logo
R1. 25 billion in disaster relief for Eastern Cape, KZN, and Free State municipalities

R1. 25 billion in disaster relief for Eastern Cape, KZN, and Free State municipalities

IOL News08-07-2025
More than 100 people died and there was extensive damage to infrastructure and homes in flooding in the Eastern Cape.
Image: Pedro Mapelo / I'solezwe lesiXhosa
Cooperative Governance and Traditional Affairs (Cogta) Minister Velenkosini Hlabisa has warned municipalities to use disaster funds promptly and for their intended purposes and not to pay salaries or fund trips.
He made these remarks during a briefing yesterday in Sandton where he provided information on the release of the funds following floods and heavy snowfall that occurred in KwaZulu-Natal, the Free State, and the severely affected Eastern Cape.
A total of R1.255 billion has been allocated for the 2025/26 financial year with the funds to be released in phases. The bulk of the money, about R500 million will go to the Eastern Cape which suffered the most damage to infrastructure and homes.
In KZN, R139 million in disaster relief grants has been allocated for 17 municipalities including the eThekwini Municipality, which suffered extensive damage in recent storms.
In June, a total of 107 lives were lost due to disasters. Of these, 103 were in the Eastern Cape, three in KZN, and one in the Western Cape.
In accordance with applicable legislation, business plans, and approved processes, the municipal disaster response grants will be transferred in phases during this month. The Department is currently awaiting transfer dates from the National Treasury, with preliminary dates set for July 11 and 18.
The minister noted that the majority of the municipalities received the Response or Recovery Grant and the Municipal Disaster Response Grant in March 2025 and have not started implementing the projects. KZN municipalities that will benefit include:
Video Player is loading.
Play Video
Play
Unmute
Current Time
0:00
/
Duration
-:-
Loaded :
0%
Stream Type LIVE
Seek to live, currently behind live
LIVE
Remaining Time
-
0:00
This is a modal window.
Beginning of dialog window. Escape will cancel and close the window.
Text Color White Black Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Transparent Semi-Transparent Opaque
Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps
Reset
restore all settings to the default values Done
Close Modal Dialog
End of dialog window.
Advertisement
Next
Stay
Close ✕
Zululand: R13m (in addition to R9m received in March 2025)
Abaqulusi: R12m (in addition to R5.4m received in March 2025)
Inkosi Langalibalele: R11m
Newcastle: R11m (in addition to recovery and response grants allocated in March 2025)
eThekwini metro: R9m (in addition to R8m and R1.4 billion previously allocated)
Edumbe: R10m (in addition to R6.8m received in March 2025)
He added that the Disaster Management Act highlights the importance of self-funding for disaster risk management, requiring state organisations to utilise their own resources for disaster interventions. In instances where public infrastructure is damaged, the relevant state organ bears the responsibility for financing the repair costs.
'With regards to disaster grants, adherence to Section 12 of the Division of Revenue Act (DORA) is crucial. The funds disbursed must be utilised exclusively for sanctioned purposes and may not be redirected to unrelated expenditures, such as employee travel,' Hlabisa stated.
The minister said, 'We appreciate the efforts made to utilise the grants appropriately; however, we have identified several key areas of concern regarding their implementation. These include poor infrastructure planning and execution, inadequate workmanship, diversion or alteration of the scope of work, delays in appointing service providers that lead to municipalities underperforming, and the misallocation of funds towards operational matters instead of the designated projects."
He also noted a significant lack of monitoring and contract management by implementing agents, as well as projects being underdesigned, which makes the infrastructure vulnerable to further damage.
Zululand mayor, Michael Khumalo, welcomed the municipality's allocation.
'This will bring much-needed relief to the people of Zululand. The grant will go a long way in accelerating efforts to mitigate disaster risks. Zululand has previously experienced challenges due to heavy rain, which resulted in significant damage to water infrastructure. As the municipality, we pledge to utilise this grant promptly and responsibly by following procedures and protocols to ensure accountability and transparency,' he said.
ActionSA MP Alan Beesley said it was imperative is that the funds are used promptly and in a cost-effective manner.
"For far too long, disaster grants have been plagued by time delays and dubious procurement. Cogta must ensure there is proper accountability for these grants and that there are serious consequences when these grants are not used as intended.'
KZN Cogta MEC Thulasizwe Buthelezi said the allocation for the province followed applications from KZN municipalities which had been impacted by incidents resulting in damage that would cost billions of rand to fix.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

eThekwini rebuilds flood-damaged infrastructure after 2022 floods
eThekwini rebuilds flood-damaged infrastructure after 2022 floods

