
NGEx Discovers Major Copper-Gold Porphyry System at Lunahuasi, Drills 1,619.4m at 0.87% CuEq including 876.4m at 1.13% CuEq
VANCOUVER, BC, May 21, 2025 /CNW/ - NGEx Minerals Ltd. ("NGEx", "NGEx Minerals" or the "Company") (TSX: NGEX) (OTCQX: NGXXF) is pleased to announce the discovery of a major new copper-gold porphyry system at its 100% owned Lunahuasi high-grade copper-gold-silver project in San Juan, Argentina. This discovery confirms our interpretation of the geological setting of the Lunahuasi mineralization and opens up an entirely new, very large-scale exploration target at the project. Drillhole DPDH027 demonstrates that the Lunahuasi system has similar size and scale potential to other deposits in the Vicuña cluster, with the added advantage of the large, very high-grade copper-gold-silver high-sulphidation ("HS") epithermal structures which are unique to Lunahuasi. PDF Version
View PDF
Highlights:
Drillhole DPDH027 drilled across the HS zone before entering a porphyry copper-gold deposit at about 1,262m. The hole ended in mineralization at a depth of 2,005m and the full scale of the system remains unknown. The hole intersected:
1,619.40m at 0.87% copper equivalent ("CuEq") from 385.60m, including:
876.40m at 1.13% CuEq from 385.60m in disseminated, stockwork and lode high-sulphidation mineralization, including:
205.05m at 2.04% CuEq from 590.65m, plus:
743.00m at 0.56% CuEq from 1,262.00m in porphyry-style mineralization cut by discreet high-sulphidation zones, including:
18.00m at 2.68% CuEq from 1,343.00m
17.80m at 1.23% CuEq from 1,495.20m
Drillhole DPDH029 is the southernmost hole drilled to date at Lunahuasi. It intersected the HS zone over its entire length, with early porphyry veins occurring from 1,100m providing a clear vector towards the porphyry to the west of the end of the hole. The hole intersected:
Wojtek Wodzicki, President and CEO, commented, "Drillhole DPDH027 opens up an entirely new dimension of the Lunahuasi project, adding to the potential of what this giant mineral system will ultimately become. The possible presence of a large copper-gold porphyry system associated with the high-grade vein-hosted HS mineralization has been a part of our geological interpretation from the beginning, and we have now confirmed that we were on the right track. While our near-term exploration efforts will continue to target the unique high-grade vein system which we view as having the most important immediate potential, the presence of a porphyry system significantly increases the long-term value of the project.
We continue to successfully expand the HS system, and drillhole DPDH029 extended mineralization by over 400m to the south of hole 27. The north-south dimension of the key high-grade zone has now been expanded to over 1,100m and remains open in all directions. Hole DPDH029 ended in mineralization in argillic alteration associated with the high-sulphidation system overprinting early porphyry veins. This provides a clear vector indicating that the porphyry lies to the west of the end of this hole, some 500m south of the intersection in DPDH027, confirming its location and size potential."
Copper equivalent (CuEq) for drill intersections is calculated based on US$3.00/lb Cu, US$1,500/oz Au and US$18/oz Ag, with 80% metallurgical recoveries assumed for all metals. The formula is: CuEq % = Cu % + (0.7292 * Au g/t) + (0.0088 * Ag g/t).
Estimated true widths are rounded to the nearest metre for widths over 10 m and to the nearest 0.1 m for widths less than 10 m, as this better reflects the precision of the estimates. True widths should be regarded as approximate as these are derived from an estimation that uses a preliminary interpretation of the geological model and are subject to change as more information becomes available. Intervals greater than 300m are interpreted as bulk disseminated and stockwork mineralization and drilled width is equal to estimated true width.
DPDH027 was collared from the same platform as DPDH021 and angled to the southwest (255 o) with a dip of -46 o to test for a southern extension to the mineralization in hole 21. This hole was also planned to go as deep as possible to test the concept of a porphyry system located to the west of the main HS zone. Partial results from this hole, to a depth of 1,075.1m, were released on January 20 and February 19, and are included in the table of full results above.
Within the HS alteration and mineralization, the characteristic zonation of porphyry veining can be recognized with D veins first intersected at 480m, B veins at 920m and A veins at 1,270m. This zonation indicates that the hole intersected the eastern flank of a porphyry centre, with the hole ending in mineralized diorite porphyry with potassic alteration. The same zonation is also seen to the north, in DPDH028, and to the south, in DPDH029, however neither of those holes appears to have been drilled deep enough to intersect the porphyritic rocks or potassic alteration and both ended in the HS system. Together these three holes provide clear evidence of a western porphyry system with a minimum north-south extent of 700m.
