Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0%...
Article content
Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project
Article content
Spanish Mountain Gold Ltd. ('Spanish Mountain' or the 'Company') (TSX-V: SPA; FSE: S3Y; OTCQB: SPAUF)
Article content
is pleased to announce the results of a Preliminary Economic Assessment ('
Article content
PEA
Article content
'), including an updated mineral resource estimate ('MRE'), for the Spanish Mountain Gold Project (the 'Project'), located within central British Columbia, Canada. The PEA is a conceptual study of the potential economic viability of the Main Deposit Mineral Resource, that includes the Main Zone and North Zone. The PEA will be published in an independent National Instrument ('NI') 43-101 Technical Report within 45 days of this news release and filed on SEDAR+. Once filed on SEDAR+, the PEA will supersede the Spanish Mountain Gold Project Prefeasibility Study ('NI') 43-101 Technical Report (PFS) dated May 31, 2021. The PEA study was commissioned by the Company and prepared by a consortium of consultants led by Ausenco Engineering Canada ULC ('
Article content
Ausenco
Article content
'). The PEA envisions a conventional open pit mining and milling operation with a projected 24.5-year life of mine ('LOM') producing 3 million ounces ('Moz') of payable gold, with a front weighted production profile and attractive economics. All currency amounts herein are in Canadian dollars unless otherwise indicated.
Article content
President and CEO, Peter Mah stated:
Article content
'The re-envisioned, larger scale Spanish Mountain Gold Project and the completion of a new robust, de-risked PEA with updated MRE marks a significant achievement for the Company's transformation from explorer to developer. With over 235,000 metres ('m') of drill information our confidence in the resource quality and proposed mine confirm our strategy to advance the Project towards feasibility and ultimately a build decision by 2027. Project upside is supported by drill success in 2024 to 2025 reinforcing the potential for new additional discoveries of high grade near surface gold mineralization in prospective gold host rocks over the 10 km long property wide corridor. With a regional setting of nearby experienced First Nations, communities, currently producing mines, a power interconnection point near William's Lake, B.C. that is progressing through Stage 2 of B.C. Hydro's system impact study, established mining infrastructure plus workforce, and year round paved road access to within 6 km of the Project site, the Project's favourable location and jurisdiction speak volumes to the Project's overall quality and likelihood to advance to production. Spanish Mountain's commitment to create BC based jobs, business opportunities, and sustainable shared benefits for the First Nation's and surrounding communities has been demonstrated during the 2024-25 drill programs. We've heard the First Nations' and communities' feedback regarding the environment and are pleased to have found a way to address those shared concerns to derisking tailings, waste, and water management. Considering the rising gold price environment supporting the need to rapidly advance gold projects in Canada, and alongside the amazing regional support we've received in British Columbia for the Project to date, we look forward to continuing to earn support for our Project, while conserving and improving the economic sustainable value for all stakeholders. Spanish Mountain Gold has a bright future ahead creating a new definition of responsible sustainable mining that generations of Canadians will be proud of!'
Article content
Highlights
Article content
Robust Economics: Base case after-tax NPV5% of C$1,025 million with an after-tax IRR of 18.2% using a gold price assumption of US$2,450/ounce ('oz'). Using a spot gold price of US$3,300/oz gold, after-tax NPV5% increases to C$2,315 million and the after-tax IRR to 32.0%.
Significant Production and Low Cost: 203,265 oz average annual gold production in the first 5 years at an all-in sustaining cost net of by-product credits ('AISC') of US$1,024/oz and 122,041 oz average annual gold production over a 24.5-year LOM at an AISC of US$1,338/oz.
Rapid Payback of Capital Expenditures: C$1,250 million initial capital paid back over 3.4 years at PEA base case and decreasing to 2.0 years at spot gold price of $3,300/oz gold.
High Degree of Resource Confidence: Economic analysis is based on Measured and Indicated Resources sub-totalling 33.3% and 65.1% respectively or grand total of 98.4% but excludes potential upside opportunities from the 2025 drill results and MRE from the Phoenix deposit.
Low Risk: Conventional open pit and milling operation with road access and hydro-electric power.
New Innovative, De-risked Tailings Facility: Dry stack plus coarse free draining tailings, waste and water management facilities that are integrated and significantly reduce volume of tailings impacted runoff for treatment and discharge. The proposed tailings facility includes 100% reuse of process water, avoids discharge near the Cedar Point Provincial Park and minimizes the disturbance of fish bearing waters. The proposed tailings facility utilizes feedback obtained from the First Nations, nearby communities and industry to utilize best in class available environmental solutions that the Company anticipates will significantly reduce risks at closure and promote protection of the land and waterways to perpetuity.
Significant Opportunities: Potential to further enhance Project economics and expand production rate have been identified with the addition of the maiden Phoenix deposit MRE, ongoing endowment potential extensions and preconcentration technologies such as mineralized material sorting to boost mill feed grade.
Strong Discovery Growth Potential: Exploration diamond drill programs completed in 2024 and 2025 extended gold mineralization and intercepted higher-grade mineralization adjacent to Project infrastructure over a strike length in excess of 3 km.
Article content
Table 1: PEA Results Summary
Article content
Open Pit PEA Study Results
2025 PEA
Base Case
Spot Prices
(as of July 1, 2025) 1
After-Tax NPV (C$M, 5% discount rate)
$1,025
$2,315
After-Tax IRR (%)
18.2%
32.0%
Annual Average Free Cash Flow (C$M) 4
$85
$173
Annual Average Free Cash Flow Yr. 1-5 (C$M) 4
$311
$454
Initial Capex (C$M)
$1,250
$1,250
Total Cash Cost (US$ / Au oz) 2
$1,194
$1,201
AISC (US$ / Au oz) 3
$1,338
$1,345
Payback Period (years) After-Tax
3.4
2.0
Nominal Processing Throughput (tpd)
26,000
26,000
Strip Ratio (waste:mill feed resource)
2:1
2:1
Mine Life (years)
24.5
24.5
Annual Average Throughput (Mtpa)
9,340
9,340
Annual Average Production (koz/a)
122
122
Average Gold Head Grade (g/t)
0.46
0.46
Average Gold Recovery (%)
89.3%
89.3%
Metal Prices (US$ / oz)
$2,450 Au
$28.50 Ag
$3,300 Au
$36.00 Ag
Exchange Rate USD/CAD
1.35
1.35
Total LOM Au ounces produced (Moz)
3.0
3.0
Total LOM Ag ounces produced (Moz)
2.1
2.1
Notes for Table 1
1. Spot price is based on the LBMA gold price as of the close of business on July 1, 2025, rounded down to the nearest $100/oz for gold and $1/oz for silver.
2. Cash Costs consist of mining costs, processing costs, mine-level G&A, offsite charges, and royalties less by-product credits. Refer to the 'Non-Gaap Financial Measures' section in Appendix B of this news release for more information.
3. All-In Sustaining Costs (AISC) includes cash costs plus sustaining capital, closure costs, and salvage credits. Refer to the 'Non-GAAP Financial Measures' section in Appendix B of this news release for more information.
4. Free cash flow is calculated as after tax cash flow from mine-site operating activities less capital expenditures, including closure costs (net of salvage value). Refer to the 'Non-GAAP Financial Measures' section in Appendix B of this news release for more information.
