
150 Missiles a Year? India's New BrahMos Hub Is Ready To Fire
Virtually inaugurated by the defence minister, the BrahMos Aerospace Integration and Testing Facility is part of the Uttar Pradesh Defence Industrial Corridor (UPDIC), an initiative to strengthen indigenous defence production and reduce dependence on imports.
The Lucknow hub joins five other defence nodes in the state tha are located in Chitrakoot, Jhansi, Agra, Aligarh and Kanpur.
Mass-Production Of Strategic Weapon
The new unit is expected to begin manufacturing 80 to 100 BrahMos missiles annually, with plans to scale up the production to 150 units per year as it transitions to the lighter and next-generation (NG) variants.
These upgraded missiles will enhance deployment flexibility across land, air and naval platforms, offering India greater reach and deterrence in high-stakes military scenarios.
Developed by BrahMos Aerospace, a joint venture between India's Defence Research and Development Organisation (DRDO) and Russia's NPO Mashinostroyeniya, the BrahMos missile has earned its reputation as a formidable precision-strike weapon.
Capable of flying at speeds up to Mach 2.8 (approximately 3,430 km/h), the missile can engage targets at ranges between 290 and 400 kilometers. Its 'fire-and-forget' capability allows for high-accuracy strikes with minimal operator intervention.
The NG version of the missile marks a technological leap. Weighing just 1,290 kg compared to its predecessor's 2,900 kg, the lighter BrahMos variant allows fighter jets such as the Su-30MKI to carry up to three missiles simultaneously. It will improve sortie effectiveness and operational flexibility.
Designed For Scale And Speed
The Lucknow facility has been built on an 80-hectare plot provided by the Uttar Pradesh government at no cost, with an overall project investment of Rs 300 crore. From groundbreaking in 2021 to full operational status in four years, the unit represents one of India's fastest defence infrastructure turnarounds.
Apart from missile assembly and testing, the facility will host the Titanium and Super Alloys Materials Plant, formally known as the Strategic Materials Technology Complex, for producing aerospace-grade materials crucial to modern weapons systems.
A separate Defence Testing Infrastructure System (DTIS) facility, whose foundation was also laid during the event, will function as a national testing ground for various defence technologies.
Expansion of Defence Corridor Vision
Announced by Prime Minister Narendra Modi during the 2018 Global Investors' Summit, the UPDIC aims to position India as a major defence exporter while creating local jobs and boosting regional economies.
After Tamil Nadu, Uttar Pradesh is the second Indian state to establish a full-scale defence manufacturing corridor.
With the BrahMos integration unit now operational, India takes a step toward aligning its strategic defence goals with self-reliance. And with production set to ramp up sharply, the missile that can be launched from land, air or sea may soon become a more frequent presence in India's growing arsenal.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Economic Times
13 minutes ago
- Economic Times
Ladli Behna Yojana instalment amount increased to Rs 1,500: How to check Ladli Behna Yojana instalment status
ET Online Ladli behena Yojana Ahead of the festive season, the Madhya Pradesh Chief Minister Mohan Yadav declared that the monthly assistance under the Ladli Behna Yojana will be increased to Rs 1,500 starting from the upcoming Bhai Dooj. He assured beneficiaries that this raise will continue consistently. The objective of the scheme is economic self-reliance of women, continuous improvement in their health and nutrition level and strengthening their role in family decisions. Has RBI directed banks to stop disbursing Rs 500 notes from ATMs by September 30, 2025? Here is what government said On August 7, 2025 CM Mohan Yadav transferred the 27th instalment of the Ladli Behna Yojana, Rs 1,250, along with Rs 250 as a Raksha bandhan gift, totaling Rs 1,500 per sister, to the accounts of over 1.26 crore sisters. How to check Ladli Behna Yojana instalment status? Step 1: Go to official website, Step 2: Click on the 'Application Status' or 'Payment Status' linkStep 3: Enter your application number or Samagra ID and registered mobile 4: An OTP will come on your mobile number, verify 5: After this, you will see the status of your payment. What is the eligibility criteria for beneficiaries under the scheme?All married women (including widows, divorced and deserted women) who are local residents of Madhya Pradesh and born after 01 January 1961 but till 01 January 2000 and do not fall in the category of ineligibility mentioned in the scheme will be eligible to apply in the year 2023. Is there any limit on family income under the scheme? Yes, women whose family's combined annual income is more than Rs 2.5 lakh will be ineligible under the scheme. Will I get the benefit of the scheme even if I am an income tax payer? No, if any member of the applicant's family is an income tax payer, then she will be ineligible under the scheme. Is an unmarried applicant eligible for the scheme? No, the scheme is only for married/divorced/widow/abandoned women. What is meant by an Aadhaar linked DBT enabled bank account? Aadhaar linked DBT enabled bank account means linking of bank account with Aadhaar of the applicant and transfer of amount to the bank account through Aadhaar number only. How can the applicant enable Aadhaar linked DBT of her bank account? After the applicant goes to her bank branch or the authorized kiosk of the said bank and fills the consent form for linking the bank account with Aadhaar and enabling DBT, her account is linked to Aadhaar and DBT is enabled after the banking e-KYC verification of the applicant by the bank