DPDH029 was collared adjacent to DPDH027 and drilled towards the southwest (229 o) at a dip of -50 degrees in order to explore the southern extent of the deposit. Partial results from this hole, to a depth of 1,060.0m, were released on February 19, and are included in the table of full results above.
As with other holes, numerous intersections of HS mineralization were drilled by this hole, including a broad zone from 776.9m which includes some higher-grade sub zones. The zone from 776.90m to 934.60m correlates well with the large zone in DPDH021, 22, 27 and 28 and indicates that the HS system remains strong here and is completely open to the south.
This hole intersected the same zonation of porphyry veining, overprinted by the HS alteration, but stopped short of intersecting potassic alteration or mineralized diorite porphyry.
Discussion
Drillhole DPDH027 confirms the presence and location of a significant porphyry copper-gold centre which is intimately related to the high-grade HS mineralization that makes up the currently known deposit. The hole transited the eastern flank of the porphyry system, where it has in large part been overprinted by the subsequent HS alteration, before intersecting a multi-phase, mineralized diorite porphyry with potassic alteration at a depth of about 1,262m. Below this depth, the hole is primarily in potassic altered and mineralized porphyry and country rock, still overprinted by discreet zones of HS alteration and mineralization, and it ended in mineralization at 2,005m.
In addition to the characteristic alteration, veining and porphyry intrusive rocks, the change from HS to porphyry mineralization is distinguished by a change in copper mineralogy from enargite / chalcocite in the HS to chalcopyrite +/- bornite in the porphyry. This change can be identified visually, and geochemically by a decrease in the cyanide-soluble values of the sequential copper analyses and an increase in the residual copper values. See technical notes below for additional details.
The density of early veins varies throughout the section below 1,200m with more abundant veins associated with higher copper and gold grades. Early lithologies, including early porphyry phases and fine-grained andesite and rhyolite country rock, and breccias, contain the highest density of veining and consequently the highest grades. In contrast, a late phase porphyry is clearly identified by diminished alteration and relatively scarce early veins and carries lower grades. The highest grades in this section occur in areas with overprinting HS mineralization, with individual samples between 1.0% and 7.0% CuEq.
Table 2 gives an example of these differences by showing the average grade of a representative interval of the different geological units in DPDH027. The overall grade of the Lunahuasi porphyry system will depend on the relative abundance of these different porphyry phases and the intensity of the associated veining, and the high grade of the densely veined early porphyry intervals is encouraging.
The Phase 3 drill program was completed on May 8 th with a total of 25,003m drilled in 24 holes as shown in Table 3. In addition to these holes, three geotechnical holes and two water wells were completed. All equipment and personnel have now been demobilized from the site and all field activities have been concluded. Table 4 shows assay intervals released to date by the date of the news release. Assays for the final 12 holes representing 10,369m of drill core are pending.
Qualified Persons and Technical Notes
The scientific and technical disclosure included in this news release have been reviewed and approved by Bob Carmichael, B.A.Sc., P.Eng. who is the Qualified Person as defined by NI 43-101. Mr. Carmichael is Vice President, Exploration for the Company.
Samples were cut at NGEx's operations base in San Juan, Argentina by Company personnel. Diamond drill core was sawed and then sampled in maximum 2-meter intervals, stopping at geological boundaries. Core diameter is a mix of PQ, HQ and NQ depending on the depth of the drill hole. Samples were bagged, tagged and packaged for shipment by truck to the ALS preparation laboratory in Mendoza, Argentina where they were crushed and a 500g split was pulverized to 85% passing 200 mesh. The prepared sample splits were sent to the ALS assay laboratory in Lima, Peru for copper, gold and silver assays, and multi-element ICP. ALS is an accredited laboratory which is independent of the Company. Gold assays were by fire assay fusion with AAS finish on a 30g sample. Copper and silver were assayed by atomic absorption following a 4-acid digestion. Samples were also analyzed for a suite of 48 elements with ME-MS61 plus mercury and a sequential copper leach analysis was completed on each sample with copper greater than 500ppm (0.05%). Sequential copper analysis involves the sequential leaching of the sample by acid, followed by a cyanide solution. It can be used to differentiate copper speciation, with copper oxide minerals leachable with acid and secondary copper minerals (enargite, chalcocite, covellite) leachable by cyanide. The residual copper remaining following the sequential leaches it typically contained in chalcopyrite and bornite. Copper and gold standards as well as blanks and duplicates (field, preparation, and analysis) were randomly inserted into the sampling sequence for Quality Control. On average, 9% of the submitted samples are Quality Control samples. No data quality problems were indicated by the QA/QC program.
