
BEST bus gets stuck in Mumbai's Girgaon after road caves in; MMRCL blames underground water leak
MUMBAI: A BEST bus got stuck in a pit on Dr Babasaheb Jaykar Marg near the Girgaon Metro Line 3 rehabilitation site on Monday morning, after continuous rain caused the road to collapse and its rear tyre to sink into a depression.
Tired of too many ads? go ad free now
The incident took place near Thakurdwar, above the under-construction site.
No injuries or casualties were reported, and all passengers were safely evacuated from the bus shortly after the incident.
According to BEST spokesperson Sudas Sawant, 'Our bus on route 121 from the Backbay Depot got stuck around 10 am today. No passengers on the bus were injured. As the bus belongs to a private contractor, Tata, the company's officials have been instructed to promptly remove the bus from the pit.'
According to sources, the bus was later pulled out and towed away.
Mumbai Metro Rail Corporation Ltd (MMRCL) stated that water had entered the basement pit of the proposed rehabilitation building, likely due to a leak from a nearby underground utility line. This may have caused erosion beneath the surface, leading to the cavity that was not visible from above.
'The cavity was not visible on the surface. The incident occurred early in the morning and was managed swiftly,' said an MMRCL official.
MMRCL is working with Brihanmumbai Municipal Corporation (BMC) to identify and repair any leaks in the area's water main, sewer line, or storm water drain (SWD) system.
Officials said that repairs to the damaged road section are in progress, and steps are being taken to prevent a repeat of such incidents.
The Girgaon site is one of several locations where rehabilitation buildings are being developed for Metro Line 3, which will link Colaba to SEEPZ via Bandra, forming an underground north–south rapid transit route through Mumbai.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
12 hours ago
- Indian Express
Bus gets stuck in road cave-in near Girgaon Metro site, none injured
A Brihanmumbai Electric Supply and Transport (BEST) electric bus got stuck in a road cave-in close to the Girgaon Metro construction site Monday morning, leaving passengers in panic. While no one was injured, there were around 40 passengers in the bus. The accident occurred about 9.30 am near the intersection of Dr Babasaheb Jaykar Marg and Jagannath Shankar Sheth (JSS) Road opposite the Thakurdwar signal, where construction is underway for Metro Line 3 underground Girgaon station. As per BEST officials, the rear left wheel of the bus, which was plying on route number 121 from Backbay Depot to J Mehta Marg, got stuck in a cave-in on the road. The electric bus runs under the banner of Tata Group company in BEST fleet. All the passengers were rescued safely, officials confirmed. 'No passenger was hurt in the accident,' said a BEST official. 'The bus was recovered with the help of a towing van and taken back to the depot.' Several local residents and eyewitnesses alleged that the pit was almost five-feet deep. The Mumbai Metro Rail Corporation Limited (MMRCL), which is developing the underground corridor, stated the cave-in is believed to have been due to water ingress in the basement pit of an adjacent under-construction building. 'Water ingress was observed in the basement pit of the proposed Girgaon rehabilitation building, likely due to a nearby utility leakage. This seems to have caused ground-loss, forming a cavity that was not visible on the surface,' the MMRCL said in a statement. The agency added that it is also coordinating with Brihanmumbai Municipal Corporation (BMC) officials to detect and seal any leakage in water mains, sewer lines or the storm water drainage system. 'Necessary measures are being taken to reinstate the affected road section at the earliest and to prevent any recurrence,' MMRCL added.


Indian Express
14 hours ago
- Indian Express
Need to use Ahmedabad crash as ‘act of force' to build a safer Air India: Tata group chairman Chandrasekaran
Tata group and Air India Chairman N Chandrasekaran on Monday asked the airline's employees to stay strong and use last week's crash of the airline's Boeing 787-8 aircraft in Ahmedabad as 'an act of force to build a safer airline', according to sources. Chandrasekaran also told Air India employees that while the reasons behind the crash will be known only once the investigation is complete, they should 'stay the course' and not put their 'shoulders down' in the face of criticism. Chandrasekaran addressed around 700 Air India employees and its leadership team on Monday at the company headquarters and its training academy in Gurugram. According to sources, he later met Civil Aviation Minister K Ram Mohan Naidu at the Ministry of Civil Aviation (MoCA) in the Capital, and held discussions. 'Criticisms are there, and those of us who are very passionate…who are working on making this airline a great airline, and who genuinely care about what kind of a company we want to build, but it's not easy to face criticisms. I want you to be strong. If you feel distraught, the word you should remember is determination. We are going to get through this. We need to show resilience. We need to use this incident as an act of force to build a safer airline,' Chandrasekaran is learnt to have said. According to sources, the Tata group chairman told Air India staff that the Ahmedabad air crash is the 'most heartbreaking crisis' he has seen in his career. All but one of the 242 people on board the doomed aircraft perished in Thursday's crash. There were a number of casualties on the ground as well. The accidents was the worst aviation disaster involving an Indian carrier in four decades. It is also the first crash of the Boeing 787 globally. 'I went to the site on that day…it was not easy at all. I know many of you here in this room are part of the emergency response team, may be even at the site or were handling all the shocks of that day…Whatever I say and whatever we do is not going to bring the lives back. Those affected, they are going to feel the pain for a very long time. But having said that, we have got to do our very best humanly possible to help each of them,' Chandrasekaran said, according to sources. 'It's a very complex business…it's a complex machine, so a lot of redundancies, checks and balances, certifications, which have been perfected over years and years. Yet this happens, so we will figure out why it happens after the investigation. So we just have to stay calm and not put your shoulders down. This is the time to be brave, time to be resolute, time to know that you have the full support,' he is learnt to have told employees. According to sources, the Tata group chairman assured Air India employees that the company will get through the current challenges, saying that their job is get Air India to a better place. 'Big things get done by small actions. Every small action that you do and is executed perfectly helps the collective thing flourish. That's why we continue to focus on doing each of our jobs and with all humility. That's what should be our goal. Just stay the course,' he said, as per sources. Sukalp Sharma is a Senior Assistant Editor with The Indian Express and writes on a host of subjects and sectors, notably energy and aviation. He has over 13 years of experience in journalism with a body of work spanning areas like politics, development, equity markets, corporates, trade, and economic policy. He considers himself an above-average photographer, which goes well with his love for travel. ... Read More


The Print
21 hours ago
- The Print
Bus gets stuck in pit near Metro construction site in Mumbai; none hurt
As per initial information, the incident occurred on Dr Babasaheb Jaykar Marg at Thakurdwar near the Girgaon Metro station site, where work on Mumbai Metro Line 3 is underway. No casualty was reported, they said, adding all the passengers were safely evacuated from the bus belonging to the Brihanmumbai Electric Supply and Transport (BEST) undertaking. Mumbai, Jun 16 (PTI) A BEST electric midi bus got stuck in a pit near a Metro construction site at Girgaon in south Mumbai on Monday morning, officials said. The rear portion of the bus got stuck in the pit due to a road which had partially caved-in, a civic official said. Some locals alleged a nearly five-foot-deep pit was created due to the ongoing Metro work. A spokesperson of the Mumbai Metro Rail Corporation (MMRC) said they were looking into the incident. BEST spokesperson Sudas Sawant said he was trying to connect with the officials concerned for details of the incident. PTI KK GK This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.