
Lyari Expressway-II
The technology reduces processing time, minimizes human error, improves revenue collection accuracy, and provides valuable traffic data for infrastructure planning. International best practices further support digital transformation. Electronic toll collection systems worldwide have demonstrated reduced operational costs, improved traffic flow, and enhanced user satisfaction.
Countries with similar economic profiles have successfully implemented such systems, suggesting that technological barriers are minimal. The business case for digital implementation becomes even stronger when considering revenue optimization.
Automated systems reduce collection costs, minimize revenue leakage, and provide real-time financial monitoring capabilities that manual systems cannot match. Infrastructure maintenance challenges: While toll increases may be justified by rising maintenance costs, current service delivery raises questions about resource allocation effectiveness.
Lyari Expressway-I
Commuters report persistent issues with road cleaning, street lighting, and safety infrastructure maintenance. Most critically, safety barriers along elevated sections have been compromised, creating potential liability issues for the authority.
The expressway's elevated bridge design requires particular attention to safety protocols. Missing or damaged barriers pose significant risks, especially given the 50-100 feet height differential above water channels. Addressing these safety concerns should be integral to any toll adjustment strategy.
From a business continuity perspective, reliable infrastructure reduces transportation risks and associated insurance costs. Companies operating vehicle fleets particularly benefit from well-maintained highways with proper safety features.
Farooq Mustafa Chaudhry
Karachi
Copyright Business Recorder, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
4 days ago
- Business Recorder
NA panel forms body to address Rs19bn default by LDI operators
ISLAMABAD: The National Assembly Standing Committee on Information Technology and Telecommunication on Monday constituted a sub-committee to address the alarming default of around Rs19 billion by nine Long Distance and International (LDI) operators. The Pakistan Telecommunication Authority (PTA) informed the committee that more than 100 related cases are pending in various courts, while six of the defaulters have expressed willingness to settle their dues. A structured recovery mechanism, including an instalment-based plan, is under consideration and a proposal has already been submitted to the federal cabinet for guidance. The committee, chaired by MNA Syed Aminul Haq, also decided to convene an in-camera meeting to thoroughly review the confidential Sale and Purchase Agreement between the Government of Pakistan and M/s Etisalat, after expressing strong displeasure over PTCL's refusal to share specific clauses of the deal. The Privatization Commission informed the committee that Clause 6 of the agreement restricts disclosure without mutual consent of both parties. The committee directed that representatives from the Ministry of IT, Ministry of Law and Justice, Privatization Commission, and M/s Etisalat be invited to the next meeting. Meanwhile, the Universal Service Fund (USF) briefed the committee that areas in district Tharparkar and Sargodha Division remain severely underserved in terms of internet and voice call access. Although fibre optic infrastructure exists, telecom services remain unavailable in many parts. The USF stated that specific projects for these regions have been approved and are at the final implementation stage. The committee instructed USF to submit a list of all such projects planned for execution over the next three to five years and directed PTA to ensure service delivery in those areas. On the issue of internet suspension in district Panjgur, the committee urged the Ministry of IT to coordinate with the Ministry of Interior, provincial authorities, and law enforcement agencies to devise a workable solution. The PTA was also instructed to maintain connectivity through the existing fibre optic infrastructure despite service disruptions. MNAs Zulfiqar Ali Bhatti, Dr Mahesh Kumar Malani, Sadiq Ali Memon, Ahmad Saleem Siddiqui, Pullain Baloch, Sher Ali Arbab, and Umair Khan Niazi, along with senior officials from the ministry and its attached departments, attended the meeting. Copyright Business Recorder, 2025


Business Recorder
6 days ago
- Business Recorder
Balancing the books and the battlefield: Pakistan's fiscal strategy for FY2025-26