Copper equivalent (CuEq) for drill intersections is calculated based on US$3.00/lb Cu, US$1,500/oz Au and US$18/oz Ag, with 80% metallurgical recoveries assumed for all metals. The formula is: CuEq % = Cu % + (0.7292 * Au g/t) + (0.0088 * Ag g/t).
Estimated true widths are rounded to the nearest metre for widths over 10 m and to the nearest 0.1 m for widths less than 10 m, as this better reflects the precision of the estimates. True widths should be regarded as approximate as these are derived from an estimation that uses a preliminary interpretation of the geological model and are subject to change as more information becomes available. Intervals greater than 300m are interpreted as bulk disseminated and stockwork mineralization and drilled width is equal to estimated true width.
Collar coordinates in Table 3 are updated with higher precision survey data as it becomes available and may change between news releases.
About NGEx Minerals
NGEx Minerals is a copper and gold exploration company based in Canada, focused on exploration of the Lunahuasi copper-gold-silver project in San Juan Province, Argentina, and the nearby Los Helados copper-gold project located approximately nine kilometres to the northeast in Chile's Region III. Both projects are located within the Vicuña District, which includes the Caserones mine, and the Josemaria and Filo del Sol deposits.
NGEx owns 100% of Lunahuasi and is the majority partner and operator for the Los Helados project, subject to a Joint Exploration Agreement with Nippon Caserones Resources LLC, which is the indirect 30% owner of the operating Caserones open pit copper mine located approximately 17 kilometres north of Los Helados. Lundin Mining Corporation holds the remaining 70% stake in Caserones.
The Company's common shares are listed on the TSX under the symbol "NGEX" and also trade on the OTCQX under the symbol "NGXXF". NGEx is part of the Lundin Group of Companies.
Additional information relating to NGEx may be obtained or viewed on SEDAR+ at www.sedarplus.ca.
Additional Information
Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this news release.
The information contained in this news release was accurate at the time of dissemination but may be superseded by subsequent news release(s). The Company is under no obligation, nor does it intend to update or revise the forward-looking information, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws.
Cautionary Note Regarding Forward-Looking Statements
Certain statements made and information contained herein in the news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information"). All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to, statements regarding: the geological interpretation of the Lunahuasi system which is expected to evolve with additional drilling, the nature and timing of the work to be undertaken to advance the Lunahuasi project, the potential for further discovery and/or extension of mineralized zones at the Lunahuasi project; the timing of, and conclusions resulting from, an update to the geological interpretation at Lunahuasi, including the ultimate size potential of the Lunahuasi system, or the timing and/or results thereof; and the Company's ability to use information gathered from drilling to date to effectively target and drill in future campaigns. Generally, this forward-looking information can frequently, but not always, be identified by use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "projects", "budgets", "assumes", "strategy", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would", "should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof.
Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management with respect to the nature, scope and timing of the work to be undertaken to advance the Lunahuasi Project. Although the Company believes that these factors and expectations are reasonable as at the date of this document, in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown risks, uncertainties and other factors may cause actual results or events to differ materially from those anticipated in such forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, without limitation: the emergence or intensification of infectious diseases, such as COVID 19, and the risk that such an occurrence globally, or in the Company's operating jurisdictions and/or at its project sites in particular, could impact the Company's ability to carry out the program and could cause the program to be shut down; estimations of costs, and permitting time lines; ability to obtain environmental permits, surface rights and property interests in a timely manner; currency exchange rate fluctuations; requirements for additional capital; changes in the Company's share price; changes to government regulation of mining activities; environmental risks; unanticipated reclamation or remediation expenses; title disputes or claims; limitations on insurance coverage, fluctuations in the current price of and demand for commodities, particularly gold prices, as they are fluctuating currently due to market volatility; material adverse changes in general business, government and economic conditions in the Company's operating jurisdictions, particularly Argentina; the availability of financing if and when needed on reasonable terms; risks related to material labour disputes, accidents, or failure of plant or equipment; there may be other factors that cause results not to be as anticipated, estimated, or intended, including those set out in the Company's annual information form and annual management discussion and analysis for the year ended December 31, 2024, which are available on the Company's website and SEDAR+ at www.sedarplus.ca under the Company's profile.
