
Construction season brings lane reductions and closures to Alliston
Residents in Alliston will have to pack their patience as work gets underway on a project that means disruptions this summer.
The Town of New Tecumseth is replacing the sanitary sewer on Victoria Street East, between McDonald and Boyne Streets, starting next week on July 2.
Traffic Woes
During the day, the Town says traffic will be reduced to one lane with temporary traffic lights in place. At night, the road will reopen to two-way traffic.
It's important to note, traffic lights on Victoria and Boyne Streets will be out of operation during the construction.
Due to the road work, McDonald Street will be temporarily closed until August 1.
Driveway Access
The Town says access to driveways inside the work zone may be disrupted at times, but construction crews will work to minimize the inconvenience.
Residents requiring special accommodations that could be impacted by the driveway access interruptions are encouraged to contact the Town Project Manager.
Curbside Collection
Residents should place their waste and recycling bins, clearly labelled with the property address, at the end of their driveway before 7 a.m. on their collection day. The Town says road crews will relocate the bins so they can be accessed by waste collection crews.
Service Interruptions
Services, such as phone, cable TV and gas shouldn't be affected by the road work, barring any unforeseen circumstances, the Town says. If there are expected disruptions, residents will receive proper notice.
The sewer replacement and repaving of the road is expected to be completed by August 1.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CBC
27 minutes ago
- CBC
'I just broke': Denare Beach, Sask., resident shows what's left of her home after wildfire
Rhonda Werbicki says it was devastating returning to her community of Denare Beach, Sask., after a wildfire destroyed much of it. She shows us the remnants of the home where she built a life with her husband and children. The family plans to rebuild.


CTV News
an hour ago
- CTV News
Calgary's newest fire station also has housing and a park
The Varsity Multi-Service Centre, located at 3400 37 St. N.W. (City of Calgary handout/Artists' rendering) A new fire hall in the northwest community of Varsity has officially opened. The building, located at 3400 37 St. N.W., is not only a fire station, but also has residential housing and a park space. City officials say the Varsity Multi-Service Centre will strengthen emergency response to the community while also providing new housing options. 'This project is about building a resilient and inclusive community,' said Katie Black, general manager of community services, in a news release. 'We've brought together key services in one accessible location, while also adding much-needed housing.' Aside from a modernized fire station, the structure includes: 48 mixed-income housing units, including 11 barrier-free homes and several multi-generational family units; A household hazardous waste drop-off site; Flexible workspaces for city service teams operating in the community; and, A new parkette. 'Varsity Fire Station has served the community well for more than 50 years,' said Calgary Fire Chief Steve Dongworth. 'This new fire station will ensure we will be able to serve the community into the future as the community continues to grow and change.' Officials say the old fire facility will be demolished once the new fire station is fully operational. The site of the old fire hall will then be transformed into even more park space. Those interested in taking a look at the new facility can visit during an open house, from 1 to 4 pm. on Saturday, June 28. More information can be found on the City of Calgary's website.


CTV News
an hour ago
- CTV News
City trimming about 10,000 trees a year in maintenance program
The City of Windsor is releasing results of its proactive tree maintenance program to maintain a healthy and safe urban forest. With about 70,000 street trees across the city, the Forestry and Natural Areas team, led by city forester and manager Dr. Yemi Adeyeye, is working diligently to ensure the long-term health and safety of Windsor's tree canopy. 'To keep trees in good condition and reduce the risk of falling limbs, we've created a preventative tree maintenance program,' says Dr. Adeyeye. 'Under this program, we have a seven-year trimming cycle that means we're proactively trimming back about 10,000 trees each year.' In addition to city crews, four certified tree care contractors are engaged to carry out this work, all adhering to rigorous arboriculture (tree care) standards. These standards include removal of deadwoods, crossing limbs (up to four inches in diameter, which may be exceeded when necessary to improve tree shape or meet clearance requirements) and the promotion of healthy branching structure in each tree's canopy. Specific clearance guidelines are also followed over roads, sidewalks, driveways and homes, as follows: Clearance over curb: 450 centimetres (14 to 15 feet) Clearance over lawn: 240 centimetres (8 feet) Clearance over roofs: 300 centimetres (10 feet) Clearance over driveway: 300 centimetres (10 feet) Clearance around traffic signs: 60 centimetres (2 feet) Clearance around streetlight cables: 60 centimetres (2 feet) Clearance of streetlights for 45-degree-angle light pattern The seven-year tree trimming program started in 2021. The city also continues to respond to emergency and urgent requests for tree services as required. Residents with questions regarding the tree maintenance program or other forestry-related matters are encouraged to contact 311 or contact the forestry department at Forestry@ by email.