logo
Denison Announces Discovery of Additional High-Grade Mineralization at Gryphon and Reports Results from Successful Delineation Program

Denison Announces Discovery of Additional High-Grade Mineralization at Gryphon and Reports Results from Successful Delineation Program

Cision Canada16-07-2025
TORONTO, July 16, 2025 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX: DML) (NYSE American: DNN) is pleased to announce the discovery of additional high-grade mineralization approximately 40 metres outside of the previously estimated mineralized domain associated with the D1 lens of the Gryphon uranium deposit ("Gryphon"). Drill hole WR-837AD2 intersected 2.3 metres at 1.69 % eU 3 O 8 including 0.5 metres at 5.48 % eU 3 O 8 in the down plunge direction from the previously defined D1 lens. This area remains open down-plunge and along strike to the northeast for further expansion. Gryphon is situated approximately 3 km northwest of the Company's flagship Phoenix In-Situ Recovery ("ISR") uranium mine development project, on Denison's 95%-owned Wheeler River property in northern Saskatchewan (see Figure 1). View PDF version.
View PDF
The discovery was made as part of a highly successful delineation drill program carried out at Gryphon during the first half of 2025. Results from the delineation drilling are expected to add confidence to the previously estimated mineral resources for Gryphon, having confirmed the current geological interpretation of the deposit and intersecting uranium grades in line with expected values.
Denison's President and CEO, David Cates, commented, " Our 2025 Gryphon del ineation program was highly successful and achieved each of the program's key objectives – including (a) increasing the density of drill testing within the A1 high-grade domain and confirming the geological model, (b) collecting additional geotechnical, metallurgical and hydrogeological samples and information to support future project evaluation efforts, and (c) initial testing of areas identified for possible expansion of mineral resources that are outside of the mine design outlined in the 2023 Pre-Feasibility Study ("PFS").
The delineation results demonstrate that Gryphon is an excellent high-grade basement-hosted uranium deposit that justifies further project development evaluation and de-risking. With a focus on confirming the mineralization in the A-series of lenses, a limited number of drill holes were designed to test for possible expansion of the estimated mineral resource. As a result, we are excited that drill hole WR- 837AD2 encountered high-grade mineralization outside of the existing mineralized domain in an area that remains wide open for further expansion down-plunge and along strike. We are currently developing plans to f ollow-up this result and test other expansion targets."
Gryphon Uranium Deposit
Gryphon was discovered by Denison in 2014 and is estimated to contain Indicated Mineral Resources of 61.9 million pounds U 3 O 8 (1,643,000 tonnes an average grade of 1.7% U 3 O 8), plus Indicated Mineral Resources of 1.9 million pounds U 3 O 8 (73,000 tonnes at an average grade of 1.2% U 3 O 8), with an effective date of August 7, 2018.
Gryphon is comprised of 24 primarily basement-hosted stacked lenses referred to as the A-series, B-series, C-series, D-series and E-series lenses, which are interpreted to be stacked to form a zone of mineralization measuring approximately 280 metres long by 113 metres wide, with each lens having variable thicknesses and generally plunging to the northeast and dipping to the southeast (See Figure 2). Four high-grade domains have been established within the A1 and D1 lenses. The A1 high-grade domain represents 40% of the total Indicated Mineral Resources estimated for the deposit; whereas the combination of the three D1 high-grade domains represent approximately 10% of the total Indicated Mineral Resources.
Potential future development of the Gryphon deposit has been assessed as an underground mining operation at a PFS level in 2018 with a cost update completed in 2023. The outcomes of the study highlight robust economics with an estimated after-tax base-case Net Present Value ("NPV") of $864.2 million and internal rate of return ("IRR") of 37.6%, based on estimated Probable Reserves of 49.7 million pounds U 3 O 8 (1,275,000 tonnes at 1.8% U 3 O 8), a uranium selling price of USD$75/lb U 3 O 8 ($101.25/lb U 3 O 8), and an 8% discount rate. Gryphon's cash operating costs are estimated to be USD$12.75/lb U 3 O 8, and its all-in cost of production (including initial capital costs of CAD$737.4 million) is estimated to be US$25.47/lb U 3 O 8. Accordingly, Gryphon has the potential to be competitive with the lowest cost uranium mining operations in the world.