The forward-looking information contained in this news release is based on information available to the Company as at the date of this news release. Except as required under applicable securities legislation, the Company does not undertake any obligation to publicly update and/or revise any of the included forward-looking information, whether as a result of additional information, future events and/or otherwise. Forward-looking information is provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of the Company's operating environment. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All the forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.
SOURCE NGEx Minerals Ltd.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Cision Canada
31 minutes ago
- Cision Canada
Gold Miners Lag the Bullion Boom -- But Not for Long, Say Wall Street Analysts
Issued on behalf of Lake Victoria Gold Ltd. VANCOUVER, BC, June 5, 2025 /CNW/ -- Equity Insider News Commentary – Goldman Sachs analysts say central banks are driving the current gold bull market by purchasing roughly 80 metric tons per month — the equivalent of $8.5 billion at today's prices. With ongoing geopolitical instability and economic uncertainty, analysts like George Milling-Stanley of State Street Global Advisors argue that gold remains a compelling hedge. As bullion pushes toward new highs, momentum is starting to shift toward mining equities as well. A growing number of investors are now eyeing gold stocks like Lake Victoria Gold (TSXV: LVG) (OTCQB: LVGLF), i-80 Gold Corp. (NYSE-American: IAUX) (TSX: IAU), Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF), Franco-Nevada Corporation (TSX: FNV) (NYSE: FNV), and IAMGOLD Corporation (NYSE: IAG) (TSX: IMG). Despite the price surge in physical gold, Jefferies analysts note that many miners are still trading at historically low valuations — as if gold were stuck at $2,500 an ounce or lower. That disconnect, they say, may not last much longer. Lake Victoria Gold (TSXV: LVG) (OTCQB: LVGLF) is an emerging gold developer advancing a suite of development -stage assets in Tanzania, one of East Africa's most geologically prospective regions. With multiple project catalysts now in motion, the company is gaining attention as a junior to watch. A key near-term focus is its planned 3,000-meter reverse circulation (RC) drill program at Ngula 1, part of the larger Tembo Project located adjacent to Barrick's high-grade Bulyanhulu mine. Ngula 1 has already returned notable historical intercepts, including 28.57 g/t gold over 3 meters and 17.23 g/t over 4 meters. The current 45-hole campaign is targeting near-surface mineralization that could potentially support toll milling at a nearby third-party facility. If the program meets expectations, it may pave the way for a streamlined, low-capex production pathway leveraging local infrastructure. "This drilling campaign is part of our broader strategy to unlock the long-term value at Tembo," said Simon Benstead, Executive Director of Lake Victoria Gold. "While the near-surface potential at Ngula 1 presents an exciting opportunity for near-term production and cash flow, it also serves a larger purpose—supporting a non-dilutive path toward what we believe is a district-scale gold system. We're leveraging strategic infrastructure and partnerships to advance exploration while staying disciplined on capital allocation." In parallel with its drilling efforts, Lake Victoria Gold is advancing a proposed processing arrangement through a non-binding letter of intent (LOI) with Nyati Resources. Under the current framework, mineralized material from LVG's Mining Licences would be trucked to Nyati's 120-tonne-per-day processing plant, with an option to scale operations into a new 500-tpd facility which is expected to be commissioned in the coming months. To support the initiative, Nesch Mintech Tanzania has been brought in to assess the plant's readiness, evaluate metallurgical performance, and outline any necessary upgrades to support production goals. "Engaging Nesch Mintech at this stage ensures we bring third-party rigour and transparency to the commissioning process, which is fundamental to assessing the Nyati opportunity," said Marc Cernovitch, President and CEO of Lake Victoria Gold. "We are excited by the potential to leverage existing processing infrastructure and local ore sources to create a scalable gold production platform in Tanzania." If proven viable, the proposed partnership could help advance Lake Victoria Gold's strategy of building a lean, capital-efficient gold operation. On-site processing may unlock early cash flow while also yielding critical geological data to refine future exploration. Though factors such as metallurgy, grade consistency, and permitting will need to be closely managed and always present risks, the phased structure provides a flexible alternative to conventional, high-cost development models. "Tembo has always stood out as a project with the potential to deliver both near-term value and long-term discovery upside," said Benstead. "Evaluating this small-scale development opportunity allows us to test the system, generate operational insights, and potentially self-fund ongoing exploration." Both the Ngula 1 drill