Article content
The economic analysis contained in this news release is preliminary in nature and is based primarily on Measured and Indicated Mineral Resources totalling 33.3% and 65.1% respectively, and in part, Inferred Mineral Resources totalling 1.6% of the proposed mill feed from the Main deposit. Inferred Mineral Resources are considered too geologically speculative to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that economic forecasts on which this PEA is based will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Table 2 lists the breakdown by resource category of the run of mine ('ROM') mill feed for the PEA life of mine plan.
Article content
Table 2: ROM mill feed and ounces by resource category
Article content
Mineral Resource Estimate for the Main Deposit
Article content
Note: The Main Deposit is included in the financial modelling for the 2025 PEA.
Article content
The updated MRE for the Main deposit is based on the amalgamation of what have been historically described as the Main Zone, North Zone, Slipper Zone, and K Zone, effective January 10, 2025, and it is reported at a 0.15 g/t gold cut-off (see Table 3). There is no certainty that Mineral Resources will be converted into Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources include Inferred Mineral Resources which have had insufficient work to classify them as Indicated Mineral Resources. It is uncertain but reasonably expected that Inferred Mineral Resources could be uplifted to Indicated Mineral Resources with additional drilling.
Article content
Geological and resource domain modelling and estimation for the Project was completed using Leapfrog 2024.1. The lithological model was developed based on data from the extensive re-logging program of 170,000 m drill core that was completed in 2023 and 2024, in addition to geochemical classification of 56,550 previously sampled intervals. Mineralization domains are modelled by identifying zones with gold values greater than 0.3 g/t over a minimum width of 3 m. Two primary styles of mineralization were recognized. Early mineralization includes disseminated stratabound mineralization in argillite-bearing lithologies. Late mineralization includes gold associated with late-stage quartz veins. Three high-confidence faults were modelled, including the North Fault, South Fault, and Fault 1. The Main Block is bound by the North and South Faults, representing significant discontinuities in stratigraphy and mineralization. Within the Main Block, Fault 1 introduces a minor offset in the main block.
Article content
Reasonable prospects for eventual economic extraction were evaluated by performing a pit optimization using the Lerchs-Grossman algorithm with the following parameters: gold price of US$2,400/oz, silver price of US$30/oz, and gold selling costs of C$7/oz for offsite charges, and a 1.5% royalty. Mining costs for mineralized material and waste are C$3.75/t, with incremental mining costs of C$0.03/t. Processing costs are C$12/t for mill processing and include site G&A. Payability for gold is 99.8%, and payability for silver is 90%. Process recovery for gold is 90%, while process recovery for silver is 50%. The exchange rate used is C$0.73 to US$1.
Article content
Total Measured and Indicated Mineral Resources for the Main deposit includes 292.1 Mt at an average grade of 0.44 g/t gold and 0.66 g/t silver, for a total of 4.2 M contained ounces of gold and 6.2 M contained ounces of silver. Total Inferred Mineral Resources for the Main deposit includes 14.8 Mt at an average grade of 0.33 g/t gold and 0.95 g/t silver, for a total of 0.2 M ounces of gold and 0.5 M ounces of silver.
Article content
Table 3: Mineral Resource for the Main deposit
Article content
Mineral Resource Estimate for the Phoenix Deposit
Article content
Note: The Phoenix Deposit is not included in the financial modelling for the 2025 PEA
Article content
.
Article content
The inaugural MRE for the Phoenix deposit is reported at a 0.20 g/t gold cut-off. Total Indicated Mineral Resources for the Phoenix deposit include 0.05 Mt at an average grade of 0.35 g/t Au, for a total of 0.6 thousand ounces (koz) of contained gold. Inferred Mineral Resources include 25.4 Mt at an average grade of 0.44 g/t Au, for a total of 357 koz of contained gold (see Table 4).
Article content
Notes for Tables 4 and 5:
1. The qualified person responsible for the Phoenix deposit MRE, with an effective as of as of June 17, 2025, is Bahram Bahrami, P.Geo of Equity Exploration Consultants Ltd.
2. Mineral Resources are classified in accordance with CIM (2014) definition standards
3. Mineral Resources are reported using a 0.20 g/t gold cut-off grade
4. Metal price assumptions include US$2,400/oz Au
5. Metallurgical recoveries assumptions are 90% recovery for gold
6. 99.8 payability for gold
7. Numbers may not add due to rounding
8. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
9. The qualified persons responsible for this section of the technical report are not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate other than those disclosed in this news release and in the PEA Technical Report
10. Refer to Appendix C for the estimation methodology
Article content
Geological and resource modelling for the Phoenix deposit was completed using Leapfrog 2024.1 and Micromine Origin & Beyond 2025. The lithological model was developed based solely on geochemical classification, with six principal stratigraphic units identified: Upper Mafic Tuff, Upper Sedimentary Sequence, Lower Mafic Tuff, Intermediate Sedimentary Sequence, Intermediate Tuff, and Lower Sedimentary Sequence. These units generally dip gently to the northeast. A steeply dipping north-south trending fault divides the Phoenix deposit into eastern and western blocks. The eastern block contains the full stratigraphic sequence, while the western block includes only the two lowermost stratigraphic units found in the eastern block.
Article content
Gold mineralization was modelled based on downhole structural data measured from oriented drill core. This interpretation includes identifying two principal sets of mineralized structures: flat to gently east-dipping and steeper northeast-dipping orientations. These define three mineralized lenses—two upper, gently dipping zones and a deeper, steeper-dipping zone.
Article content
Capping values for the Phoenix deposit were determined using decile analysis and log-scaled probability plots of length-weighted gold assays. Outlier restrictions were applied to lithological domains during the second estimation pass, excluding samples above 0.2 g/t gold where search distances exceeded 30% of the variogram range. No outlier restrictions were applied to mineralized domains. A semi-hard boundary approach was applied to specific lithological contacts reflecting gradational contacts of lithological units. These included the Lower Mineralized Zone (Domain 630) with a distance threshold of 5 m, the Lower Mafic Tuff with 15 m, and the Lower Sedimentary unit with 50 m. This approach was used to reduce artefacts and better represent grade continuity in stratigraphically complex or sparsely drilled areas.
The block model was constructed using a parent block size of 5m x 5m x 5m, with sub-blocks refined down to 1.25 m to accurately honor geological boundaries and minimum mining widths. Grade estimation was conducted using a combination of Ordinary Kriging (OK) and inverse distance cubed (ID3) methods. OK was used for all mineralized domains where variograms could be reliably modelled; ID3 was applied to other domains where variogram stability could not be achieved. Locally varying anisotropy (LVA) was applied within mineralized domains to reflect observed structural controls.
Article content
Resource classification followed the CIM Definition Standards (2014) and was guided by geological confidence, data spacing, and estimation support. The current drilling density supports predominantly Inferred classification. These are supported by at least two drill holes within a spacing of ≤155 m. Indicated Mineral Resources are supported by drill hole spacing of ≤70 m with minimum of 3 drill holes used for estimation.
Article content
Reasonable prospects for eventual economic extraction were applied by performing a resource pit optimization and applying the following parameters: a gold price of US$2,400/oz, gold selling costs of C$7/oz for offsite charges, a 1.5% royalty, Mining costs of C$3.75/t with incremental costs of C$0.03/t, and combined processing and site G&A costs of C$12/t. Gold payability was assumed to be at 99.8%, with a metallurgical recovery of 90%. The exchange rate used was C$0.73 to US$1.00. No by-product metals were included in the estimate.