The D series lenses were targeted for potential mineral resource expansion in 2025 given their high-grade, structurally controlled nature, and that previous drilling left the mineralization partially open in the down-plunge and along-strike directions. Prior to this program, no significant expansion drilling has occurred proximal to Gryphon since 2018.
The last drill hole of the 2025 program (WR-837AD2) encountered high-grade uranium mineralization, which is interpreted to expand the extent of the D1 zone by ~40 metres in the down-plunge direction. This drill hole tested a 100-metre gap in the previous drill hole spacing (see Figure 3) and justifies further follow-up drilling to test to additional down-plunge extension as well as the potential for along strike continuation. Drill hole WR-836 was also completed in the expansion area and also encountered notable uranium mineralization, which indicates the system is open along strike to the north.
Denison reports its initial drilling results as radiometric equivalent uranium ("%eU 3 O 8") from a calibrated, triple gamma, down-hole probe. All mineralized intersections have been sampled for chemical U 3 O 8 assay and final results will be compiled following receipt of the data.
Table 1: Drill hole intercepts by lens for WR-836 and WR-83 7AD2. 1
Notes:
1.
Drill hole orientation (azimuth/dip) for WR-836 is 306.8 o /-73.4 o and for WR-837AD2 is 311.1 o /-71.0 o
2.
eU3O8 is radiometric equivalent uranium from a calibrated total gamma down-hole probe. All intersections have been sampled for chemical U3O8 assay
3.
Intersection interval is composited above a cut-off grade of 0.05% eU3O8
4.
Intersection interval is composited above a cut-off grade of 2.0% eU3O8
5.
As most of the drill holes are oriented steeply toward the northwest and the basement mineralization is interpreted to dip moderately to the southeast, the true thickness of the mineralization is expected to be approximately 85% of the intersection lengths
2025 Delineation Drill Program Highlights
A total of ~12,500 metres of diamond drilling was completed in seventeen drill holes and multiple off cuts during the 2025 delineation program at Gryphon. Overall, the delineation program confirmed the current geological interpretation of the deposit and supported the grade-thickness (GT) assumptions in the resource block model.
The A1 lens was the primary focus of the drill program as the high-grade and low-grade domains contain approximately 50% of the estimated Indicated Mineral Resource for Gryphon. Several drill holes intersected the A1 high-grade domain and established additional continuity within the A-series lenses.
The B and C series lenses are located below the A series within the center of the deposit and were also intersected as part of the 2025 delineation program. Together the B and C series lenses account for approximately 20% of the total estimated Indicated Mineral Resources.
Several drill holes encountered significant results, demonstrating the high-grade nature of Gryphon, including the following results from WR-831D1D2, which tested the primary lenses and returned the best mineralized intercepts from the delineation program:
Table 2: Drill hole intercepts by lens for WR-831D1D2. 1
Notes:
1.
Drill hole orientation (azimuth/dip) 295.8 o /-77.0 o
2.
eU 3 O 8 is radiometric equivalent uranium from a calibrated total gamma down-hole probe. All intersections have been sampled for chemical U 3 O 8 assay
3.
Intersection interval is composited above a cut-off grade of 0.05% eU 3 O 8
4.
Intersection interval is composited above a cut-off grade of 2.0% eU 3 O 8
5.
Intersections with less than 0.5 GT were left out of the table to simplify the results
6.
As most of the drill holes are oriented steeply toward the northwest and the basement mineralization is interpreted to dip moderately to the southeast, the true thickness of the mineralization is expected to be approximately 85% of the intersection lengths
Additional Data Collected for Future De-risking and Study Work
Approximately 250 kg of whole-core samples were collected for metallurgical test work. Metallurgical test programs are being developed to assess uranium recoveries to advance the evaluation work completed to support the 2018 and 2023 PFS.
Geotechnical logging was completed on all drill holes and hydrogeological information was collected from two of the drill holes which were outfitted with vibrating wire piezometers (VWPs). The information collected from these exercises is expected to increase the understanding of different hydrogeological zones to support future mine-design planning.
This work adds to the extensive database of geological, hydrogeological, geotechnical, and metallurgical data for Gryphon. This site-specific data is expected to be used to validate certain key assumptions in potential future technical studies further evaluating the Gryphon deposit for underground mining.
About Wheeler River