While public spending contracts, the Public Sector Development Programme (PSDP) remains protected approaching Rs 1.15 trillion through targeted public-private partnerships. Of this, Rs 253 billion is allocated to energy infrastructure, Rs 79 billion to transport and highways, and Rs 206 billion to vital water conservation and irrigation initiatives. Mega-hydropower projects like Dasu, Mohmand, Tarbela-V, and Suki Kinari are prioritized, alongside upgrades to the national transmission grid. These investments aim to reduce circular debt, enhance industrial productivity, and fortify Pakistan's resilience against climate-related shocks, an increasingly pressing national concern. A 5 billion rupees 'Kisan Package,' along with duty waivers on seeds and tax concessions for farm equipment, is expected to stimulate a 4.5 percent growth in agriculture. The support comes at a critical time as Pakistan faces recurring challenges of food inflation and climate-induced crop disruptions. Education receives over Rs 100 billion, with focused investments in federal universities, vocational training, and digital literacy. Meanwhile, healthcare spending approaches Rs 80 billion, earmarked for maternal and child health, expanded immunization programs, and construction of new hospitals in Islamabad and underserved region. Balancing the books and the battlefield: Pakistan's fiscal strategy for FY2025–26—I Civil servants are granted a 7.5–10 percent salary increase, while pension reforms shift towards a contributory model—an essential measure to contain the growing fiscal burden exceeding Rs 1 trillion annually. The salaried class—long burdened by inflation and stagnant wage growth—receives modest but meaningful relief in this year's budget. The government has revised tax slabs for salaried individuals, marginally increasing the income threshold for taxation to reflect inflationary pressures. While the relief may not be transformational, it offers breathing space to middle-income earners who have borne the brunt of indirect taxes and fuel hikes in recent years. Moreover, the budget refrains from imposing any new taxes on salaried income brackets, providing a measure of stability amidst broader tax reforms aimed at widening the net and reducing leakages in the informal sector. Muhammad Sheroz Khan Lodhi, Karachi Copyright Business Recorder, 2025


Business Recorder
7 days ago
- Business Recorder
Gwadar port: security threats among hurdles to functioning
ISLAMABAD: The Senate Standing Committee on Planning, Development and Special Initiatives was informed that security threats and lack of connectivity are the main hurdles in the fast development and functioning of Gwadar Port. The committee met with Senator Quratulain Marri in the chair at the Parliament house on Friday. The committee discussed issues related to ports of Pakistan, status of approval of un-approved schemes in the PSDP-25-26 and Sukkur-Hyderabad-Karachi Motorway (M-6). When committee Chairperson Quratulain Marri asked about proper function of Gwadar Port, responding to the question, the Planning Ministry cited persistent security threats as the primary reason for Gwadar Port's limited progress. The additional secretary of Ministry of Maritime Affairs admitted that security and connectivity are main issues for development and function of Gwadar Port. He said that that the Chinese engineers and workers want complete security in and out of Gwadar Port. He said that we are providing VIP security to Chinese engineers and workers. The committee also received a joint briefing by the ministries of Planning and Maritime Affairs on port charges. It was revealed that charges at Gwadar Port exceed those of regional ports such as Jebel Ali in Dubai, and no incentives are currently provided to shipping lines. The Maritime Affairs Ministry proposed a phased approach to operationalise Gwadar Port, beginning with a transit trade model. Another reason was identified as the lack of private sector interest in the port. Officials further confirmed that port charges in Pakistan are generally higher than those in the region. It was noted that current rates at Karachi Port Trust (KPT) are lower than those in 1994. He said that wet charges comprise only five per cent of total charges. Connectivity challenges were also discussed, particularly the delay faced by trucks accessing the Super Highway from KPT, which can take up to 24 hours, significantly impacting logistics and costs. The committee was informed that work on an elevated Lyari Expressway is in progress to directly link the port. The KPT-Pipri railway track project was also highlighted, although it requires additional attention and funding. Chairperson Marri acknowledged the efforts of the Ministry of Maritime Affairs and recommended the construction of a dedicated and shorter route between KPT and the Super Highway to improve connectivity and reduce transport time. The Additional Secretary of Planning Ministry during the briefing told the committee that in June, 2025, five CDWP meeting were held in which 31 projects were considered, wherein 27 projects were approved and seven projects were recommended to Ecnec and one project was deferred. He said that CDWP approved 27 development projects of total cost of 77.78 billion and seven projects of 481.96 billion to ECNEC. Senator Quratulain Marri emphasised the inefficiency of executing development projects in fragmented phases, urging that projects be completed in a single execution cycle based on priority needs. She underscored the strategic significance of the N-5 and called for its immediate commencement. Expressing concern over two operational toll plazas between Matiari and Hyderabad, she directed officials to investigate the matter and submit a report. Copyright Business Recorder, 2025