The Citizen

time13-07-2025

  • The Citizen

eThekwini rebuilds flood-damaged infrastructure after 2022 floods

The M4 and M19 corridors, once rendered impassable by the 2022 deluge, are being rebuilt as climate-resilient routes. Three years after the devastating April 2022 floods, eThekwini Municipality is not just repairing its damaged infrastructure; it's reimagining it. The city is rebuilding key roads, bridges, and stormwater systems with a focus on resilience and long-term sustainability. Director of the Disaster Management Directorate Vincent Ngubane said the recovery strategy is rooted in the global Build Back Better framework, shifting from mere restoration to long-term resilience. 'Our mission goes beyond emergency response, it's about building a City that is prepared, protected, and proactive,' Ngubane said. 'These disasters illustrate how various stakeholders can work together to enhance the resilience of eThekwini, ensuring comprehensive support for all.' Key corridors rebuilt to withstand floods The M4 and M19 corridors, once rendered impassable by the 2022 deluge, are being rebuilt as climate-resilient routes. Similarly, the flood-prone Prospection Road and uMlazi Canals are now being fortified to protect nearby homes and businesses better. Shallcross Bridge. Picture: Supplied/ eThekwini Critical bridges, including Shallcross and Coedmore, are also being reconstructed with advanced engineering techniques. 'We are not just reacting to disasters, we are anticipating them, and designing our city to withstand them,' Ngubane added. ALSO READ: Cogta warns municipalities against wasting R1.2 billion disaster relief A smarter, more proactive approach The Municipality's approach integrates early warning systems, community preparedness initiatives, and climate-smart infrastructure planning. Programmes aimed at educating communities about disaster readiness and resilient construction methods have also been launched. Chief Civil Engineer in Roads Provision, Linga Govender, said the new structures are designed with future climate risks in mind. 'These new bridges are engineered to stand the test of time and the changing climate,' Govender explained. M4 Corridor. Picture: Supplied/ eThekwini 'They represent a new era of infrastructure that is smarter, stronger, and safer.' Community participation is at the heart of the rebuilding efforts, aligning with the Municipality's belief that resilience must be a shared responsibility. Ngubane said the structures being rebuilt are not just replacements but are engineered to withstand extreme weather events and rising flood risks. NOW READ: KZN flood victims face eviction crisis as government scrambles for R128m

Dam level warnings intensify in Mpumalanga
Dam level warnings intensify in Mpumalanga

The Citizen

time10-07-2025

  • The Citizen

Dam level warnings intensify in Mpumalanga

Only one dam recorded a significant improvement, while the others remained stagnant or decreased. The Department of Water and Sanitation has called on Mpumalanga residents, especially those in the Lowveld and Ehlanzeni District, to intensify water conservation efforts after the province's latest dam level report revealed a concerning trend of declining water reserves across multiple facilities. The warning was announced following the department's release of its state of reservoirs report this week. The report shows that while one dam experienced significant improvement, the majority of monitored facilities either maintained current levels or recorded decreases. Single dam shows improvement amid broader water levels decline Longmere Dam emerged as the sole success story in the latest reporting period, with water levels surging from 90.7% to 98.2% capacity. However, this positive development was overshadowed by declining levels at several other key facilities across the province. ALSO READ: Vaal Dam water levels double compared to last year 'The rest of the listed dams either declined or remained unchanged,' said Wisane Mavasa, spokesperson for the Department of Water and Sanitation. Several dams maintained their previous levels, with Kwena, Buffelskloof and Witklip dams holding steady at 100.2% capacity, while Da Gama Dam remained unchanged at 98.4%. Major Dams record water level drops Multiple strategically important dams experienced decreases in their water levels during the reporting period. According to the department, Blyderivierpoort Dam saw a marginal drop from 100.1% to 100.0%, while Driekoppies Dam decreased from 93.5% to 93.3%. More significant was the decline at Klipkopjes Dam, which fell from 100.0% to 96.1% capacity. Other facilities showing decreases included Primkop Dam, which dropped from 100.6% to 100.4%, Inyaka Dam, which declined from 99.0% to 98.4%, and Ohrigstad Dam, which slipped from 76.6% to 76.0%. The cumulative effect of these changes resulted in Mpumalanga's average dam levels decreasing from 99.2% to 99.0%. ALSO READ: 7 day water outages coming to these Joburg areas Water management areas face declining capacity The province's water management areas also reflected the broader trend of declining levels. The Limpopo-Olifants Water Management Area dropped from 94.4% to 94.3%, while the Inkomati-Usuthu Water Management Area decreased from 98.5% to 98.3%. All three of Mpumalanga's districts experienced reductions in their water storage levels. Ehlanzeni District declined from 96.8% to 96.5%, Gert Sibande moved from 99.8% to 99.6%, and Nkangala dropped from 100.4% to 100.3%. ALSO READ: Water projects worth R50bn to be constructed in Limpopo while progress on older projects stalls Department emphasises conservation despite high levels Despite the relatively high capacity levels across most facilities, the department stressed the importance of maintaining conservation efforts, citing South Africa's ongoing water security challenges. 'While many of these changes may appear marginal, they serve as a reminder that South Africa remains a water-scarce country,' Mavasa stated. ALSO READ: Lepelle responds to water project criticism The department emphasised that sustained conservation efforts remain essential for ensuring long-term water supply security across the province. Residents called to action Officials have outlined specific steps residents can take to contribute to water conservation efforts. The public has been encouraged to use water responsibly and implement water-saving measures in their daily routines. The department has specifically urged residents to address household leaks promptly, eliminate wasteful water practices, and report any infrastructure problems to the relevant authorities. 'Every drop of water counts, and preserving this precious resource is a collective responsibility,' according to the department's conservation messaging. READ NEXT: Rand Water maintenance deepens Joburg water crisis

Eastern Cape to receive disaster relief funds
Eastern Cape to receive disaster relief funds

eNCA

time08-07-2025

  • eNCA

Eastern Cape to receive disaster relief funds

EAST LONDON - Disaster relief funds are being released by COGTA. This follows the devastating floods and snowfall that recently hit several provinces. At least 107 people have died 103 in the Eastern Cape, three in KwaZulu-Natal, and one in the Western Cape. With hundreds of families now displaced and homeless. COGTA Minister Velenkosini Hlabisa has announced that the Eastern Cape will receive over R500 million in municipal disaster-recovery grants.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store