Article content
For Phoenix, a cutoff grade of 0.20 g/t gold is used due to limited metallurgical data compared to the Main deposit. This higher cut-off accounts for increased geological and metallurgical uncertainty for the Phoenix deposit. Cut-off sensitivities of the Phoenix deposit mineral resource are summarized in Table 5.
Article content
Table 5: Mineral Resource for the Phoenix deposit at varying gold cut-off grades
Article content
Notes: See Table 4
Article content
Spanish Mountain Project Consolidated Mineral Resources
Article content
Total combined Mineral Resources for the Spanish Mountain Gold Project are summarized in Table 6. Total Measured and Indicated mineral resources include 292.1 Mt at 0.44 g/t gold for total 4.16 M contained gold ounces. Total inferred mineral resources include 40.3 Mt at 0.40 g/t gold for total 512 k contained gold ounces.
Article content
Table 6: Consolidated Mineral Resources for the Spanish Mountain Gold Project
Article content
Notes on Table 6:
1. The Mineral Resource for the Main Deposit is reported using a cut-off grade of 0.15 g/t Au, while the Phoenix Deposit uses a 0.20 g/t Au cut-off.
2. The Mineral Resources are constrained within an optimized pit shell generated using Lerchs–Grossman pit optimization based on a gold price of US$2,400/oz, 99.8% payability, 90% gold recovery, C$12/t processing and G&A, C$3.75/t mining for ore and waste, C$0.03/t incremental mining cost, 1.5% royalty, C$7/oz offsite charges, and an exchange rate of 0.73:1 (CAD:USD).
3. Mineral Resources are derived from resource statements for each deposit and area, prepared by Bahram Bahrami, P.Geo., a Qualified Person as defined under NI 43-101.
4. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
5. The Mineral Resource estimate complies with NI 43-101 Standards of Disclosure for Mineral Projects (May 2016) and CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014).
6. Any discrepancies in totals are due to rounding.
7. The effective date of the Mineral Resource statement is January 10, 2025 for the Main Deposit and June 17, 2025 for the Phoenix Deposit.
Article content
Mining and Processing
Article content
Open pit mine designs, mine production schedules and mine capital and operating costs have been developed for the Main deposit, at a scoping level of engineering. The mineral resources, including inferred resources, form the basis of the mine planning. The Phoenix deposit MRE are not included or considered as part of the mine plan.
Article content
Open pit mining activities are designed for approximately 24.5 years of operation. Mine planning is based on large scale conventional drill/blast/load/haul open pit mining methods suited for the Project location and local site requirements. The subset of mineral resources contained within the designed open pits are summarized in Table 7, with a 0.2 g/t Au cut-off grade, and form the basis of the mine plan and production schedule, which is summarized in Figure 5.
Article content
Mill feed quantities and grades include estimates of mining dilution and recovery based on a 10 m selective block size and 2 m dilution skins applied to all waste contacts. This results in an addition of 16% dilution and 2% loss to the original resource block model.
Article content
Figure 5: PEA Mine Production Schedule Summary
Article content
Processing of the mill feed at 26,000 tpd (or 9.5 Mt per annum) is by means of a conventional process flowsheet including primary grinding, gravity concentration, flotation, and regrinding of the concentrate followed by cyanidation via a CIL circuit to produce doré. The process achieves an average overall LOM gold recovery of 89%. The average silver recovery as a by‐product of the milling process for the life of the Project is 44%. Non-Acid Generating ('NAG') tailings from the plant are dewatered by screening and filtering and conveyed to a dry stack tailings facility, where it will be spread and compacted in engineered lifts. All site water is managed through a separate water management pond that includes a water treatment plant for any water to be discharged during the LOM.
Article content
The tailings storage facilities proposed for construction and development at Project are primarily based on utilization of filtered tailings technology for the base case scenario. Multiple tailings storage locations, designs, and technologies were analyzed to arrive at the preferred location and tailings technology.
Article content
Initial Capital Costs
Article content
The initial capital expenditures for the Project as estimated by Ausenco are summarized in Table 8 and the capital expenditures to be incurred after the start-up of operations are assigned to sustaining capital and are projected to be covered by operating cash-flows. Project contingencies have been added where applicable, excluding capitalized operating costs, which results in an overall contingency of $270.3M or 22.6% (excluding taxes).
Article content
The Project will benefit from established infrastructure in central British Columbia, noting that the Project is approximately 100 km by road to the city of Williams Lake. Local infrastructure in Likely will further support the Project development. The estimated initial capital cost of $1,250 M is inclusive of applicable taxes.
Article content
Notes on Table 8:
1. Direct process plant capital costs are based on benchmarking and not from engineering design.
2. Totals do not necessarily equal the sum of the components due to rounding adjustments; not all cost components are illustrated in this table.
Article content
Sustaining Capital Costs:
Article content
Ausenco estimates the LOM sustaining capital for Project to be C$443 M, which is expected to be funded by operating cash flows. The sustaining capital estimate is primarily for the expansion of the tailing storage facility, mining fleet additions as total material movements increase with depth, and reclamation and closure. The PEA has assumed C$163 M in closure and reclamation costs.
Article content
The estimated Opex for Project is US$15.33/t of mill feed – see Table 7. Ausenco and MMTS have estimated the Opex based on first-principles calculation, industry benchmarking, proprietary information and its professional experience.
Article content
Notes for Table 9:
1. Totals do not necessarily equal the sum of the components due to rounding adjustments; not all cost components are illustrated in this table.
Article content
Royalties
Article content
There is a 1.0 to 1.5% Net Smelter Royalty ('NSR') payable to two royalty holders. These are the only royalties that apply to the current Mineral Resources as mill feed for the Project and has been incorporated into the economic analysis of the 2025 PEA. The Company plans to exercise its right to buydown the NSRs to 1.5% and 1% respectively, for a total buydown payment of $1 million as provided in the agreements.
Article content
Infrastructure
Article content
The major infrastructure items considered and costed in the PEA support a mining and milling operation that is expected to operate 24-hours per day, seven-days per week. The design of Project infrastructure has prioritized environmental protection, workforce safety, and operating efficiency while minimizing community impacts. The Project site will consist of the open pit mine and mining related workshops, a processing plant, waste rock and tailings stack, and support service infrastructure such as warehousing, offices and workshops.
Article content
The Project site-wide water balance is positive for which water capture, treatment and discharge infrastructure has been allowed for and designed. The Project will draw water from within the property and contain process water and tailings within the water management pond and tailings stack, effectively. Water management and treatment has been included to treat both open pit dewatering and surface facilities run-off to required environmental discharge standards.
Article content
The site will be supported by renewable electrical grid power through a new, 75 km long 230kV, transmission line constructed by the Company from site to a new switching station designated as SMM, which is currently being designed by BC Hydro, located near the McLeese Lake Capacitor station. The mine and process operations are supported by functional maintenance and administration infrastructure located on site as well as off-site locations for non-critical administrative functions. Select local access roads will be upgraded and maintained throughout the mine life.
