logo
Olympic-size swimming pool to come up in Chandigarh

Olympic-size swimming pool to come up in Chandigarh

Hindustan Times3 days ago
UT administration has floated tenders for the construction of an international-level multipurpose hall, an Olympic-standard swimming pool and a girls hostel. Tenders for the construction of an international-level multipurpose hall, an Olympic-standard swimming pool and a girls hostel has been floated by the Chandigarh administration. (HT representative)
The information was shared during first meeting of the newly constituted standing committee of the administrator's advisory council on sports, Chandigarh, at the Sports Complex, Sector 42, under the chairmanship of Sanjay Tandon on Monday.
The tenders, floated by the engineering department, will be opened on August 18.
The committee further was informed that the tender to convert the Sector 39 swimming pool into an all-weather facility has been allotted, with completion targeted for October 31.
Upgrade works are also in progress at the Basketball Hall in Sector 42, the hockey stadiums in Sectors 42 and 18, and the sports infrastructure at Lake Sports Complex, with the aim of meeting national standards and enabling the city to host more national-level competitions.
An online portal for cash awards to sportspersons has been developed and will be launched on National Sports Day, August 29. A dedicated sports policy for specially abled sportspersons has been prepared and will be rolled out shortly.
Committee members recommended that sports associations be allowed to display sponsor branding free of cost within sports complexes to facilitate the organisation of national and international events, noting that most associations rely heavily on sponsorships. The joint director sports informed that a policy on this is under active consideration and will be finalised soon. He also stated that work is underway on a policy to provide Group 'A' and Group 'B' government jobs to meritorious sportspersons.
The committee also commended the newly renovated conference hall at the sports complex, where the meeting was held. The chairman suggested that sports associations be allowed to book the facility for meetings at nominal charges fixed by the department.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

HT Archive: Despite big economic gains, many gaps remain
HT Archive: Despite big economic gains, many gaps remain

