
Marcos vows 40K new classrooms before end of his term
In his fourth State of the Nation Address (SONA) on Monday, Marcos said the government has already built nearly 22,000 classrooms in the past three years and will ramp up construction in partnership with the private sector.
'Sa tatlong taon, halos dalawampu't dalawang libong silid-aralan ang nabuksan na. Hihigitan pa natin ito, dahil talagang nakakaawa na ang ating mga mag-aaral. Hindi na dapat nabibitin ang oras nila sa klase dahil sa kakulangan sa classroom,' the president said.
(In three years, almost twenty-two thousand classrooms have been opened. We will surpass this, because our students are truly pitiful. Their classes will no longer be cut short in time because of the lack of classrooms.)
The pledge aims to reduce the country's longstanding classroom backlog, which has forced many schools to conduct double or even triple shifts, often in cramped or makeshift facilities.
To sustain the momentum, Marcos urged Congress to provide consistent and sufficient funding for the Department of Education's (DepEd) school infrastructure program.
The 40,000 additional classrooms, he said, are critical in improving learning conditions, especially as the country continues to implement learning recovery measures in the aftermath of the pandemic.
'Katuwang ng pribadong sektor, sisikapin nating madagdagan pa ng apatnapung libong silid-aralan bago matapos ang ating Administrasyon.
Maglalaan tayo ng sapat na pondo para rito. Alang-alang sa ating mga mag-aaral, hihilingin ko ang buong suporta ng ating Kongreso," tshe President said.
Education Secretary Sonny Angara earlier reported that DepEd is working with the private sector and local governments to accelerate school construction, with new modular classrooms also being deployed to disaster-hit areas.
Advocates have long cited inadequate school infrastructure as a major barrier to quality education, contributing to learning loss, student fatigue, and lower academic outcomes.
Meanwhile, Education Secretary Sonny Angara earlier said the administration is pushing to adopt a Public-Private Partnership (PPP) model to fast-track classroom construction — one of the few viable solutions that can scale up infrastructure without overburdening the yearly education budget. —VAL, GMA Integrated News
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


GMA Network
12 hours ago
- GMA Network
Instead of cash, grant livelihood capital to 4Ps beneficiaries — Erwin Tulfo
Senator Erwin Tulfo has proposed to provide livelihood capital to beneficiaries of the Pantawid Pamilyang Pilipino Program (4Ps) instead of cash transfer to curb reported abuses. 'If we give them capital, they can use it to start businesses and contribute to the economy. We can provide them enough funds to start a sari-sari store, an eatery, or even engage in online selling,' Tulfo said Sunday in a statement. This after some 4Ps beneficiaries were reportedly caught using their cash grants on gambling and illegal drugs. Tulfo added some 4Ps beneficiaries 'would rather have livelihood capital instead of monthly cash transfer.' 'It is also hard for them to hear that they are being called freeloaders, lazy, and that they do not add value to the country,' the senator said. 'It is also unfair to low-wage earners like security guards, janitors, or house helpers who tighten their belts due to lack of funds but receive nothing from the government, such as 4Ps, since they are not qualified,' he added. The lawmaker said this proposal is one of the topics he aims to deliver in his upcoming meeting with President Ferdinand Marcos Jr. and Department of Social Welfare and Development (DSWD) Secretary Rex Gatchalian. However, the date was not disclosed. During the Post-SONA discussion on Tuesday, Gatchalian shared that the President's call to amend the 4Ps law would that would allow those in the program to stay longer than seven years. Gatchalian noted this as a welcome development, as two million Filipinos were about to exit the program in 2026 for reaching the maximum number of years in the program. — Mariel Celine Serquiña/RF, GMA Integrated News
_2025_08_02_18_07_56.png&w=3840&q=100)

GMA Network
a day ago
- GMA Network
Marcos transfers Sulu to Region IX following SC decision on BARMM
President Ferdinand Marcos Jr. has moved Sulu to Region IX, also known as the Zamboanga Peninsula, after the Supreme Court (SC) ruled last year that the province is not a part of the Bangsamoro Autonomous Region in Muslim Mindanao (BARMM). Signed on July 30, Marcos' Executive Order 91 said there was an ''urgent need to effectively implement and address the impacts'' of the SC ruling, ''including the regional affiliation of the Province of Sulu, while continuing to ensure the uninterrupted governmental operations and delivery of essential government projects, programs, and activities within Sulu.'' He directed all national government agencies to include Sulu under Region IX for regional administration, development planning, investment programming and budgeting, and other relevant purposes. Marcos also established a technical working group (TWG) headed by the Secretary of the Department of Budget and Management. The TWG's functions are to oversee and monitor the implementation of the SC decision, prepare and release a transition plan, address any issues or concerns arising from the SC ruling, request assistance from relevant agencies in implementing the EO, and submit an annual report to the Office of the President. Last September, the SC upheld the constitutionality of the Bangsamoro Organic Law (BOL), but it also declared that Sulu should not have been included in the BARMM. Sulu rejected the ratification of the BOL during the plebiscite in 2019. —VBL, GMA Integrated News


GMA Network
2 days ago
- GMA Network
Marcos leads launch of estero cleanup program in Pasig
President Ferdinand Marcos Jr. at the launch of Bayanihan sa Estero: Malinis na Estero Pamayanan Protektado program in Pasig City, August 2, 2025. Screenshot from RTVM video President Ferdinand "Bongbong" Marcos Jr. on Saturday led the launching of the Bayanihan sa Estero: Malinis na Estero Pamayanan Protektado program at the Ilugin River (Buli Creek) in Barangay Pinagbuhatan, Pasig City. Under the program, activities such as unclogging Metro Manila's drainage laterals, dredging waterways, removing silt from drainage mains and eliminating accumulated solid waste are included. The aim is to reduce the impact of floods due to unusually heavy rains. The program is to be implemented in close coordination with national government agencies (NGAs) led by the Metropolitan Manila Development Authority, local government units (LGUs) and civil society organizations (CSOs). Twenty-three esteros have been identified to be prioritized in the Bayanihan sa Estero: Malinis na Estero Pamayanan Protektado program, the Presidential Communications Office said. These 23 esteros were observed to have significant siltation, heavy solid waste buildup, poor flow conditions and vulnerability to recurrent flooding. During the launch on Saturday, Marcos observed the cleanup drive in Buli Creek. Water hyacinths were removed from the pond using a crane on a barge. Marcos also inspected the mobile recovery facility where water hyacinths by-products such as lily pots and charcoal briquettes and recyclable wastes collected from the river such as hollow blocks and plastic bricks are displayed. The President also interacted online with volunteers and Metropolitan Manila Development Authority personnel who were conducting a simultaneous cleanup drive at Catmon Creek in Malabon City, Pinagsama Creek in Taguig City, Hagonoy Retarding Pond in Taguig City, and Tapayan Retarding Pond in Taytay, Rizal. "Currently, there are 273 identified rivers, tributaries, esteros and open canals in the metropolis that serve as primary channels for conveying stormwater and flood runoff across the National Capital Region (NCR)," the PCO said. —KG, GMA Integrated News