Article content
The proposed tailings storage method is placement of dewatered material containing both tailings and minor amounts of process water. The minor proportion of Potential Acid Generating ('PAG') tailings will be managed within a dedicated conventional tailings lined cell contained within the tailings stack. NAG waste rock, PAG waste rock and over burden will be split by type and placed in suitably designed facilities that will be designed for physical stability and collect and manage run-off from the waste rock storage facilities. All facilities are located near the open pit mine to maximize efficiencies and minimize impact, subject to condemnation drilling.
Article content
Environmental and Community Matters
Article content
All exploration permits with the Government of British Columbia are in good standing. During its recent 2024 to 2025 exploration drill programs, the Company has regularly engaged communities and pro-actively sought shared benefits opportunities with each local to regional businesses, contractors and workers. The Company recognizes and respects the First Nations asserted aboriginal rights and title in the Project area and looks forward to continuing meaningful engagement with each First Nation on our proposed next steps to advance the Project. The Company has continued baseline studies during the PEA on the climate and waterways. Further work is anticipated during the next stages of advancement due to the new vision proposed in the PEA for a larger scale operation and associated tailings, waste and water management facilities as compared to the 2021 PFS.
Article content
Opportunities and Future Work
Article content
Ausenco, the team of consultants, and the Company have identified several areas and opportunities that may provide significant costs savings and improved economics for the Project. Post-PEA the Company will embark on additional technical work and engineering studies to better position and further de-risk the Project, including but not limited to the following:
Article content
Mining
Article content
Optimization of the pit phasing and mine production schedule, especially as the Mineral Resource is modified through further exploration and infill drilling;
Optimization of the open-pit design through collection of additional geotechnical information;
Further work to increase confidence in the Mineral Resource and lead to the definition of a Mineral Reserve;
Detailed equipment costing to determine potential discounts to list price for all major components, as well as review purchase versus leasing options for mining equipment;
Further planned electrification of the mine fleet, specifically the mine hauling function, as cutting-edge technologies for battery and trolley operations become commercialized in the near future; and
Back-filling of waste rock into the open pit.
Article content
Milling and Metallurgy
Article content
Additional metallurgical work to optimize results from geometallurgical domains and continue research on the optimum grind size, analyze recoveries of the gold and silver, and the effects of the higher grade coming from the mineral sorters on metal recoveries;
Optimize reagents to reduce costs and improve metallurgy;
Investigate the potential for a gold recovery circuit from a pyrite concentrate not currently in the PEA; and
Ore sorting of low grade for expansion scenarios.
Article content
Tailings Storage and Waste Rock Facilities
Article content
Detailed analysis of tailings storage and waste rock storage facilities for an integrated waste management plan and design to optimize the management of mine-impacted runoff and associated collection and treatment costs;
Phasing of tailings and water storage starter structures to reduce initial capex;
Alternative water treatment solutions being considered to the included reverse osmosis that meet BC discharge regulations; and
Whole tailings belt filtration options to dewater tails before placement.
Article content
Other
Article content
Construction camp location, and a trade-off study between at site accommodation versus daily commutes to the Project from local communities;
Investigate regional quarry sites and quality of quarry material for construction purposes, notably the tailing storage facility;
Water supply for the Project, and a trade-off study between a constructed reservoir with Project infrastructure or a water pipeline from a local source; and
Addition of the 2025 drill results and Phoenix maiden resource.
Article content
Changes to the conceptual mine plan and mine design that may be recommended in the PEA study, if approved and implemented as the Project moves forward, could impact the capital and operating costs, profitability and cash flows and an eventual timeline to production, the impact of which cannot be quantified at this time. As a result, there are additional uncertainties with respect to the size and grade of the Mineral Resources that may become Mineral Reserves in the future, and that will serve as the basis for future studies.
Article content
In addition, the Company will continue to conduct exploration activities within the 11,633-hectare ('ha') SMG mineral claims property which encompasses the estimated MRE, which the PEA is based upon. The objective of continuing regional exploration is to develop and assess targets that could further maximize the Company's flexibility with respect to future development decisions on the Project.
Article content
Investors should be cautioned that there is no guarantee that the future construction and development of the Project that will be completed in accordance with the 2025 PEA results set forward in this news release. There is no certainty that production will begin, or that operating capital, or that financial results will be consistent with the 2025 PEA.
Article content
Technical Information and Quality Control & Quality Assurance ('QAQC')
Article content
Once received from the drill and processed, all drill core samples were sawn in half, labeled, and bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and reference materials, for all sample shipments to monitor laboratory performance. Standards and blanks account for a minimum of 15% of the samples in addition to the laboratory's internal quality assurance programs. The QAQC program was overseen by the Company's Qualified Person, Julian Manco, P.Geo, Director of Exploration (as described below).
Article content
Drill core samples from the 2025 drill program were submitted to MSALABS' analytical facility in Prince George, British Columbia, for sample preparation and PhotonAssay TM analysis. The MSALABS facilities are accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with all analytical methods incorporating quality control materials at defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of the Company. Details on the historical assay work before 2025 will be included in the 43-101 Technical Report to be published within 45 days.
Article content
PhotonAssay TM
Article content
The PhotonAssay TM method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay TM instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing crushed core and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1).
Article content
The PhotonAssay TM instrument bombards 400 to 600-gram samples contained in sealed containers with gamma rays. These containers remain sealed throughout the process, preserving the sample for potential further testing. The analysis is performed robotically, with results that integrate into existing laboratory management systems.
Article content
Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed to ensure accurate and reliable results.
Article content
The method offers a gold detection range from 0.015 parts per million (ppm – lower limit) to 10,000 ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results reviewed by a competent person before reporting.
Article content
Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of PhotonAssay TM results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish).
Article content
QAQC Testing typically can include the following spot checks: 1) Pulverizing tests to evaluate variability in sample preparation, 2) Cross-analysis at external laboratories using screen metallic method, and 3) Four-cycle radiation testing to identify and calibrate potential variability in gold results with variable radiation intensity.
Article content
To effectively manage the nugget effect on high-grade gold samples MSALABS tested samples to 'extinction' (CPA-Au1E method). This approach divides samples into multiple splits, analyzes each separately using PhotonAssay TM, and then calculates a weighted average of the results. By testing various portions of the sample independently and combining their values proportionally, this method provides significantly more representative gold values than traditional single-split analysis for samples with a large nugget effect.
Article content
Multi-Elemental Analysis
Article content
For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-element determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis.
Article content
Key Process Steps:
Article content
Sample Preparation: Samples are dried and ground to specific criteria (85% passing 75 microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required.
Article content
Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric acids, followed by dilution with deionized water. Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification. Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for spectral interferences and thorough review before final reporting.
Article content
Qualified Persons
Article content
Various consultants provided input and helped write the forthcoming PEA Technical Report. Consultants that are responsible for elements of the Technical Report are independent qualified persons ('QP') as defined within NI 43-101.
Article content
Geology: Ron Voordouw, P.Geo., Equity Exploration
Mineral Resource for Main Deposit: Bahram Bahrami, P.Geo., Equity Exploration
Mineral Resource for Phoenix Deposit: Bahram Bahrami, P.Geo., Equity Exploration
Metallurgy, Processing, Infrastructure, and Economic Evaluation: Kevin Murray, P.Eng., Ausenco
Mining: Marc Schulte, P.Eng., Moose Mountain Technical Services
Tailings and Water Management: Brad Russell, P.Eng., BGC
Water Treatment: Lee Josslyn, PE, Linkan Engineering
Geochemistry: Andrea Samuels, P.Geo., pHase Geochemistry
Off-site Power and Electrical: Neil Brazier, P.Eng., WN Brazier Associates
Environmental & Community: James Millard, P.Geo., Ausenco
Article content
The QPs have reviewed the information in this news release that pertain to the sections of the forthcoming PEA Technical Report for which they are responsible. All scientific and technical information in this press release in respect of the PEA is based on information prepared by or under the supervision of those individuals. The Mineral Resource estimate in this news release has been classified in accordance with CIM Definition Standards – For Mineral Resources and Mineral Reserves (May 14, 2014) and CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (November 29, 2019).