Wheeler River is the largest undeveloped uranium project in the infrastructure-rich eastern portion of the Athabasca Basin region, in northern Saskatchewan. The project is host to the high-grade Phoenix and Gryphon uranium deposits, discovered by Denison in 2008 and 2014, respectively, and is a joint venture between Denison (90% and operator) and JCU (Canada) Exploration Company Limited ("JCU", 10%). In August 2023, Denison filed a technical report summarizing the results of (i) the feasibility study completed for ISR mining of the high-grade Phoenix uranium deposit and (ii) a cost update to the 2018 Pre-Feasibility Study for conventional underground mining of the basement-hosted Gryphon uranium deposit. More information on the studies is available in the technical report titled "NI 43-101 Technical Report on the Wheeler River Project Athabasca Basin, Saskatchewan, Canada" dated August 8, 2023, with an effective date of June 23, 2023, a copy of which is available on Denison's website and under its profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar.shtml.
Based on the respective studies, both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world. Permitting efforts for the planned Phoenix ISR operation commenced in 2019 and several notable milestones were achieved in 2024 with the submission of federal licensing documents and the acceptance of the final form of the project's Environmental Impact Statement by the Province of Saskatchewan and the Canadian Nuclear Safety Commission.
Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. In addition to Denison's effective 95% interest in its flagship Wheeler River Project, Denison's interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake Joint Venture ("MLJV"), which includes unmined uranium deposits (planned for extraction via the MLJV's SABRE mining method starting in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Joint Venture's Midwest Main and Midwest A deposits, and a 70.55% interest in the Tthe Heldeth Túé ("THT") and Huskie deposits on the Waterbury Lake Property. The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, Denison has direct ownership interests in properties covering ~384,000 hectares in the Athabasca Basin region.
Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited ("JCU"), Denison holds additional interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%), and Christie Lake (JCU, 34.4508%).
In 2024, Denison celebrated its 70th year in uranium mining, exploration, and development, which began in 1954 with Denison's first acquisition of mining claims in the Elliot Lake region of northern Ontario.
Qualified Persons
The technical information contained in this press release has been reviewed and approved by Chad Sorba, P.Geo., Denison's Vice President Technical Services & Project Evaluation, who is a Qualified Persons in accordance with the requirements of NI 43-101.
Cautionary Statement Regarding Forward-Looking Statements
Certain information contained in this news release constitutes 'forward-looking information', within the meaning of the applicable United States and Canadian legislation, concerning the business, operations and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'potential', 'plans', 'expects', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes', or the negatives and/or variations of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will ' ' be taken', 'occur' or 'be achieved'.
In particular, this news release contains forward-looking information pertaining to the following: scope, objectives and interpreted results of the Gryphon delineation program; future plans, including potential future exploration potential and metallurgical test programs; and expectations regarding its joint venture ownership interests and the continuity of its agreements with its partners and third parties. Statements relating to 'mineral reserves' or 'mineral resources' are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, the modelling and assumptions upon which the plans for Wheeler River are based may not be maintained after further work is completed. In addition, Denison may decide or otherwise be required to discontinue testing, evaluation and other work if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.). Denison believes that the expectations reflected in this forward-looking information are reasonable but no assurance can be given that these expectations will prove to be accurate and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed in Denison's Annual Information Form dated March 2 8, 2025 or subsequent quarterly financial reports under the heading 'Risk Factors'. These factors are not, and should not be construed as being exhaustive.
Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this news release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this news release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this news release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation
SOURCE Denison Mines Corp.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

