logo
Mitsubishi Power completes GTCC power station at Alba plant

Mitsubishi Power completes GTCC power station at Alba plant

Trade Arabia19-02-2025
Mitsubishi Power, a power solutions brand of Japanese group Mitsubishi Heavy Industries (MHI), today (February 19) announced the successful completion of the Power Station 5 Block 4 gas turbine combined cycle (GTCC) power plant at Aluminium Bahrain (Alba).
This plant is powered by Mitsubishi Power's state-of-the-art, hydrogen-ready M701JAC gas turbine and steam turbine.
The high-efficiency power plant was developed by a Mitsubishi Power consortium with SepcoIII to expand Alba's captive power generation capacity in line with its growth and sustainability objectives, and to help accelerate the sustainable economic development of Bahrain, said the Japanese group in a statement.
With a combined cycle output of 680.9 MW, the Mitsubishi Power M701JAC gas turbine represents the first deployment of this advanced JAC technology in a Middle Eastern aluminium smelter, contributing to Alba's decarbonization goals while ensuring energy security for its operations.
The announcement was made during a ceremony held at Alba's Power Station 5 site attended by high-level officials from Alba including the Chairman of the Board Khalid Al Rumaihi, Chief Executive Officer Ali Al Baqali, Chief Power Officer Amin Sultan, and Alba's Executive Management Team and a senior delegation from Mitsubishi Power led by Takashi Tozawa, Vice President, Energy Systems at MHI and Khalid Salem, President, Middle East and North Africa, Mitsubishi Power.
Senior officials from SepcoIII were also present including its Vice President, Kong Lingfen.
Mitsubishi Power was able to complete the contract a month ahead of schedule and this new milestone marks the successful execution of the project, reinforcing its track record in the delivery of high-efficiency and reliable power solutions for energy-intensive industries.
On the project completion, Tozawa said: "We are honored to celebrate this landmark project which introduced Mitsubishi Power's state-of-the-art power generation technology to the Mena region and we are proud to mark the completion of this significant milestone for our partner Alba."
"The successful start of commercial operation at the Power Station 5 Block 4 project with our world-leading, hydrogen-ready M701JAC Gas Turbine is a testament to our dedication to support our customers meet their energy goals as well as to decarbonizing heavy industry," he stated.
"This milestone not only underscores our strong collaboration but also plays a pivotal role in advancing Bahrain's Economic Vision 2030 and building a sustainable energy future for the Kingdom," he added.
Al Rumaihi said: "Power Station 5 Block 4 isn't just an expansion of our power capacity, it's a testament for Alba's vision for a sustainable future, and a powerful symbol of what is possible when innovation and partnership converge."
"This Project, delivered ahead of schedule thanks to the dedication of our teams and partners like Mitsubishi Power and SepcoIII, propels us forward on our journey to a greener Bahrain, demonstrating that industrial growth and environmental stewardship can go hand in hand," he added.
As part of the agreement, Mitsubishi Power will continue supporting Alba through a Long-Term Service Agreement (LTSA), ensuring high availability, reliability, and performance of the gas turbine.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Toyota Q1 Net Profit Plunges 37% After Trump Tariff Hit
Toyota Q1 Net Profit Plunges 37% After Trump Tariff Hit

Gulf Insider

time4 days ago

  • Gulf Insider

Toyota Q1 Net Profit Plunges 37% After Trump Tariff Hit

Toyota Motor expects a 1.4 trillion yen ($9.5 billion) hit to operating profit for the fiscal year ending March 2026 due to higher U.S. import tariffs, according to Nikkei Asia. The automaker revised its net profit forecast downward by 14% to 2.6 trillion yen, citing the new 25% duty imposed on Japanese car imports in April by U.S. President Donald Trump. Previously, Toyota had only factored in the impact of tariffs for April and May—estimated at 180 billion yen. The company's net profit for the April–June quarter fell 36.9% year-on-year to ¥841 billion, reflecting both the stronger yen and the increased U.S. tariff rate. 'The [U.S. tariff] has risen to 15% from the previous 2.5%, which obviously has a significant impact,' said Takanori Azuma, Toyota's chief accounting officer. 'And it is a thing we are not able to control. The major challenge is to ensure that our North America business generates solid profits. The result [of a trade deal] remains tough.' Azuma added that Toyota is exploring countermeasures. 'If there is excess production capacity in the U.S., we will make use of it. … We want to refine our operations by considering every possible scenario.' Click here to read more Also read: Kremlin Confirms Trump-Putin Meeting 'In Coming Days', Possibly In UAE

