Lucknow will have 34 km of active Metro rail network. Finance Value and Valuation Masterclass - Batch 4 By CA Himanshu Jain View Program Artificial Intelligence AI For Business Professionals Batch 2 By Ansh Mehra View Program Finance Value and Valuation Masterclass - Batch 3 By CA Himanshu Jain View Program Artificial Intelligence AI For Business Professionals By Vaibhav Sisinity View Program Finance Value and Valuation Masterclass - Batch 2 By CA Himanshu Jain View Program Finance Value and Valuation Masterclass Batch-1 By CA Himanshu Jain View Program The Cabinet meeting was chaired by Prime Minister Narendra Modi. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Play War Thunder now for free War Thunder Play Now Undo In a statement, the government said that Phase-1B of the Lucknow Metro Rail Project represents a significant advancement in the city's infrastructure development , marking a major expansion of the Metro rail network in the state capital. The new corridor will introduce approximately 11.165 km of new Metro lines with 12 stations -- seven underground and five elevated -- improving public transportation in the oldest and the most densely-populated areas of the city, which currently lack efficient connectivity, the statement said. Live Events This phase aims to seamlessly integrate the key zones of Old Lucknow, including commercial hubs such as Aminabad, Yahiyaganj, Pandeyganj and Chowk, it said. It will also integrate the other key zones such as the King George's Medical University (Medical College) and major tourist attractions such as Bara Imambara, Chota Imambara, Bhool Bhulaiya, Clock Tower, and Rumi Darwaza, besides the culinary destinations in a city known rich and historic food culture, the statement said. "By bridging these vital areas with the Metro network, Phase-1B will not only enhance connectivity but also stimulate economic activity, tourism, and ease urban mobility for both residents and visitors," it said. The Phase-1B of the project promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth , and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase-1B will play a crucial role in shaping the city's development trajectory and sustainability, the statement said.