
Power Division applauds PESCO for remarkable progress
In a high-level meeting held at the Power Division, the Minister for Power, alongside Secretary Power expressed appreciation to Chairman Board of Directors PESCO, Himayatullah Khan and their team for the strides made by the company in improving operational efficiency and service delivery.
He added that if the current trend continues, there is a strong likelihood that the transmission and distribution (T&D) and recovery targets set for Pesco till June 2025 may be achieved.
The Minister for Power praised PESCO's leadership for its dynamic and targeted initiatives that have led to a marked improvement in key performance indicators.
Particular recognition was given to the robust policy measures implemented under the supervision of Chairman Pesco, which included industrial sector reforms, an aggressive crackdown on power theft, installation of smart and AMR meters, and a wide-reaching revenue recovery campaign.
Thanks to these efforts, PESCO has achieved a noticeable reduction in T&D losses - bringing the figure down to 34.73% in the current fiscal year from 36.02% % previous year.
Simultaneously, revenue collection surged to an impressive 88.73%, reflecting enhanced operational efficiency and consumer compliance thus improving the financial health of the company.
Notably, during March 2025 alone, T&D losses were reduced, and revenue recovery improved by 4% compared to the same month in the previous year.
As a result, financial losses dropped significantly to Rs8.06 billion in March 2025 from Rs12.06 billion in March 2024 - a testament to the effectiveness of reforms.
It was also highlighted in the meeting that The Chairman of the Board of Directors PESCO, Himayatullah Khan, has placed a strong emphasis on implementing industrial reforms to ensure a reliable and uninterrupted power supply to the industrial sector.
These initiatives are set to significantly increase the energy demand of PESCO while driving industrial growth and boosting the overall economy of the area.
Further emphasizing infrastructure development, PESCO has actively pursued the construction of new grid stations, energization of 11KV feeders, and strategic area planning.
This includes separating good-paying areas and industrial consumers from general consumers to optimize supply and revenue outcomes.
In a technological leap, PESCO has introduced Automated Meter Reading Infrastructure to eliminate manual meter reading, ensuring accurate billing and minimizing human error. These advancements underscore the company's commitment to modernization and transparency.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
16 hours ago
- Business Recorder
PESCO launches Pension Management System
PESHAWAR: In a major step towards digital transformation and transparency, the Peshawar Electric Supply Company (PESCO) has launched it's first-ever PESCO Pension Management System (PPMS); a comprehensive software solution in-house. The software was developed by Arif Hameed, Assistant Manager ERP under the leadership of Finance Director PESCO, Yasir Naseem, according to a statement here on Wednesday. This landmark development replaces the company's manual pension system, ensuring swift, transparent, and hassle-free processing of pension cases. The PPMS will significantly reduce the processing time for pension applications, eliminating long-standing delays and challenges faced by pensioners under the old system. Recognizing this achievement, Chairman PESCO Board of Directors, Himayatullah Khan, commended Arif Hameed for his outstanding contribution and awarded him a Certificate of Appreciation. Board Member Fazal-e-Khaliq also presented him with an Honorary Shield as a token of recognition for his commendable efforts. With this initiative, PESCO became the first power distribution company to introduce a comprehensive digital pension management system, setting a new benchmark in public service efficiency and digital transformation within the power sector. This software will manage the complete pension process from initial case preparation to final payment and monthly pension disbursements processed through PPMS eliminate the risk of duplicate payments. It will provide one-click access to detailed payment records for transparency and audit readiness and will automatically make calculations and ensure compliance with pension regulations for all case types. Copyright Business Recorder, 2025


Express Tribune
3 days ago
- Express Tribune
K-P hydropower projects dropped from national plan
The Senate Standing Committee on Power met at Parliament House under the chairmanship of Senator Mohsin Aziz. According to an official statement released on Monday, the committee discussed the 207 MW Madyan and 88 MW Gabral hydropower projects and other energy initiatives. The Special Assistant to the Khyber-Pakhtunkhwa (K-P) Chief Minister on Energy said land worth Rs5 billion had been purchased for the projects, and physical and financial progress had been made. However, the federal government removed them from the Indicative Generation Capacity Expansion Plan (IGCEP) list. Federal Minister for Power Awais Ahmad Leghari said K-P authorities had not fully presented the Council of Common Interests (CCI)-approved power policy. Citing one clause without context was misleading, he added. Inclusion of these projects could raise electricity prices by Rs6 per unit by 2034. The minister said the Power Division removed 8,00010,000 MW of projects from the plan, including some China-Pakistan Economic Corridor (CPEC) power projects, to shield consumers from expensive electricity. The government had also terminated agreements with five Independent Power Producers (IPPs) and renegotiated others, saving an estimated Rs3.4 trillion over four to five years. He said DISCO losses were reduced by Rs191 billion this year. Electricity theft remained a challenge, but the competitive market target had been achieved, ending mandatory government power purchases. The committee reviewed captive power plants, costly imported coal and LNG projects, and tariffs for the protected category. The chairman called for revising the protected category policy. Secretary Power Division confirmed a review was underway and that consumers using up to 200 units received subsidies. Aziz urged the introduction of multiple slab rates to prevent sudden tariff hikes. The committee also discussed Net Hydel Profit (NHP). NEPRA officials said payments were being made to provinces, but K-P representatives called them too low and accumulating. The committee recommended clearing the backlog and paying at least Rs5 billion monthly to K-P. The chair directed that a meeting be held and a report submitted within a week. On wheeling charges, the minister said NEPRA rules had been amended and approved by the Cabinet, reducing the standard Rs28 rate to a Rs12 base rate. The proposal now awaits NEPRA's final approval. Aziz raised concerns over the return on investment (ROI) of IPPs, with some projects showing ROIs as high as 100%. NEPRA officials attributed this to dollar-based payments. The committee asked NEPRA to provide the last five balance sheets of these power plants for review in the upcoming meeting.