Article content
In accordance with NI 43-101, the PEA Technical Report will be filed on SEDAR within 45 days of the disclosure of this news release.
Article content
Julian Manco, M.Sc., P.Geo., Director of Exploration with Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed and has approved the contents of this news release.
Article content
About the Company
Article content
Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold Project (Project) towards construction of the next gold mine in the Cariboo Gold Corridor, British Columbia. The Company will publish, within 45 days of this news release, a new NI 43-101 Technical Report setting out the new executable vision to advance the Project. This new NI 43-101 Technical Report, with a de-risked and optimized Preliminary Economic Assessment (PEA) with an updated Mineral Resource Estimate (MRE), will supersede the prior technical report of the Company. Upon receipt of the new PEA and updated MRE, the Company will decide the next steps to advance the Project to position the Company to make a construction decision in or before 2027. We are striving to be a leader in community and Indigenous relations by leveraging technology and innovation to build the 'greenest' gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities. Details of the Company are available on www.sedarplus.ca and on the Company's website: www.spanishmountaingold.com.
Article content
All Mineral Resource estimates of the Company disclosed or referenced in this news release have been prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ('CIM') Definition Standards on Mineral Resources and Mineral Reserves dated May 10, 2014 ('2014 CIM Definition Standards'), whose definitions are incorporated by reference in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ('NI 43-101'):
Article content
Mineral resource: is a concentration or occurrence of material of economic interest in or on the earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable.
Article content
Inferred mineral resource: is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.
Article content
Indicated mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. An indicated mineral resource has a lower level of confidence than that applying to a measured mineral resource and may only be converted to a probable mineral reserve.
Article content
Measured mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. A measured mineral resource has a higher level of confidence than that applying to either an indicated mineral resource or an inferred mineral resource. It may be converted to a proven mineral reserve or to a probable mineral reserve.
Article content
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Article content
FORWARD-LOOKING INFORMATION:
Article content
Certain of the statements and information in this press release constitute 'forward-looking information'. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as 'expects', 'anticipates', 'believes', 'plans', 'estimates', 'intends', 'targets', 'goals', 'forecasts', 'objectives', 'potential' or variations thereof or stating that certain actions, events or results 'may', 'could', 'would', 'might' or 'will' be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to information with respect to, the potential to extend mineralization within the near-surface environment; the potential to expand resources and to find higher-grade mineralization at depth; the timing, size and budget of a winter drill program, and the results thereof; and the delivery of a maiden resource for the Phoenix Deposit within the Phoenix Target, and the timing and results thereof. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.
Article content
APPENDIX A
Article content
The 2025 PEA incorporates several important improvements and de-risking initiatives compared to the 2021 Prefeasibility Study, all of which better positions the Project for a successful next phase of development. Notable changes include:
Article content
Larger Project Scale: The project has increased the production rate from 20 ktpd to 26 ktpd, which increases the LOM average gold production profile by 19% to 122 koz per year, and 203 koz per year in the first five years. For the project, this will bring greater efficiency, lower unit costs, and uplift to the NPV, in addition to expanding Life of Mine (LOM) to 24.5 years and total gold production to 3.0Moz. Pre-concentration of mill feed to uplift feed grade to the proposed 26 ktpd mill such as mineralized material sorting was investigated during the PEA. It was identified as a target case opportunity to 'bolt-on' to the base case which will be further assessed during the next stages of project development.
Article content
Improved Flowsheet Design: Updated metallurgical studies and testing has resulted in modification to a coarse mill feed floatation circuit with cleaner and scavenger stages and two gravity circuits, lowering power costs while boosting throughput These circuit modifications, when combined with a rougher and cleaner flotation circuit, resulted in overall project gold recovery of 89.3% with approximately 20% of gold expected to be recovered by gravity.
Article content
Optimized Open Pit Mine Design: Through targeting lower strip ratios based upon improved geotechnical assessments, additional resource included in the mine plan and better stockpile management, an optimum open pit was selected to maximize efficiency. A selective mining unit (SMU) analysis was completed on bench mining dimensions, block model block sizes and equipment sizing, selection concluding that larger 240 t class trucks and associated fleet are optimal for the project. This also means higher productivities and less cost moving material to either the process plant or waste rock pads are possible. The LOM waste to resource strip ratio reduces to 2:1 in the PEA from 4:1 in the PFS.
Article content
Electrification: The future electrification of the mine and equipment is expected to increase productivity with a significantly lower carbon intensity. The upsized power from 30 MW in the PFS to 60 MW included in the PEA is expected to potentially support the future electrification of the mine fleet and equipment. Equipment proposed in the PEA includes renewable diesel capable haul trucks and electrification of drills and shovels.
Article content
New Tailings Stack: With coarser sized tailings material from coarse mill feed floatation, screening and filtered tailings, dewatering and placement of landforms has been selected. This is expected to result in improved geotechnical stability and enabling a safer site. This Tailings Stack location avoids the large Cedar Creek water catchment. As well, moving from a conventional slurry containment to a free draining, filtered tails means this coarser product minimizes borrow pit and starter dyke construction costs, meaning more placement flexibility and reduced starter material costs while lowering the potential for mineral endowment sterilization.
Article content
Mineral Resource Estimate: Constrained geological interpretation and estimation methodology resulted in a decrease of the Main deposit Indicated and Inferred contained gold ounces. The decrease of Inferred total contained gold ounces of the Main deposit are partially offset by an increase of Inferred contained gold ounces of the Phoenix deposit. The Main deposit and Phoenix deposit show potential for resource expansion and classification uplift.
Article content
APPENDIX B
Article content
In this news release the Company uses certain abbreviations, including: net present value ('NPV'); NPV at a 5% discount rate ('NPV5%'); internal rate of return ('IRR'); measured and indicated ('M&I'); million ('m'); thousand ('k'); metric tonne ('t'); troy ounce ('oz'); grams per tonne ('g/t'); gold ('Au'); silver ('Ag'); life of mine ('LOM'); tonnes per day ('tpd'); free cash flow ('FCF'); years ('yrs'); per annum ('pa'); average ('avg.'); life-of-mine ('LOM'); versus ('vs.'); non acid generating ('NAG'); potentially acid generating ('PAG').
Payback is calculated from commercial production, which is defined as the achievement of reaching a minimum of 30 consecutive days of operations during which the mill operated at an average of 60% of nameplate throughput of 26,000 tpd.
Spot price is based on the LBMA gold price as of the close of business on July 1, 2025, rounded down to the nearest $100/oz for gold and $1/oz for silver.
Article content
USE OF NON-GAAP MEASURES
Article content
Certain financial measures referred to in this news release are not measures recognized under IFRS and are referred to as non-GAAP financial measures or ratios. These measures have no standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. The definitions established and calculations performed by Ausenco are based on the QP's reasonable judgement and are consistently applied. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS.