Hindustan Times

time13 minutes ago

  • Hindustan Times

HT Archive: Despite big economic gains, many gaps remain

In a memorable speech delivered to the Constituent Assembly on the eve of Independence on August 14, 1947, Pandit Jawaharlal Nehru outlined the country's basic, social and economic objectives as follows: The future is not one of case or resting but of incessant striving so that we may fulfil the pledges we have so often taken and the one we shall take today. The service of India means the service of the millions who suffer. It means the ending of poverty and ignorance and disease and inequality of opportunity. Jawaharlal Nehru during the flag hoisting ceremony at Red Fort, Delhi (HT Photo) The ambition of the greatest man of our generation has been to wipe every tear from every eye. That may be beyond us, but as long as there are tears and suffering, so long our task will not be over. We must recognise that the task is far from being over. Our country has made impressive all-round progress since Independence. We can take legitimate pride in the fact that this progress has been sustained in the framework of a democratic polity and an open society deeply committed to fundamental human freedoms and the rule of law. Our economic structure has been considerably diversified. We have now a vast reservoir of scientific, technological and managerial skills. There has been a significant improvement in the nation's educational and health status as measured by school enrolment, literacy rate and life expectancy at birth. Nevertheless, we have to face the reality that the overall pace of social and economic development has fallen short of the aspirations of our people and the objective potential of our economy. Our long-term rate of economic growth compares unfavourably with China as well as many other countries of East and South East Asia. The employment opportunities have not grown fast enough to absorb both the new entrants to our growing labour force and the backlog of previous unemployment. As a result, there is an increasing feeling of unrest and even of alienation among a section of our youth. The overall pace and pattern of industrial growth has not led to a significant reduction in the proportion of people dependent on agriculture for their livelihood. Since agriculture's share in our national income has fallen from nearly 50% in the early fifties to less than 34% in the late eighties, the income gap between rural and urban India is now much wider than at the time of Independence. Extreme poverty and affluence walk side by side. The growing degradation of India's land and water resources now threatens the livelihood of millions of small and marginal farmers who live on the edge of subsistence. For many of them life remains marginal at best. Self-reliance has been a basic objective of planning in India since the early 1960s. Yet until recently, the country had to face a chronic shortage of foreign exchange. Our exports in the 1980s financed only about 60% of our imports and the country has had to depend heavily on such artificial props as concessional aid equal to 2-3% of our national income year after year. India was probably the first developing country to launch an official family planning programme. However, its impact on the rate of growth of population has been rather modest. These harsh realities are now well known. And it was this recognition which led to a considerable amount of rethinking in the 1980s about our basic economic strategies. The grave economic crisis of 1991-92 accelerated this process of rethinking and far-reaching changes have been made in our economic policies during the last six years so as to align them with contemporary realities. Despite many controversies associated with these changes, it is now generally recognised that the initial results on the whole have been very positive. The country was able to overcome the crisis of 1991-92 with the least possible damage to the underlying rhythm of the growth process and without any major social upheavals as witnessed elsewhere in the developing world. Indeed, a basis has been laid for a sustained improvement in the country's development prospects. However, that task is still unfinished. Fortunately, six years of intense national debate and the actual performance of the economy since the introduction of reforms in 1991-92 have now produced a broad national consensus about the basic design of our economic policies. It is now agreed that the fiscal systems both at the Centre and the States need major restructuring. But there must also be an explicit recognition that an effective agenda of economic reforms can succeed only if backed up by credible political reforms to modernise the apparatus of the Indian State at all levels. India needs a significant set up in savings and investment rates, and in particular in the rate of public savings, if it aspires to compete with East Asia and South East Asia in the race for economic development. Yet, the pressures of competitive populism are now so strong that very few politicians have the courage to cut subsidies, to curb wasteful spending or to adopt credible measures to deal with the chronic sickness and low productivity of a large number of public enterprises both at the Centre and the states. There is unwillingness to face the harsh reality that if tax cuts (essential though they may be in some cases) and rising subsidies were all that was needed for development, there would hardly be any poor country left in the world. The problem is further compounded by widespread deterioration of standards of public administration leading to large scale leakages of funds meant to promote development. Frequent changes in postings and transfers are increasingly being used to make civil servants a subservient tool in the hands of politicians. Lack of transparency in public sector bidding and contracting procedures is giving rise to arbitrary use of power and corruption. Although we have a country which takes pride in being governed by the rule of law, weak law enforcement and inordinate delays in the settlement of legal disputes often make a mockery of such claims. Citizens are often helpless silent victims of an apathetic and indifferent administration. What is all the more distressing is that Parliament and state legislatures find very little time to deal systematically with the growing erosion of both efficiency and integrity in our system of public administration. Sustained and people centred development is not like going to a free dinner party. It requires hard political decisions for which the necessary political will has to be mobilised. We need to draw up a credible programme of reform of our political and bureaucratic structures so as to restore our people's faith in politics as a genuine vehicle of social change. Edited excerpts of an article written by former Prime Minister Manmohan Singh that appeared on August 15, 1997.

LA28 to allow venue naming rights for first time in Olympic history
LA28 to allow venue naming rights for first time in Olympic history

