
Power Division applauds PESCO for remarkable progress
The Power Division has commended the Peshawar Electric Supply Company (PESCO) for its outstanding performance and significant reforms during the current fiscal year.
In a high-level meeting held at the Power Division, the Minister for Power, alongside Secretary Power expressed appreciation to Chairman Board of Directors PESCO, Himayatullah Khan and their team for the strides made by the company in improving operational efficiency and service delivery.
He added that if the current trend continues, there is a strong likelihood that the transmission and distribution (T&D) and recovery targets set for Pesco till June 2025 may be achieved.
The Minister for Power praised PESCO's leadership for its dynamic and targeted initiatives that have led to a marked improvement in key performance indicators.
Particular recognition was given to the robust policy measures implemented under the supervision of Chairman Pesco, which included industrial sector reforms, an aggressive crackdown on power theft, installation of smart and AMR meters, and a wide-reaching revenue recovery campaign.
Thanks to these efforts, PESCO has achieved a noticeable reduction in T&D losses - bringing the figure down to 34.73% in the current fiscal year from 36.02% % previous year.
Simultaneously, revenue collection surged to an impressive 88.73%, reflecting enhanced operational efficiency and consumer compliance thus improving the financial health of the company.
Notably, during March 2025 alone, T&D losses were reduced, and revenue recovery improved by 4% compared to the same month in the previous year.
As a result, financial losses dropped significantly to Rs8.06 billion in March 2025 from Rs12.06 billion in March 2024 - a testament to the effectiveness of reforms.
It was also highlighted in the meeting that The Chairman of the Board of Directors PESCO, Himayatullah Khan, has placed a strong emphasis on implementing industrial reforms to ensure a reliable and uninterrupted power supply to the industrial sector.
These initiatives are set to significantly increase the energy demand of PESCO while driving industrial growth and boosting the overall economy of the area.
Further emphasizing infrastructure development, PESCO has actively pursued the construction of new grid stations, energization of 11KV feeders, and strategic area planning.
This includes separating good-paying areas and industrial consumers from general consumers to optimize supply and revenue outcomes.
In a technological leap, PESCO has introduced Automated Meter Reading Infrastructure to eliminate manual meter reading, ensuring accurate billing and minimizing human error. These advancements underscore the company's commitment to modernization and transparency.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
3 days ago
- Business Recorder
Power tariff hike: Govt reaches ‘understanding' with IMF
ISLAMABAD: The government and the International Monetary Fund (IMF) have reportedly reached an understanding that electricity tariffs will be increased through annual rebasing from July 2025 if the power sector's revenue requirements exceed the allocated subsidy envelope of Rs 1.036 trillion for fiscal year 2025–26, well-informed sources in the Finance Ministry told Business Recorder. This understanding was reached during discussions between Pakistani authorities and the visiting IMF mission held from May 14 to 24, 2025. 'Within the Rs 1.036 trillion envelope, sufficient subsidy will be allocated to ensure zero circular debt flow in FY26. The Petroleum Development Levy (PDL)-financed Prime Minister's package—amounting to Rs 182 billion—will be counted toward the FY26 subsidy,' the sources added. Reduced hydropower, costly fuels: Govt warns of potential hike in power bills Both sides also agreed that any additional financial needs will be met through tariff adjustments during the July rebasing exercise while maintaining a progressive power tariff structure, the sources maintained. According to sources, the IMF emphasized the importance of fiscal discipline, with subsidy levels expected to remain within 0.8% of GDP. These subsidies will be linked to credible targets for stock clearance and loss reduction. The Power Division has been directed to take all necessary steps to implement the measures agreed upon with the IMF. The government had earmarked Rs 1.190 trillion for the power sector for FY2024–26. However, the Power Division has also secured approval for additional subsidies to keep the circular debt flow within the limit agreed with the Fund. The Finance Division has revised and communicated provisional Indicative Budget Ceilings (IBCs), allocating Rs 636.136 billion for sector subsidies under the recurrent budget for FY2025–26, up from the earlier allocation of Rs 400 billion. As the detailed breakdown of the revised subsidy for FY2024–25 is not available, it remains unclear whether the full allocation has been utilized by the Power Division or if deviations occurred. Sources within the Power Division believe that subsidies for FY2025 may exceed Rs 1.2 trillion, driven by growing support for residential consumers and persistent circular debt obligations. 