Article content
The non-GAAP financial measures used in this news release and common to the gold mining industry are cash costs and all-in sustaining cost per ounce of gold produced and free cash flow.
Article content
Free cash flow, Cash costs, and All-in sustaining cost per ounce of gold sold are non-GAAP financial measures or ratios and have no standardized meaning under IFRS Accounting Standards ('IFRS') and may not be comparable to similar measures used by other issuers. As the Company is not in production, the Company does not have historical non-GAAP financial measures nor historical comparable measures under IFRS, and therefore the foregoing prospective non-GAAP financial measures or ratios may not be reconciled to the nearest comparable measures under IFRS.
Article content
Cash Costs consist of mining costs, processing costs, mine-level G&A, offsite charges, and royalties less by-product credits.
Article content
All-In Sustaining Costs (AISC) includes cash costs plus sustaining capital, closure costs, and salvage credits.
Article content
Free cash flow is calculated as after-tax cash flow from mine-site operating activities less capital expenditures, including closure costs (net of salvage value).
Article content
APPENDIX C
Article content
The estimation methodology for the Main Deposit is similar to Phoenix Deposit except for: (1) outlier restrictions for the lithology domains use higher gold thresholds (3 g/t vs 0.2 g/t) with different search distance criteria (20-33% vs 30% of range); (2) boundary treatment applies semi-hard boundaries with uniform thresholds (15-25m) to lithological domains while mineralized domains used hard boundaries for initial passes, whereas Phoenix applied semi-hard boundaries to specific lithological contacts with variable thresholds (5-50m); (3) grade estimation uses exclusively ID3 interpolation instead of the hybrid OK/ID3 approach; (4) resource classification employs more stringent drill hole spacing requirements (≤30m/≤70m/≤138m vs ≤70m/≤155m) and incorporates Sequential Gaussian simulation for statistical validation; and (5) includes Measured resource classification not reported for the Phoenix Deposit.
Article content
Article content
Article content
Article content
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Globe and Mail
29 minutes ago
- Globe and Mail
AbbVie Rises 11.5% in a Month: Buy, Hold or Sell the Stock?
AbbVie 's ABBV stock has risen 11.5% in the past month, mainly due to its beat-and-raise performance in the second quarter. AbbVie announced its second-quarter results on July 31. It beat estimates for both earnings and sales. Earnings of $2.97 per share rose 12.1% year over year. Revenues of $15.42 billion rose 6.6% year over year on a reported basis, driven by robust sales of key drugs like Rinvoq, Skyrizi, Venclexta and Vraylar, coupled with significant contributions from newer drugs, namely Ubrelvy, Elahere, Epkinly and Qulipta. Sales of Humira and Imbruvica declined year over year. AbbVie also raised its revenue and EPS guidance for 2025 for the second time this year, backed by a strong momentum in the first half. The company expects adjusted EPS to be in the range of $11.88-$12.08, up from the previous guidance of $11.67-$11.87. Total revenues are expected to be approximately $60.5 billion, higher than the previous expectation of $59.7 billion. However, a single quarter's results are not so important for long-term investors, and the focus should rather be on the company's strong fundamentals. Let's understand the company's strengths and weaknesses to better analyze how to play ABBV stock amid the post-earnings price gain. ABBV's Successful New Drugs — Skyrizi and Rinvoq AbbVie lost patent protection for its blockbuster drug, Humira, in the United States in January 2023 and in the EU in 2018. Humira's sales are declining due to loss of exclusivity ('LOE') and biosimilar erosion. However, AbbVie has successfully navigated the LOE of Humira by launching two other successful new immunology medicines, Skyrizi and Rinvoq, which are performing extremely well, bolstered by approvals in new indications and are expected to support top-line growth in the next few years. Sales of Skyrizi and Rinvoq have successfully replaced Humira, which once generated more than 50% of its total revenues. Skyrizi and Rinvoq generated combined sales of $11.6 billion in the first half of 2025. The drugs are seeing strong performance across all approved indications, especially in the popular inflammatory bowel disease (IBD) space, which includes two conditions — ulcerative colitis (UC) and Crohn's disease (CD). Importantly, Skyrizi and Rinvoq have demonstrated compelling head-to-head data against several novel therapies in clinical studies, which have given them a competitive advantage. Skyrizi sales are now annualizing at almost $18 billion and Rinvoq at over $8 billion. AbbVie expects combined sales of Skyrizi and Rinvoq to be more than $25 billion in 2025 and more than $31 billion by 2027(Skyrizi: more than $20 billion; Rinvoq: more than $11 billion). Strong immunology market growth, market share gains and momentum from new indications, such as the recent launch of Skyrizi in UC, as well as the potential for five new indications for Rinvoq over the next few years, are expected to drive these drugs' growth. AbbVie expects to file a regulatory submission for Rinvoq for the alopecia areata indication later this year. In addition, phase III data with Rinvoq in vitiligo are expected later in 2025, followed by hidradenitis suppurativa and systemic lupus erythematosus Phase III readouts in 2026. AbbVie believes that the next wave of potential approvals for Rinvoq could add roughly $2 billion to peak-year sales for the product. ABBV's Growing Oncology Portfolio AbbVie has built a substantial oncology franchise with Imbruvica and Venclexta. Its oncology segment generated combined revenues of $3.3 billion in the first half of 2025, up 4.2% year over year as higher sales of Venclexta and contributions from new drugs, Elahere and Epkinly, more than offset the decline in Imbruvica sales. Some key oncology drugs approved in the past couple of years are Epkinly and Emrelis. Elahere was added to AbbVie's oncology portfolio with the February 2024 acquisition of Immunogen. AbbVie is also strengthening its portfolio of oncology medicines with the addition of antibody-drug conjugates or ADCs, which are being considered a disruptive innovation in the pharmaceutical industry. ADCs will allow better treatment of cancer by harnessing the targeting power of antibodies to deliver cytotoxic molecule drugs to tumors. The company now has two ADCs in its commercial portfolio (i.e., Elahere and Emrelis) and two additional ADCs in late-stage development (ABBV-400 and pivekimab sunirine), along with some others in early-stage development. AbbVie's neuroscience portfolio is also contributing to top-line growth. Sales of its neuroscience drugs increased 20.3% to almost $5 billion in the first half of 2025, driven by higher sales of Botox Therapeutic, depression drug Vraylar and newer migraine drugs Ubrelvy and Qulipta. AbbVie on an Acquisition Spree AbbVie has been on an acquisition spree in the past couple of years to bolster the early-stage pipeline that should drive long-term growth. Particularly, it is signing several M&A deals in the immunology space, its core area, while also signing some early-stage deals in oncology and neuroscience areas. AbbVie has executed more than 30 M&A transactions since the beginning of 2024. A key deal was the April 2025 licensing agreement with Denmark's Gubra to develop GUB014295 (ABBV-295), a long-acting amylin analog for the treatment of obesity. The deal marked AbbVie's entry into the obesity space, dominated by Eli Lilly LLY and Novo Nordisk NVO. AbbVie plans to invest further in obesity. AbbVie recently closed the acquisition of privately held biotech Capstan Therapeutics, which will add Capstan's lead asset, CPTX2309 — a potential first-in-class in vivo tLNP anti-CD19 CAR-T therapy — to its immunology pipeline. ABBV's Slowing Aesthetics Sales & Humira Erosion Sales of AbbVie's blockbuster drug Humira are declining due to biosimilar erosion. The launch of Humira biosimilars in the United States in 2023 significantly eroded the drug's sales in 2024, with the decline being sharper in 2025 as more plans excluded branded Humira and moved to exclusive biosimilar contracts. Humira sales declined more than 50% in the first