branch or the authorized kiosk of the said bank. N.R. Narayana Murthy Founder, Infosys Watch Now Harsh Mariwala Chairman & Founder, Marico Watch Now Adar Poonawalla CEO, Serum Institute of India Watch Now Ronnie Screwvala Chairperson & Co-founder, upGrad Watch Now Puneet Dalmia Managing Director, Dalmia Bharat group Watch Now Martin Schwenk Former President & CEO, Mercedes-Benz, Thailand Watch Now Nadir Godrej Managing Director, of Godrej Industries Watch Now Manu Jain Former- Global Vice President, Xiaomi Watch Now Nithin Kamath Founder, CEO, Zerodha Watch Now Anil Agarwal Executive Chairman, Vedanta Resources Watch Now Dr. Prathap C. Reddy Founder Chairman, Apollo Hospitals Watch Now Vikram Kirloskar Former Vice Chairman, Toyota Kirloskar Motor Watch Now Kiran Mazumdar Shaw Executive Chairperson, Biocon Limited Watch Now Shashi Kiran Shetty Chairman of Allcargo Logistics, ECU Worldwide and Gati Ltd Watch Now Samir K Modi Managing Director, Modi Enterprises Watch Now R Gopalakrishnan Former Director Tata Sons, Former Vice Chairman, HUL Watch Now Sanjiv Mehta Former Chairman / CEO, Hindustan Unilever Watch Now Dr Ajai Chowdhry Co-Founder, HCL, Chairman EPIC Foundation, Author, Just Aspire Watch Now Shiv Khera Author, Business Consultant, Motivational Speaker Watch Now Nakul Anand Executive Director, ITC Limited Watch Now RS Sodhi Former MD, Amul & President, Indian Dairy Association Watch Now Anil Rai Gupta Managing Director & Chairman, Havells Watch Now Zia Mody Co-Founder & Managing Partner, AZB & Partners Watch Now Arundhati Bhattacharya Chairperson & CEO, Salesforce India Watch Now


Economic Times
13 minutes ago
- Economic Times
PG Electroplast shares plunge 23% after Q1 PAT drops YoY & QoQ. Near term headwinds seen
PG Electroplast stock slumped after weak Q1 profit, impacted by early monsoon and seasonal slowdown in Room AC sales, despite year-on-year revenue growth. PG Electroplast shares fell 23% after Q1 net profit dropped 20% YoY and 54% QoQ to ₹67 crore. Despite 14% YoY revenue growth, early monsoon hit seasonal AC sales. Management stays optimistic on long-term outlook. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads Shares of PG Electroplast ended with 23% cuts on Friday after the company reported a 20% year-on-year decline in its Q1 consolidated net profit at Rs 67 crore. The decline was even sharper on a sequential basis, plunging 54%.The company had reported a profit after tax (PAT) of Rs 84 crore in Q1FY25 and Rs 145 crore in Q4FY25 and the numbers are attributable to the owners of the company's revenue from operations increased 14% to 1,504 crore in the quarter under review while falling 21% on a sequential basis. The topline stood at Rs 1,321 crore in Q1FY25 and Rs 1,910 crore in Electronic Manufacturing Services (EMS) and plastic molding company attributed the PAT decline to the early arrival of the monsoon which impacted seasonal sales for Room ACs, making Q1 a more subdued start to the Gupta, Managing Director – Finance expects the near-term growth to likely moderate, he remains upbeat about the company's medium and long-term earnings were announced today during market hours and PG Electroplast shares today closed at Rs 567.35 on the NSE, eroding nearly Rs 170 per Read: SBI Q1 Results: Standalone PAT jumps 12% YoY to Rs 19,160 crore, beats Street estimates The Earnings Before Interest, Taxes, Depreciation and Amortisation (EBITDA) stood at Rs 139.42 crores versus Rs 134.54 crore in 1QFY25, recording a growth of 3.6%.The consolidated revenues crossed Rs 1,500 crores, with the product business contributing Rs 1,159. PGEL's 100% subsidiary, PG Technoplast, reported revenues of Rs 1,211 Product business contributed 77.1% of overall revenues, growing 16.7% YoY. Within this, room ACs grew 15.1% YoY, washing machines grew 36.1% YoY, and coolers declined marginally by 3.9% YoY.


Hindustan Times
17 minutes ago
- Hindustan Times
Amit Shah lays foundation for Janki Mandir revamp in Bihar's Sitamarhi district
Union Home Minister Amit Shah on Friday laid the foundation stone for the redevelopment of Janki Mandir at Punauradham in Bihar's Sitamarhi district, considered the birthplace of Goddess Sita. Amit Shah performed 'bhoomi pujan' and unveiled the design of the Janki Mandir for its redevelopment. (PTI) The foundation stone-laying ceremony of the project, worth more than ₹882.87 crore, was also attended by Chief Minister Nitish Kumar, Deputy Chief Minister Samrat Choudhary, several Union ministers and other dignitaries. Shah performed 'bhoomi pujan' and unveiled the design of the Janki Mandir for its redevelopment, officials said. Also Read: Amit Shah becomes longest-serving home minister, receives praise from PM Modi at NDA meet He also virtually flagged off the Sitamarhi-Delhi Amrit Bharat Express train. The state cabinet had sanctioned ₹882.87 crore for the integrated development of the temple complex on July 1. Of the total amount, ₹137 crore would be spent on the development of the old temple and its premises, while ₹728 crore would be used for tourism-related activities, the officials said. In addition, ₹16 crore would be spent on comprehensive maintenance for 10 years, he said. Bihar State Tourism Development Corporation (BSTDC) would implement the project. The state government recently formed a nine-member trust, headed by the chief secretary, for the construction and redevelopment of the shrine. "Comprehensive development will be carried out on the lines of the Shri Ram Janmabhoomi Tirth Kshetra, Ayodhya", Bihar BJP spokesperson Niraj Kumar had told PTI earlier, adding that a large number of pilgrims visit the Punauradham. The state cabinet also approved the appointment of a Noida-based company as the design consultant for the project. The firm was engaged in the master planning and architectural services for the Ram Janmabhoomi Nyas.