'A sharp increase in protected consumer categories—those consuming less than 200 units per month—is driving higher subsidy needs, as more consumers adjust their consumption or install solar panels to stay within the protected threshold,' the sources said. Cross-subsidy pressures are also rising, as declining industrial and commercial consumption reduces the contribution of higher-paying users to the overall system. The government also plans to clear up to Rs 541 billion in circular debt stock during FY2025, as part of a broader six-year debt reduction strategy. 'Subsidy allocations remain a contentious issue, particularly concerning the treatment of PDL proceeds and their role in budget financing,' the sources continued. Tariff rebasing and further adjustments remain under government consideration to close the subsidy gap. However, political sensitivities and lobbying from industrial stakeholders are limiting policy flexibility. The successful implementation of the Circular Debt Workout and Action Plan (CDWAP) and the ongoing restructuring of Pakistan Holding Limited's (PHL) debt are seen as critical to reducing future interest costs and stabilizing circular debt flows. Additionally, the Finance Division has directed the Power Division to strictly follow mandatory instructions issued to all Principal Accounting Officers (PAOs), heads of departments, and related entities when preparing budget estimates for each cost center and account head. Copyright Business Recorder, 2025


Express Tribune
5 days ago
- Express Tribune
Govt decides to tighten solar net metering rules
Listen to article The government has decided to tighten regulations for solar net metering users in a second attempt, after the first one faced a strong backlash and was blocked by Prime Minister Shehbaz Sharif. Under the new plan, the government will abolish the zero-bill facility for solar net metering by introducing various measures. Additionally, consumers will be allowed a sanctioned load of 1.0x, down from the current load of 1.5x. This means they will be forced to switch to hybrid solar systems by using lithium batteries. Under the current net metering system, the consumers share electricity with power distribution companies (DISCOs) at a buyback rate of Rs27 per unit. However, as part of the new plan, the government is seeking to end this electricity sharing system and DISCOs will pay only Rs10 per unit to the rooftop solar owners who have a net metering system. Experts believe this will lead to an additional expenditure of $1 billion on the import of lithium batteries every year. The plan was discussed during a meeting held between different stakeholders and power ministry officials. Power Division minister chaired the huddle. The Power Division has proposed several measures that will kill the spirit of net metering. According to the proposed plan, the concept of net metering has been abolished and a new concept of net billing with a revised buyback rate is being introduced. This means there will be no exchange of electricity units; rather DISCOs will pay a reduced buyback rate of Rs10 to consumers instead of the existing Rs27 per unit. At present, DISCOs offer a credit billing facility on a quarterly basis, which is being abolished. In its place, a cash facility will be available for the excess electricity exported to the national grid by the solar meter owners and the time period has been reduced to a monthly basis. However, no change has been proposed in the categories of consumers as commercial, domestic and all other consumers will be eligible to take benefit of the new policy. The contract period for a licence has been reduced from seven years to five years. Meanwhile, Federal Minister for Energy Awais Ahmad Khan Leghari, in a statement, said that the government was not abolishing the net metering policy, but was considering changing its current mechanism to a more effective, transparent and sustainable model. He recalled that in 2017-18 he himself played a key role in introducing net metering and at that time the system was in its infancy. "Now, the scope of net metering has expanded and it is having a serious impact on the grid, which must be addressed in a timely manner." He stressed that the government did not intend to harm any consumer or business, but all decisions were being taken while keeping in mind the national interest and long-term sustainability of the energy system. "If we mention the purchase of units, then this is also being considered and there is talk of bringing it to the energy purchase price, so that the system automatically adjusts with fluctuations in rates. All these suggestions are under consideration," the minister said. He pointed out that if the payback period for net metering customers was about three years or less, it would be suitable for any investment. "If a customer is consuming 40% of the electricity himself, the return of money in three years is an acceptable business model. These reforms are not a deterrent, but a step towards a better, balanced and sustainable system," he added. During the meeting, the energy minister presented a comprehensive outline of the ongoing energy reforms. In this regard, the government has eliminated 9,000 megawatts of expensive and unnecessary projects, which were a burden on the system. He said that a levy was imposed on the captive power consumers to bring them back to the grid, which resulted in an increase in electricity demand. Since June 2024, the cross-subsidy given to the industry has reached Rs174 billion, which has reduced industrial tariffs by 31% and caused a significant rise in industrial consumption.