campaign and the proposed Nyati processing partnership are part of Lake Victoria Gold's broader Tembo Project — a high-potential gold district that has already seen over US$28 million in exploration spending and more than 50,000 meters of drilling. Key zones like Nyakagwe Village and Nyakagwe East remain open along strike and at depth, with only a small portion of mapped structures drilled to date. This leaves considerable room for further discovery. Tembo is also anchored by a tier-one relationship: a milestone-driven contingent payment agreement with Barrick Mining Corp., valued at up to US$45 million depending on exploration outcomes. The deal reflects shared confidence that Tembo may host a district-scale gold system with long-term development potential. While Tembo remains the flagship, the most advanced asset in LVG's portfolio is Imwelo — a fully permitted gold project located near AngloGold Ashanti's Geita Mine. Imwelo is supported by a 2021 Pre-Feasibility Study and stands out as a strong candidate for phased development. To help fund its advancing strategy, Lake Victoria Gold has secured multiple non-dilutive financing channels. A gold prepay agreement with Monetary Metals allows the company to draw on the cash value of up to 7,000 ounces tied to future production. Separately, a C$3.52 million investment from Taifa Group — part of a larger C$11.52 million multi-stage financing — has further strengthened the company's balance sheet. As part of that transaction, former Taifa CEO Richard Reynolds joined the board, bringing valuable in-country operating experience. With drill rigs soon turning at Ngula 1, plant evaluations underway, and capital sources secured, Lake Victoria Gold is steadily positioning itself for a transition into production. Its development strategy is incremental by design — focused on limiting upfront capital exposure, unlocking early-stage returns, and using those gains to accelerate exploration. In an industry often dominated by high-cost development paths, LVG is charting a different course — one that offers potential for lower-risk, modular growth in a proven gold district. In other industry developments and happenings in the market include: i-80 Gold Corp. (NYSE-American: IAUX) (TSX: IAU) has closed its previously announced US$11.1 million concurrent private placement, issuing 22.24 million units priced at US$0.50 each. This follows a US$173 million bought deal financing that closed earlier in May, bringing total gross proceeds to approximately US$184 million. The capital will be used to support the company's Nevada-focused development plan and broader recapitalization strategy. "At Granite Creek Underground, i-80 Gold's first gold project to ramp up, we are making good progress in our dewatering efforts, addressing groundwater inflows by enhancing our pumping capacity and upgrading the water treatment infrastructure," stated Richard Young, President and CEO of i-80 Gold. "These improvements should allow us to ramp-up to steady state of gold output in the second half of 2025." Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) produced 33,252 ounces of gold during Q1 2025 at an AISC of $1,286 per ounce and sold 32,076 ounces at $2,068 per ounce, generating $19.2 million in operating cash flow. "We are pleased with the strong start to 2025 with solid production and cost performance in Q1," said Patrick Downey, President and CEO of Orezone Gold. "We remain on track to deliver our 2025 production and cost guidance while progressing key initiatives including the grid power connection and Bomboré expansion drilling." Orezone maintained its full-year production guidance and expects major cost reductions once the Phase III grid connection is completed in Q3. Meanwhile, expansion drilling at Bomboré delivered promising near-mine results to support future growth. Franco-Nevada Corporation (TSX: FNV) (NYSE: FNV) has acquired a cornerstone royalty on the Côté Gold Mine, operated by IAMGOLD Corporation (NYSE: IAG) (TSX: IMG) and Sumitomo, for $1.05 billion in cash. "We are pleased to add this new cornerstone gold royalty to our extensive portfolio in Ontario," said Paul Brink, President & CEO of Franco-Nevada. "Their team has developed an excellent new operation with an extensive Resource endowment that has high potential to continue expanding." The 7.5% gross margin royalty covers nearly the entire resource base and is expected to generate $67 million annually at IAMGOLD's midpoint production guidance and a $3,200 gold price. Franco-Nevada praised the modern design and expansion potential of the Côté operation, which includes autonomous equipment and potential mill capacity growth to 20 Mtpa. "We are pleased to welcome our new partner Franco-Nevada to the Côté Gold Mine as we continue to ramp up one of Canada's largest and longest-life gold mines," said Renaud Adams, President and CEO of IAMGOLD. "The value upside of the Côté Gold Mine is further supported by the rapidly growing Gosselin zone which we intend to incorporate into an updated mine plan next year." As part of the deal, IAMGOLD and Sumitomo may repurchase up to 50% of the royalty in two tranches. Franco-Nevada will fund the transaction with existing capital and continues to generate $275–$300 million