First and Goal Capital Corp. Enters into Binding Letter of Intent for Qualifying Transaction on Arizona Copper Project
First and Goal Capital Corp. Enters into Binding Letter of Intent for Qualifying Transaction on Arizona Copper Project

Cision Canada

time8 minutes ago

  • Cision Canada

First and Goal Capital Corp. Enters into Binding Letter of Intent for Qualifying Transaction on Arizona Copper Project

TORONTO, July 30, 2025 /CNW/ - First and Goal Capital Corp. (TSXV: FGCC.P) (" F&G" or the " Company") and Copper Bullet Mines Inc. (" CBMI") are pleased to announce that they have entered into a binding letter of intent dated July 28, 2025 (the " LOI"), pursuant to which F&G and CBMI intend to complete a business combination or other similarly structured transaction which will constitute a reverse take-over of F&G (the " Transaction"). It is intended that the Transaction will be an arm's length "Qualifying Transaction" for F&G, as such term is defined in Policy 2.4 of the Corporate Finance Manual of the TSX Venture Exchange (the " TSXV"). Upon consummation of the definitive agreement (the " Definitive Agreement"), a comprehensive news release will be issued setting out the terms of the Transaction and the proposed Financings (as hereinafter defined) of CBMI in connection with the Transaction. FINANCINGS Under the terms of the LOI, CBMI will complete a bridge financing by way of private placement for gross proceeds of $500,000 through the issuance of securities of CBMI (the " Bridge Financing"). The Bridge Financing is anticipated to close in part or in full on or about August 15, 2025. Pursuant to the LOI, CBMI will also complete a private placement financing for additional proceeds of $1,000,000 through the issuance of securities of CBMI (the " Concurrent Financing" and together with the Bridge Financing, the " Financings"), or such other amount as required by the TSXV in accordance with the policies of the TSXV. The Concurrent Financing is anticipated to be completed prior to or concurrent with closing of the Transaction. On closing of the Transaction, assuming completion of the foregoing Financings, the Equity Value (also the Enterprise Value) of the resulting entity is expected to be between CAD $10.5M and $11.5M. Trading in the shares of F&G has been halted in accordance with the policies of the TSXV and will remain halted until such time as all required documentation in connection with the Transaction has been filed with and accepted by, and permission to resume trading has been obtained from, the TSXV. ABOUT COPPER BULLET MINES INC. CBMI is advancing a prolific copper project in the Arizona Copper Triangle. Since its incorporation on April 10, 2021, CBMI has acquired, through staking and option, a significant land package in the heart of Arizona's Copper Triangle. CBMI's Copper Springs Property (the " Property") has more than 96 historic drills holes and a non-43-101 compliant mineral resource of 47 million tonnes grading 0.4% copper (NI 43-101 Technical Report Copper Springs Property, Gila County, Arizona, by M. Feinstein, 2022), equating to over 400 million lbs of copper contained*. This historic resource is one of many exploration targets across the Property and represents approximately 10% of the Historic Supergene Oxide Blanket (HSOB) footprint, which was defined by wide spaced drilling in the 1960s. The historical resource estimate is comparable to a modern inferred mineral resource, however quality assurance and quality control protocols do not meet current industry standards. The QP finds the historic resource to be reliable and relevant based upon: field observations, multiple post-resource exploration campaigns, review of the 2009 core, and thorough data compilation and analysis. Please refer to Copper Bullet's NI 43-101 technical report that can be found on its website: Please also refer to the historical reports found on Copper Bullet's website: * Please note, any reference to historical estimates and resources should not be relied upon. These historical estimates are not current and a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") has not done sufficient work to classify the historical estimate and CBMI is not treating the historical estimate as a current resource estimate. Copper Bullet's 2022 NI 43-101 technical report outlines a phased exploration program of surface sampling, geophysics, and drilling, which is designed to modernize the non-compliant historic resources, as well as potentially upgrading and expanding the mineralized area. The Property is adjacent to Arizona State highway 60, located 1 hour east of Phoenix. High voltage power lines cross the Property and water is available from perennial springs. The Property is surrounded by producing mines, including Capstone's Pinto Valley, KGHM's Carlotta mine, Group Mexico's Ray Mine, and various other mines and projects owned by South 32, BHP, Rio Tinto and Freeport-McMoRan. The Globe-Miami, Arizona area, where the Property is situated, has produced over 37 billion lbs of copper. A recent report published by the Arizona Geological Study suggests unmined resources to be over 94 billion lbs of copper (Geology and History of the Globe-Miami Region, Gila and Pinal County, Arizona. Briggs, 2022). The Copper Triangle is also home to 2 of the 3 copper smelters in the USA. From exploration through discovery, development, capital raising, and successful execution of commercial mining and milling operations, CBMI's team includes a full-range of experienced industry professionals. Additional information about CBMI may be found on its website: FIRST AND GOAL CAPITAL CORP. F&G was incorporated under the Business Corporations Act (Ontario) on incorporated on June 3, 2021, and is a Capital Pool Company (as defined in the policies of the TSXV) listed on the TSXV. F&G has no commercial operations and no assets other than cash. QUALIFIED PERSON Michael N. Feinstein, PhD, CPG, is the "Qualified Person" under National Instrument 43-101- Standards of Disclosure for Mineral Projects, and he has reviewed and approved the scientific and technical disclosure contained in this press release. Dr. Feinstein is a Consultant to Copper Bullet Mines, he is the author of Copper Bullet's NI 43-101 technical report dated January 20, 2022. Cautionary Note Regarding Forward Looking Information This press release contains statements that constitute "forward-looking information" ("f orward-looking information") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking information and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information. In disclosing the forward-looking information contained in this press release, the Company has made certain assumptions, including that: all applicable shareholders, and regulatory approvals for the Transaction will be received. Although the Company believes that the expectations reflected in such forward-looking information are reasonable, it can give no assurance that the expectations of any forward-looking information will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information. Such factors include but are not limited to: the availability of financing; delay or failure to receive board, shareholder or regulatory approvals; and general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking information contained in this press release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking information to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward-looking information or otherwise. Paul G. Smith, the CEO of First and Goal Capital Corp. and Dan Weir, the CEO of Copper Bullet Mines Inc. are responsible for this announcement. Not for distribution to United States newswire services or for dissemination in the United States. This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the " U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available. All information provided in this press release relating to CBMI, including any information about its property and the surrounding area and information on its website, has been provided by management of CBMI and has not been independently verified by management of the Company. As the date of this press release, the Company has not entered into a Definitive Agreement with CBMI in connection with the Transaction, and readers are cautioned that there can be no assurances that a Definitive Agreement will be executed. Completion of the Transaction is subject to a number of conditions, including but not limited to, TSXV acceptance and if applicable pursuant to TSXV requirements, majority of the minority shareholder approval. Where applicable, the Transaction cannot close until the required shareholder approval is obtained. There can be no assurance that the Transaction will be completed as proposed or at all. Investors are cautioned that, except as disclosed in the management information circular or filing statement to be prepared in connection with the Transaction, any information released or received with respect to the Transaction may not be accurate or complete and should not be relied upon. Trading in the securities of a capital pool company should be considered highly speculative. Neither TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release. SOURCE First & Goal Capital Corp.