Alba Discloses Financial Results for the Second Quarter and H1 of 2025
Alba Discloses Financial Results for the Second Quarter and H1 of 2025

Daily Tribune

time6 days ago

  • Daily Tribune

Alba Discloses Financial Results for the Second Quarter and H1 of 2025

Aluminium Bahrain B.S.C. (Alba) (Ticker Code: ALBH), the world's largest aluminium smelter on one site, has reported a Profit of BD24.6 million (US$65.3 million) for the second quarter of 2025, down by 64% Year-overYear (YoY), versus a Profit of BD68.5 million (US$182.2 million) for the same period in 2024. The Company reported Basic and Diluted Earnings per Share of fils 17 for Q2 2025 versus Basic and Diluted Earnings per Share of fils 48 in Q2 2024. The Total Comprehensive Income for Q2 2025 stood at BD21.9 million (US$58.1 million) versus Total Comprehensive Income for the second quarter of 2024 of BD66.7 million (US$177.4 million) – down by 67% YoY. Gross Profit for Q2 2025 was BD47 million (US$125.1 million) versus BD102 million (US$271.2 million) for the same period in 2024 – down by 54% YoY. As for Revenue from contracts with customers in Q2 2025, Alba generated BD434 million (US$1,154.4 million) versus BD407 million (US$1,082.3 million) in Q2 2024 - up by 7% YoY. First Half For the First Half of 2025, Alba has reported a Profit of BD42.7 million (US$113.5 million), down by 54% YoY versus a Profit of BD93 million (US$247.3 million) for the same period in 2024. The Company reported Basic and Diluted Earnings per Share of fils 30 for H1 2025 versus Basic and Diluted Earnings per Share of fils 66 for the same period in 2024. Alba's Total Comprehensive Income for H1 2025 was BD38.7 million (US$102.8 million), down by 59% YoY, compared to a Total Comprehensive Income of BD94.4 million (US$251 million) in H1 2024. Gross Profit for the First Half of 2025 was BD97.8 million (US$260.2 million) versus BD159.2 million (US$423.5 million) in H1 2024 – down by 39% YoY. Alba generated in H1 2025 Revenue from contracts with customers of BD843 million (US$2,242 million) versus BD741.5 million (US$1,972.1 million) in H1 2024 - up by 14% YoY. Total Equity as of 30 June 2025 stood at BD1,924.4 million (US$5,118.2 million), up by 0.03%, versus BD1,923.9 million (US$5,116.9 million) as of 31 December 2024. Alba's Total Assets as of 30 June 2025 were BD2,657.9 million (US$7,069 million) versus BD2,673.4 million (US$7,110 million) as of 31 December 2024 – down by 0.6%. Interim Dividend The Board of Directors of Aluminium Bahrain B.S.C. (Alba) resolved during the Board e-meeting on Tuesday 05 August 2025, to recommend the distribution of Interim Dividend as at 30 June 2025 to the shareholders whose names are registered on the Company's register on the Record Date. The cash interim dividend is 10.55% of the share nominal value, equivalent to Fils 10.55 per share amounting to BD14,932,765 ( million). Resilient and focused Commenting on the Company's performance for the second quarter of 2025, the Chairman of Alba's Board of Directors, Khalid Al Rumaihi stated: 'Amidst global market headwinds, Alba stands resilient and focused. While our profitability has been tempered by external pressures, the continued growth in revenue and the remarkable rise in Value Added Sales to 76% reflect the strength of our vision and the agility of our profitability gap compared to Q2 2024 is largely attributed to higher landed alumina prices in this period; without that distortion, our performance would've exceeded last year's.' Safety first Alba's Chief Executive Officer, Ali Al Baqali, added: 'Behind every number is the unwavering dedication of our people. In the face of market challenges, Alba has delivered good results driven by a culture that puts safety first and empowers excellence. Achieving 38 million safe working hours without LTI is a testament to this commitment. We are proud of our workforce and confident in our ability to navigate the road ahead, together and safely.' Alba Management will hold a conference call today at 12:30 PM Bahrain Time to discuss the Company's financial and operational performance for Q2 2025 and outline

Jeddah Tower: Everything You Need to Know
Jeddah Tower: Everything You Need to Know