half of 2025. AbbVie expects Humira's access in the United States to continue to decrease through the second half as more plans select exclusionary formularies for existing patients. AbbVie is seeing declining sales of Juvederm fillers due to continued macro challenges and weakened consumer sentiment. The slowing growth of the U.S. facial injectables market and persistent economic headwinds, which are impacting consumer spending in some countries, including the United States, are hurting sales of Juvederm due to its higher price point. Juvederm sales declined 22.2% in the first half of 2025. ABBV Stock Price, Valuation and Estimate Revision AbbVie's stock has gained 19.3% so far this year against a decrease of 1.1% for the industry. The stock has also outperformed the sector and the S&P 500 index, as seen in the chart below. ABBV Stock Outperforms Industry, Sector & S&P 500 From a valuation standpoint, AbbVie is not very cheap. Going by the price/earnings ratio, the company's shares currently trade at 15.31 forward earnings, higher than 14.46 for the industry. The stock is cheaper than some other large drugmakers like Eli Lilly, AstraZeneca and J&J, but is priced much higher than most other large drugmakers. The stock is also trading above its five-year mean of 12.68. ABBV Stock Valuation The Zacks Consensus Estimate for 2025 earnings has declined from $12.03 per share to $12.02, while that for 2026 has increased from $14.08 to $14.31 per share over the past 30 days. ABBV Estimate Movement Stay Invested in ABBV Stock Though AbbVie faces its share of near-term headwinds, the company has faced its biggest challenge — Humira's patent cliff — quite well and looks well-positioned for continued strong growth in the years ahead. AbbVie is returning to robust revenue growth in 2025, which is just the second year following the U.S. Humira LOE, driven by its ex-Humira platform. Sales of AbbVie's ex-Humira drugs rose more than 22% (on a reported basis) in the quarter, driven by Skyrizi, Rinvoq and neuroscience drugs. Boosted by its new product launches, AbbVie expects to return to mid-single-digit revenue growth in 2025 with a high single-digit CAGR through 2029, as the company has no significant LOE events for the rest of this decade. A substantial portion of this growth is expected to be driven by the robust performance of Skyrizi and Rinvoq. With no significant LOEs in this decade, AbbVie enjoys the flexibility to invest more in R&D to continue to acquire external innovation. Rising stock price and estimates (for 2026), its solid pipeline and the fact that it is entering the second half of the year with substantial momentum are good enough reasons to stay invested in this Zacks Rank #3 (Hold) stock. You can see the complete list of today's Zacks #1 Rank (Strong Buy) stocks here. #1 Semiconductor Stock to Buy (Not NVDA) The incredible demand for data is fueling the market's next digital gold rush. As data centers continue to be built and constantly upgraded, the companies that provide the hardware for these behemoths will become the NVIDIAs of tomorrow. One under-the-radar chipmaker is uniquely positioned to take advantage of the next growth stage of this market. It specializes in semiconductor products that titans like NVIDIA don't build. It's just beginning to enter the spotlight, which is exactly where you want to be. See This Stock Now for Free >> Want the latest recommendations from Zacks Investment Research? Today, you can download 7 Best Stocks for the Next 30 Days. Novo Nordisk A/S (NVO): Free Stock Analysis Report Eli Lilly and Company (LLY): Free Stock Analysis Report AbbVie Inc. (ABBV): Free Stock Analysis Report

Globe and Mail
29 minutes ago
- Globe and Mail
Market Factors: Natural gas setup looks really promising
In this edition of Market Factors we start with why the depressed natural gas sector may turn out to be a huge opportunity. In part two, a prominent strategist is seeing cracks in the megacap market leadership. And the diversion looks at my favourite movie soundtracks. I've been touting the growth story in natural gas while the commodity price hovers near 25-year lows, so I suppose I owe readers an explanation. I not only believe in the story, but also think things are progressing in a way that will be extremely lucrative for investors if the 2026 demand outlook unfolds as predicted. Natural gas production has significantly exceeded demand this year and this successfully smothered the commodity price. The current end of summer inventory levels are close to record highs thanks to year-to-date production increases of over a billion cubic feet per day. On Tuesday, BofA Securities commodity strategist Clifton White wrote that since 2019, Western Canada natural gas demand growth has come almost exclusively from industrial companies and utilities. Demand from these sources has flagged, increasing oversupply conditions. Now for the good news for investors. Historically the only outlets for domestic natural gas production were pipelines flowing to the U.S. and Eastern Canada. Now, however, the LNG Canada facility on the B.C. coast is operational and gives Canadian gas producers access to global markets. Mr. White believes that LNG Canada 'will cause Western Canada inventories to flip from near record highs this fall to near 10-years lows by the end of summer 2026 [and this] … will lead to stronger AECO prices and fewer Canadian exports to the U.S. next year.' For the natural gas sector, business conditions are bad now and forecast to get much better next year. Theoretically, an investor might be able to find a related stock at depressed prices now, and benefit as conditions improve. We should have a few months of research to attempt to uncover this opportunity. The accompanying table using RBC Capital Markets data can provide a guide to further study. Each stock's leverage to gas prices, valuations in terms of enterprise value to debt-adjusted cash flow and recent performance are included. As always, there are risks for investors. Global natural gas demand, operational issues at LNG Canada and excess production are only three potential events that could screw up this potentially profitable trade. It is still worth further study in my opinion. Megacap stocks have dominated markets since 2015 but one strategist now sees cracks in the trend. A shift in the market cycle from a downturn stage into recovery means smaller cap stocks will retake market leadership, according to BofA's Savita Subramanian. Ms. Subramanian grouped the S&P 500 into deciles and noted that the last Nifty Fifty run – significant outperformance by the largest 50 companies – occurred in the late 1990s. Back then, the outperformance lasted six years and the largest companies outperformed the broader benchmark by 71 percentage points. Currently the biggest 50 stocks have outperformed the benchmark by 73 percentage points since 2015. The average balance sheet quality of today's top 50 is well below the late 1990s. Average valuations are near record highs while growth expectations are, despite the substantial growth forecasts for the magnificent seven, unspectacular overall. The switch to a recovery market cycle historically means that economically sensitive, higher beta (market sensitivity), smaller market cap stocks outperform. Ms. Subramanian expects stocks with lower valuations (in terms of forward PE ratios), above median beta, below median market cap and buy-rated at BofA to outperform. Her screen by these factors uncovered United Airlines Holdings Inc., Halliburton Co., Expedia Group Inc. and lululemon athletica Inc. The MakeUseOf site posted their picks for most underrated movie soundtracks and there are some interesting selections. I hadn't thought of The Last American Virgin as having great music but on review the soundtrack looks great. My picks for favourite soundtracks begin with John Hughes movies, notably the Eric Stoltz and Mary Stuart Masterson classic Some Kind of Wonderful. The Flesh for Lulu song I Go Crazy seals it for Some Kind of Wonderful because that song was impossible to find at the time. (The phenomenon of being completely unable to listen to a song you like must be inexplicable to modern generations. Led Zeppelin's Say Hey Woman was another example). Classics like Wizard of Oz and Singin' in the Rain must be mentioned when the soundtrack topic comes up. For the '80s Purple Rain and then in the '90s there's Singles. The High Fidelity soundtrack is quirky and amazing. Donnie