in quarterly free cash flow. Equity Insider [email protected] (604) 265-2873 DISCLAIMER: Nothing in this publication should be considered as personalized financial advice. We are not licensed under securities laws to address your particular financial situation. No communication by our employees to you should be deemed as personalized financial advice. Please consult a licensed financial advisor before making any investment decision. This is a paid advertisement and is neither an offer nor recommendation to buy or sell any security. We hold no investment licenses and are thus neither licensed nor qualified to provide investment advice. The content in this report or email is not provided to any individual with a view toward their individual circumstances. is owned by Media Corp. ("BAY"). BAY has been paid a fee for Lake Victoria Gold Ltd. advertising and digital media from a shareholder of the Company (333,333 unrestricted shares). There may be 3rd parties who may have shares of Lake Victoria Gold Ltd., and may liquidate their shares which could have a negative effect on the price of the stock. This compensation constitutes a conflict of interest as to our ability to remain objective in our communication regarding the profiled company. Because of this conflict, individuals are strongly encouraged to not use this publication as the basis for any investment decision. The owner/operator of "BAY" reserve the right to buy and sell, and will buy and sell shares of Lake Victoria Gold Ltd. at any time without any further notice commencing immediately and ongoing. We also expect further compensation as an ongoing digital media effort to increase visibility for the company, no further notice will be given, but let this disclaimer serve as notice that all material, including this article, which is disseminated by BAY has been approved by Lake Victoria Gold Ltd. Technical information relating to Lake Victoria Gold Ltd. has been reviewed and approved by David Scott, Pr. Sci. Nat., a Qualified Person as defined by National Instrument 43-101. Mr. Scott is a registered member of the South African Council for Natural Scientific Professions (SACNASP) and is a Director of Lake Victoria Gold Ltd., and therefore is not independent of the Company; this is a paid advertisement, we currently own shares of Lake Victoria Gold Ltd. and will buy and sell shares of the company in the open market, or through private placements, and/or other investment vehicles. While all information is believed to be reliable, it is not guaranteed by us to be accurate. Individuals should assume that all information contained in our newsletter is not trustworthy unless verified by their own independent research. Also, because events and circumstances frequently do not occur as expected, there will likely be differences between the any predictions and actual results. Always consult a licensed investment professional before making any investment decision. Be extremely careful, investing in securities carries a high degree of risk; you may likely lose some or all of the investment.


CTV News
39 minutes ago
- CTV News
Base metal stocks help lift S&P/TSX composite
A man walks past a building in Toronto that used to house the Toronto Stock Exchange on Thursday, August 18 2011. THE CANADIAN PRESS/Aaron Vincent Elkaim TORONTO — Strength in base metal stocks helped Canada's main stock index move up in late-morning trading, while U.S. stock markets also climbed higher. The S&P/TSX composite index was up 53.53 points at 26,382.53. In New York, the Dow Jones industrial average was up 112.78 points at 42,540.52. The S&P 500 index was up 24.73 points at 5,995.54, while the Nasdaq composite was up 133.05 points at 19,593.54. The Canadian dollar traded for 73.24 cents US compared with 73.12 cents US on Wednesday. The July crude oil contract was up 73 cents US at US$63.58 per barrel and the July natural gas contract was down four cents US at US$3.68 per mmBTU. The August gold contract was down US$5.50 at US$3,393.70 an ounce and the July copper contract was up 12 cents US at US$5.01 a pound. This report by The Canadian Press was first published June 5, 2025.


Winnipeg Free Press
44 minutes ago
- Winnipeg Free Press
Base metal stocks help lift S&P/TSX composite, U.S. stocks also up
TORONTO – Strength in base metal stocks helped Canada's main stock index move up in late-morning trading, while U.S. stock markets also climbed higher. The S&P/TSX composite index was up 53.53 points at 26,382.53. In New York, the Dow Jones industrial average was up 112.78 points at 42,540.52. The S&P 500 index was up 24.73 points at 5,995.54, while the Nasdaq composite was up 133.05 points at 19,593.54. The Canadian dollar traded for 73.24 cents US compared with 73.12 cents US on Wednesday. The July crude oil contract was up 73 cents US at US$63.58 per barrel and the July natural gas contract was down four cents US at US$3.68 per mmBTU. The August gold contract was down US$5.50 at US$3,393.70 an ounce and the July copper contract was up 12 cents US at US$5.01 a pound. Monday Mornings The latest local business news and a lookahead to the coming week. This report by The Canadian Press was first published June 5, 2025. Companies in this story: (TSX:GSPTSE, TSX:CADUSD)