@ the Bell: Steady rates, shaky trade
@ the Bell: Steady rates, shaky trade

The Market Online

time29 minutes ago

  • The Market Online

@ the Bell: Steady rates, shaky trade

Canada's top stock index tumbled on Wednesday after the Bank of Canada decided to maintain its interest rate at 2.75 per cent for the third straight time. This move suggests that the Canadian economy has been less affected by the ongoing trade tensions with the United States than previously anticipated. The utilities segment provided meagre gains for what was an otherwise broad decline for the TSX. Meanwhile, US markets were as divided as the citizens of the country as investors reviewed corporate earnings and considered the Federal Reserve's latest interest rate decision. The Fed opted to keep its benchmark rate steady within the 4.25 per cent to 4.5 per cent range, amid growing uncertainty surrounding trade negotiations between the US and China. The Canadian dollar traded for 72.24 cents US compared to 72.57 cents US on Tuesday. US crude futures traded US$1.16 higher at US$70.37 a barrel, and the Brent contract rose US$1.01 to US$73.52 a barrel. The price of gold was down US$53.72 to US$3,273.52. In world markets, the Nikkei was down 19.85 points to ¥40,654.70, the Hang Seng was down 347.52 points to HK$25,176.93, the FTSE was down 0.62of a point to ₤9,136.94, and the DAX was up 44.85 points to €24,262.22. Stockhouse does not provide investment advice or recommendations. All investment decisions should be made based on your own research and consultation with a registered investment professional. The issuer is solely responsible for the accuracy of the information contained herein. For full disclaimer information, please click here .

CPKC reports higher earnings, revenues for second quarter
CPKC reports higher earnings, revenues for second quarter

Winnipeg Free Press

time38 minutes ago

  • Winnipeg Free Press

CPKC reports higher earnings, revenues for second quarter

CALGARY – Canadian Pacific Kansas City has reported an increase in profits and revenues during the second quarter. The continent-spanning railroad, headquartered in Calgary, posted net income of $1.23 billion for the three months ended June 30, up from $903 million during the same period a year earlier. Diluted earnings per share came in at $1.33, an increase from 97 cents. Revenues were $3.7 billion for the period versus $3.6 billion in the second quarter of 2024. CPKC's operating ratio — a key metric watched by investors, where a lower number is better — decreased to 63.7 per cent from 64.8 per cent a year earlier. The railroad is maintaining its most recent forecast of adjusted diluted earnings per share growth of 10 to 14 per cent in 2025, which was lowered in April from an earlier prediction of 12 to 18 per cent growth. Monday Mornings The latest local business news and a lookahead to the coming week. This report by The Canadian Press was first published July 30, 2025. Companies in this story: (TSX: CP)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store