India Today

timean hour ago

  • India Today

LA28 to allow venue naming rights for first time in Olympic history

Los Angeles 2028 Olympic and Paralympic Games will, for the first time in Games history, allow venue naming rights, organizers said on Thursday, unveiling Comcast and Honda 7267.T as inaugural partners in a move aimed at boosting commercial pilot program, developed with the International Olympic Committee (IOC), will let qualifying LA28 partners retain existing venue names during the Games and buy additional marketing also opens naming rights for up to 19 temporary venues to worldwide Olympic partners and LA28 sponsors, while standard "clean venue" rules continue for non-partner sites. Comcast CMCSA.O will lend its name to the Comcast Squash Center at Universal Studios, where squash will make its Olympic debut on the Courthouse Square backlot. Honda Center in Anaheim will become the first arena to keep its name during an Olympic competition, hosting indoor volleyball."Anytime you're the first to do something in the context of the Olympics, it's a big deal," LA28 chair Casey Wasserman told Reuters."It's a big opportunity for us and it's a big statement of support from the IOC. We think it will be a really powerful platform and opportunity in the commercial sector, so we're really excited."Wasserman said the deals introduce a "new commercial model" for the Olympic movement. The IOC traditionally enforces strict branding rules during the Games, masking corporate signage at competition noted money from selling venue naming rights would be in addition to the overall sponsorship revenue target of $2.5 billion, which LA28 calls the largest commercial revenue raise in sports."We've been very conservative, so we have none of this revenue in our budget so any revenue is upside," he said."Having said that, we think it could be significant. It's a really powerful platform for branded partners of ours to engage with us and also with the globe, because it's part of the broadcast. The reach is really stunning."From a practical perspective, the potential for SoFi Stadium and arena to maintain their names during the Games will help fans navigating the city."As a pure matter of wayfinding, it's actually an important piece of the puzzle," he which holds U.S. broadcast rights through NBC and Peacock, said it would support LA28 "across our entire company," including coverage and the squash which in June was named the Games automotive sponsor, said its long-backed Anaheim arena would "step onto the international stage to power Olympic dreams," according to Ed Beadle, a vice president at American Honda Motor said additional naming-rights partners are expected as the three-year countdown continues.- Ends

Delhi's Khan Market set for more upgrades
Delhi's Khan Market set for more upgrades

Hindustan Times

timean hour ago

  • Hindustan Times

Delhi's Khan Market set for more upgrades

New Delhi A view of the Khan Market. (HT Archive) The New Delhi Municipal Council (NDMC) is set to initiate a series of upgrades at the Khan Market in Lutyens' Delhi, including a revamp of its middle lane, installation of a new drainage system, and refurbishment of its pavements and flooring. The civic body will spend around ₹1.5 crore and the project is likely to be completed in three months, officials said. An NDMC official said that under the first phase of the market improvement project, two public toilets have been fully renovated with modern fittings, night cleaning and scrubbing have been introduced along with the development of a solar-powered Micro Material Recovery Facility (MMRF) and RRR (Reduce, Reuse, Recycle) Centre. 'We have also issued directions to traders to ensure that uniform signage is ensured in the market. In the second phase, infrastructure improvement would be carried out, especially in the middle lane, which is the heart of the market comprising all the eateries,' an official said, requesting anonymity. The contractor for the project is likely to be finalised by August 27. Officials said that the project will include taking out existing interlocking paver blocks from the footpath, central verge and market floor. 'The existing RCC covers from drains will also be redone and new drainage lines will be added with more durable high density plastic pipelines. Leather-finish granite stone will be used to provide finishing touches,' the official said. Among the most expensive rental spaces in the country and home to popular eateries, bookstores and shopping outlets, the Khan Market was established in 1951. The double-storey market complex comprises 156 shops and 74 flats on the first floor for shopkeepers. The market is named in honour of Khan Abdul Jabbar Khan, a Pashtun political leader. 'All shops will display boards following a uniform size and design to enhance the market's visual appeal,' the official said. On July 26, HT reported that NDMC issued orders regarding the standardisation of signage and facade at the market. In an order issued by the chief architect of the NDMC on July 15, traders were directed to modify existing signage in two months, following which the NDMC will remove non-compliant signage. Officials said that the plan also included the introduction of precast RCC ducts to accommodate essential services, such as electric cables, water pipelines, and gas pipelines. Sanjiv Mehra, who heads the Khan Market Traders Association, said that the middle lane is the lifeline. 'We have suggested they use precast pipes and equipment so that minimum disturbance is caused. We have been assured that the work will be carried out at night, from midnight to 8am.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store