Gulf Insider

time7 days ago

  • Gulf Insider

Jeddah Tower: Everything You Need to Know

What do Philadelphia City Hall, the Empire State Building, and the Burj Khalifa have in common? They've all held the title of the world's tallest skyscraper. And eventually Jeddah Tower, a neo-futuristic skyscraper planned in Saudi Arabia, will join the ranks among these iconic structures. Designed by Adrian Smith and Gordon Gill of Adrian Smith + Gordon Gill Architecture, the structure will stand at 3,281 feet tall when completed in the next four to five years, nearly 11 times the height of the Statue of Liberty. 'The design for Jeddah Tower is rooted in the symbolism of Saudi Arabia while looking toward the future by being technologically expressive,' explain Smith and Gill in a joint statement to AD . 'Its slender, subtly asymmetrical massing evokes the new growth of palm fronds shooting upward from the land—a symbol of new life heralding future growth for the kingdom.' Here, AD covers everything you need to know about the future world-record holder. A rendering of Jeddah Tower shows what the supertall will look like when complete. Photo: Courtesy of Adrian Smith + Gordon Gill Architecture. Jeddah Tower will be located in the city from which it gets its name, Jeddah, Saudi Arabia. A port area, the city borders the Red Sea and is the second-most populated in the Middle Eastern country. When complete, the skyscraper will join other architectural marvels in Jeddah, such as the Penang Floating Mosque and Al Balad, the town's historic center featuring homes from coral. The design is based on palm fronds, seen here. The building is designed in a neo-futuristic style, an avant-garde aesthetic often underpinned by the use of world-class technology and a rethinking of both the form and function of developments. Renderings show a singular, slender tower, which subtly tapers towards its apex. As Smith and Gill explain, the shape is inspired by new palm fronds, which are abundant in Saudi Arabia. Though the design is meant to honor its Saudi Arabian origins, it also represent the pinnacle of supertall design and the technological evolution that has allowed such monumental design to become a reality. 'The geometry of the tower, starting at the base as a single tripod form then gradually separating at the spire, is tied to the wind performance characteristics of the tower—an analogy of new growth fused with technology,' the pair add. Jeddah Tower's construction started back in 2013 but was paused in 2018. Its contractor, the Binladin Group, was taken off the project following the the 2017–2019 Saudi Arabian purge when its president, Bakr bin Laden, half-brother to Osama bin Laden, was arrested. The COVID-19 pandemic resulted in further delays; though in September 2023 Dezeen reported that construction had restarted. Jeddah Tower, formerly known as Kingdom Tower, under construction in 2018. 'Jeddah Tower construction has restarted…the tower is expected to be completed within four to five years,' the Jeddah Economic Company (JEC), the developer, confirms in a statement to AD . Before it was halted, builders had finished about a third of the building. As of January 2025, 60 floors of the total 157 floors have been built, totaling over 40% of the final build. When completed, the tower will stand at around 3,281 feet, or one kilometer. It will be about 564 feet taller than the Burj Khalifa in Dubai, designed by Smith while he was working at Skidmore, Owings & Merrill, which currently holds the record for the world's tallest skyscraper. See the 15 Tallest Buildings in the World Reaching high into the sky, these marvels of engineering and design will fascinate more than just the architecture lover The Kingdom Tower of Jeddah Economic City, no less grand than its nickname suggests, has not yet claimed its title of the world's tallest building due to a number of financial and political setbacks. The 2017 Saudi Arabian anticorruption purge resulted in key backers of the project, including the Saudi Binladin Group's chair Bakr bin Laden, being detained. As the original main contractor, responsible for 33% ownership of the supertall tower, the reputational issues of the Saudi Binladin Group spurred contract restructuring and re-tenders. Additionally, the pandemic further disrupted supply chains and labor, slowing overall progress of the construction of the Jeddah Tower. Similar to the Burj Khalifa, Jeddah Tower is expected to be a mixed-use building, offering both residential, commercial, and office space. There will also be an observation deck (currently planned to be the world's tallest), a Four Seasons hotel, and a 98-foot-diameter outdoor balcony, which was originally designed as a helipad. In the aftermath of delays and financial troubles, the record-breaking tower is now expected to be completed around 2028, based on recent plans. As of June of 2025, 70 floors have been completed. While reaching these new heights is certainly daunting, the structural challenges are a comparatively lesser concern: Construction Week spoke to Bob Sinn, principal engineer at Thornton Tomasetti (the structural engineering firm for Jeddah Tower), who explained that '[at] extreme heights, the main challenges are along practical and architectural lines, not material or structural.'Also read: ZATCA Foils Attempt To Smuggle 310,000 Captagon Pills Through Jeddah Port Source Architectural Digest

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store