Darko, Trainspotting, Grease, Saturday Night Fever are all notable. I just thought of The Commitments for the first time in at least 25 years because of its terrific and timeless music. What are your favourites? Looking for our updates on market movers, analyst actions, stock technicals, insider trades and other daily, weekly and monthly insight? Click here to visit our Inside the Market page. A look at how this week's inflation report has shifted market and economist views for future Bank of Canada rate cuts The latest Reuters polling of equity strategists and portfolio managers finds a bullish bunch when it comes to the TSX - but less so for the S&P 500 Jamie McGeever takes a closer look at how markets and Donald Trump are in a delicate policy dance Reuters' Ron Buosso on why the Ukraine outcome is insignificant for oil markets The data calendar starts with industrial product prices for July on Thursday when economists expect a 0.3 per cent month-over-month increase. Retail sales for June follows the next day and consensus is looking for a 1.5 per cent rise for the headline number and 0.8 per cent jump ex-autos. Bank earnings are the highlight for Canadian investors in the coming week. Bank of Montreal ($2.942 per share expected) and Bank of Nova Scotia ($1.73) report Tuesday. Royal Bank ($3.317) and National Bank ($2.675) post numbers Wednesday. Dollarama ($1.152) also reports next Wednesday. American economic data of importance begins Thursday with S&P Global U.S. Manufacturing PMI (49.7 expected), which provides an early look at August results. The leading index for July (-0.1 per cent month over month) is also out Thursday but that index has been providing deceptively negative results of late. Preliminary durable goods orders for July (-4.0 per cent month over month) will be released next Tuesday. We'll get corporate results from Walmart Inc. ($0.733) on Thursday and the 27th will see earnings reports from Crowdstrike Holdings Inc. ($0.832) and the big one, Nvidia Corp. ($1.005). See our full earnings and economic calendar here


CBC
30 minutes ago
- CBC
TikTok Canada is closing soon. The Beaches and bbno$ warn it will hurt homegrown artists
In 2021, a TikTok of Canadian rapper bbno$ raising his eyebrows to the beat of his single "Edamame" started gaining traction — and eventually changed the course of his career. The platform's Canadian team suggested he recreate the clip with a safari-themed filter, then helped push it globally. "When that happened, the song just skyrocketed," he says of the track, which features Indonesian rapper Rich Brian and went six-times Platinum in various countries. bbno$ is among several Canadian artists worried about losing social media support that can make or break their careers as TikTok prepares to comply with a federal order to shut down its operations in Canada. For Canadian musicians, TikTok can be as vital as radio play once was. Its algorithm lets songs leap borders instantly, offering emerging acts — especially racialized artists facing barriers in traditional channels — a shot at global reach. With Ottawa's dissolution order set to take effect soon, TikTok Canada's team has been running campaigns to show its value — and Canadian artists are rallying behind them. "Being an artist in this generation is like, you're basically a TikTokker," says the Juno-winning rapper, born Alexander Gumuchian. "Without having a TikTok team that I can relay information to — that could help me get banners, help me when things are starting to bubble — I'm losing ammunition to help fire my career up." Concerns around access to user data behind government's move In November 2024, Ottawa ordered TikTok's Canadian arm to dissolve following a national security review of its Chinese parent company, ByteDance Ltd., though the app will remain accessible in Canada. The order cited "national security risks" but a government spokesperson declined to provide specifics due to "confidentiality provisions." Social media researcher Philip Mai says there are concerns around potential Chinese government access to user data, foreign surveillance of Canadians in sensitive sectors and misuse of information for propaganda. "China's National Intelligence Law legally permits data access, raising plausible risk concerns," says the co-director of the Social Media Lab at the Ted Rogers School of Management. Canada has ordered TikTok's offices closed. Should you still be on the app? 10 months ago The federal government has ordered TikTok to close its offices in Canada because of national security concerns. CBC's Ashley Fraser explains what we know and don't know about that risk. Still, no public evidence shows TikTok has shared user data with the Chinese government, and the company denies it. Mai says shutting down TikTok Canada reduces its physical and legal presence in the country, limiting the platform's potential for data surveillance and its ability to influence policy or public opinion. "This strategy is less extreme than banning TikTok, but more than a slap on the wrist," he says. bbno$ says the platform's Canadian team has helped bolster his social media presence. Without it, he warns, many Canadian artists will face a "bottleneck" in their careers. Juno-winning Toronto band The Beaches says TikTok Canada has been "instrumental" in their rise. "Without local teams championing Canadian musicians internationally, we're left competing with American artists as outsiders, not as domestic talent," says the group in a statement. "This puts us at a disadvantage and pushes Canadian artists to leave the country just to have a shot at global success." Though The Beaches have enjoyed Canadian radio airplay for years, their single "Blame Brett" went viral on TikTok in 2023, helping them reach the U.S. Billboard charts for the first time. Mai warns TikTok Canada's closure would be a "big blow to Canadian artists," reducing opportunities, support systems, grant programs and sponsorships. "Forcing the closure of TikTok's Canadian operation will likely decrease Canadian visibility in the algorithm," he says, noting local staff often boost regional content via tailored campaigns, including ones highlighting Indigenous creators. Last month, TikTok CEO Steven Chew asked Minister of Industry Melanie Joly for an urgent meeting, warning that shutting down TikTok Canada would force layoffs, halt investments and pull support from creators and culture. "The wind-up process is rapidly approaching a critical juncture," Chew wrote. TikTok declined to provide a date and to say whether it has heard back from Joly, who did not respond to questions about the meeting request. Loss for racialized alum of TikTok's Accelerator program, creators say The platform recently withdrew sponsorships for several Canadian arts institutions, including the Juno Awards and TIFF, and slashed the National Screen Institute's TikTok Accelerator for Indigenous Creators, which has supported nearly 400 participants since 2021. Indigenous hoop dancer James Jones says the federal government's shutdown order shows a disregard for the country's digital creators. "It's really unfortunate that they are taking away a team that has been so supportive of the BIPOC community and the Indigenous community," says the Edmonton-based creator, who boasts over four million followers. "I don't think that anyone has ever asked us what we wanted or even reached out and said, `Hey, how is this going to affect you?"' Jones says early in his career, TikTok Canada offered advice on maximizing his reach and facilitating key connections with brands and publications. He says its Accelerator program has helped many Indigenous creators and small businesses. Jones feels the government is sending a message that "we're not being prioritized." "They don't care what happens to us, they don't care about our businesses, our brands," he says. "They don't care about how it affects us personally to not have access to a team that supports us directly." Vanessa Brousseau, an advocate for missing and murdered Indigenous people, says the government's decision feels "really painful, but familiar." "It feels like a pattern and a way of oppressing minorities, oppressing Indigenous people," says the alum of the TikTok Accelerator for Indigenous Creators. "TikTok is the only platform that amplifies our voices and makes sure we're being heard." Brousseau worries that if the decision isn't reversed, it will be "very detrimental" to Indigenous TikTok creators.