Business Recorder
6 days ago
- Business Recorder
Nepra's KE MYT decision: Power Div. submits review motion
ISLAMABAD: The Power Division on Monday submitted the much-talked about review motion challenging the National Electric Power Regulatory Authority's recent Multi-Year Tariff (MYT) determinations for K-Electric (KE) for 2024-25 to 2029-30. The government is urging Nepra to revise key assumptions, performance benchmarks and profit margins in line with real-world data and standards applied to other power utilities. According to Power Division, Nepra allowed KE several cost items and profit margins that are more generous than those granted to other utilities across the country. As a result, electricity bills for Karachi consumers are set to rise disproportionately, and public finances will bear an unnecessary burden. Total financial impact is in excess of Rs 300 billion of the intervention identified for review by GoP in KE MYT. Power Minister, Sardar Awais Khan Leghari, in his tweet said that the power sector of Pakistan cannot afford any inefficiencies encouraged through tariff structure of any company, irrespective of whether it is private or public. 'Our review supports a sustainable and healthy environment in the distribution system of Pakistan in a responsible manner. Power Division hopes that the review process is carried out in a transparent and fair manner,' he added. The key concerns in the Review Petition are as follows: Supply (fuel and fuel related costs): Nepra set KE's fuel-cost rate at Rs. 15.99/kWh, whereas other utilities buy power at lower rates from the national grid. This gap shifts about Rs. 28 billion (FY 2024) and Rs. 13 billion (FY 2025) of extra costs onto the federal budget rather than onto KE customers. Recovery Loss Allowance: KE was permitted to include 'recovery losses' in its tariff even though its own records show it recovers more than the level Nepra allowed. No other utility received this special allowance. This adds roughly Rs. 36 billion in FY 2024 and Rs. 35 billion in FY 2025 to KE's revenue that consumers end up paying. Cumulative impact over a 7-year period is more than Rs 200 billion. Working Capital Allowance: NEPRA permitted KE a 24 percent markup on working capital, a much higher percentage than in its previous tariff and higher than any other power distributor. This increased KE's allowable revenue by about Rs. 2.4 billion in FY 2024 and is projected to total around Rs. 15 billion over the control period of 7 years Higher Allowed Distribution Loss: Nepra set KE's allowed loss at 13.90 percent, instead of the 13.46 percent KE had planned. Losses are electricity that is generated but not billed, due to leaks or theft, or kunda. Around 7 percent of all such leakages can be attributed to theft. By permitting a higher loss level, KE passes on an extra Rs. 3.1 billion in FY 2024, rising to about Rs. 21 billion over the control period. 'Law & Order' Margin: KE received a special 2 percent margin to offset security costs in Karachi—a perk not granted to any other utility, even those operating in equally or more volatile regions. Moreover, Law & Order in Karachi has improved considerably over the last few years, and thereby there exists no reason for such a margin. This margin adds approximately Rs. 14 billion in FY 2024 and up to Rs. 99 billion over the multi-year period to KE's revenue requirement. Retention of 'Other Income': KE is allowed to keep money from fines imposed on its contractors, interest on bank deposits, and profits from side businesses. In effect, consumers have already paid for the assets that generate these incomes, so these funds should reduce KE's costs to customers, not pad its revenue. Effectively, it is being proposed that any such gain on assets that has been financed by consumers needs to be shared with consumers. Transmission (Moving Power from Grid to KE): High transmission loss Target & skewed sharing; NEPRA allowed KE a 1.30 percent loss target, even though KE's historical losses are closer to 0.75 percent. KE keeps 75 percent of any savings if it performs better than 1.30 percent, passing only 25 percent of savings to consumers. This encourages inefficiency and keeps bills high. Financial impact is about Rs. 4 billion in FY 2024, rising to roughly Rs. 28 billion over the control period. Excessive Return on Equity (RoE): KE was granted a 12 percent RoE in U.S. dollars (about 24.46 percent in rupee terms). Other national utilities (like NTDC) receive only 15 percent RoE in rupees. This difference costs consumers around Rs. 4 billion in FY 2024 and approximately Rs. 37 billion over the control period. Distribution (delivering power to homes & businesses)- High distribution - RoE disparity: KE's distribution arm was allowed 14 percent RoE in U.S. dollars (about 29.68 percent in rupees). By comparison, other Discos like FESCO get only about 14.47 percent RoE in rupees. This adds roughly Rs. 3.7 billion in FY 2024 and Rs. 35.6 billion over the control period to KE's revenue. Distribution Loss & Special Allowance: KE was granted an extra 2 percent 'law & order' margin on top of its allowed losses, even though Karachi's security situation is similar to or better than other regions. KE also keeps 25 percent of any savings if it performs better. These practices cost consumers about Rs. 14 billion in FY 2024 and up to Rs. 99 billion over the multi-year period. Working Capital Markup: A 23.91 percent markup was approved for KE's distribution working capital—far higher than any other utility. This adds about Rs. 0.8 billion in FY 2024 and roughly Rs. 10 billion over the control period to KE's revenue requirement. Generation (KE's Own Power Plants), Payments to Idle Power Plants (Take-or-Pay): Nepra approved capacity payments to several KE power plants (BQPS-I, KCCP, KGTPS, SGTPS) even though these plants will run at minimal or no output because KE sources cheaper power from the national grid. Consumers and the government pay for capacity that is not used. This costs about Rs. 12.7 billion in FY 2025 and roughly Rs. 82.5 billion over the multi-year period. Favorable indexation &RoE for KE's plants: Under a hybrid 'take-or-pay' model, KE's plants keep full inflation adjustments (indexed to U.S. CPI or USD/PKR), while independent power producers (IPPs) do not receive equally generous terms. RoE for KE's plants was set at 17 percent (using PKR 168/USD), higher than typical IPP terms, costing Rs. 7 billion in FY 2024 and about Rs. 57.3 billion over the control period. This will result in overall higher bills for Karachi customers; KE's allowed costs, profit margins, and extra allowances will cause Karachi consumers' electricity bills to rise significantly compared to other regions. Several KE cost items—especially the inflated fuel benchmark and payments to idle plants—are effectively covered by the government, stretching public finances. The determinations are unfair treatment & efficiency discouraged: Granting KE advantages not given to other utilities creates a 'two-tier' system. This discourages KE from boosting efficiency, and it undermines transparent, consistent tariff-setting nationwide. The Government maintains that all utilities should be treated equally. KE should not receive special cost or profit allowances unavailable to other power companies and tariffs must reflect actual costs and reasonable returns. Extra allowances for inefficiency and high profit rates must be removed to keep bills affordable. For regulatory accountability Nepra should revise assumptions, benchmarks, and profit margins so they align with real performance data and the standards used for other utilities. Copyright Business Recorder, 2025