Business Recorder
4 days ago
- Business Recorder
Federal govt and provinces: Senate body seeks ‘out of box' fix for NHP dispute
ISLAMABAD: The Senate Standing Committee on Power headed by Senator Mohsin Aziz is scheduled to meet on Monday (today) to find out an 'out of box' solution on the dispute on Net Hydel Profit (NHP) between Federal Government and provinces, particularly Khyber Pakhtunkhwa. The Water and Power Development Authority (WAPDA) has reportedly distanced itself from the proposal of out of box solution of current controversy on NHP. Minister for Planning, Development and Special Initiative, Ahsan Iqbal is also heading a committee on this issue. Ministry of Energy (Power Division) is represented by the CEO of CPPA-G and the MD of PPMC The Committee has convened five meetings attended by the representatives of all four Provinces, the Ministry of Energy (Power Division), the Finance Division. Further update on the finalisation may be shared by the Ministry of IPC. KP formulates strategy aimed at recovering NHP dues According to WAPDA, the Council of Common Interests (CCI) based on Article 161(2) of the Constitution determines the sale rate at Bus Bar of hydel power stations. However, calculating NHP has been tricky due to conflicting claims and interpretations of the Kazi Committee Methodology. Various attempts have been made to resolve this, including ad-hoc payments and arbitration, but a long-term solution remains unresolved. After power sector restructuring and becoming NEPRA licencee, WAPDA paid Rs. 6 billion annually to the Govt, of KP as NHP until FY 2014-15, which was later uncapped at Rs 1.10 per kWh by NEPRA in FY 2015-16, following GoKP's request for settlement of all previous NHP arrears by making payments of Rs.70 billion in four installment and notification of uncapped NHP rate of Rs 1.10/kWh-an MoU was signed between Govt of Pakistan and Govt. of KP on February 25, 2016. The MoU was also approved by CCI on February 29, 2016 and later the settlement of Govt of Punjab's claims of Rs.82.71 billion and payment of regular NHP at uncapped rate was also agreed and approved by CCI on December 16, 2016. Despite paying NHP at the uncapped rate that was further enhanced by NEPRA from Rs.1.10/kWh to Rs.1.155/kWh in FY 2017-18 and CCI's overriding of its earlier decision of Jan 1991 regarding KCM through approving the said MoU, the GoKP again raised the issue in CCI and asked for payment of NHP as per KCM. WAPDA argues that considering Deputy Chairman, Planning Commission's report (suggesting WAPDA's replacement with CPPA-G for NHP obligations), ECC's decision of January 24, 2019 (Power Division to lead efforts to secure financing for NHP payments to provinces) and Finance Minister's remarks during 49th CCI meeting (Finance Division is working on clearing NHP outstanding dues of KPK and Punjab, and in future CPPA-G will directly pay NHP to provinces), the Power Division and CPPA-G are in better position to propose an out of box solution for NHP payment . WAPDA doesn't profit from selling power at hydel stations, as NHP is a pass through item and makes the NHP payment to provinces as per government guidelines and regulations. WAPDA's outstanding recovery from CPPA-G against power sales invoices has sharply increased due to delayed payments, hindering WAPDA's ability to make timely NHP payments to provinces, despite regular billing at NEPRA-determined rates. Currently, WAPDA has to pay NHP of Rs.49.565 billion to GoKP and Rs. 114.584 billion (including Rs. 13.617 billion as NHP arrears) to GoPb. WAPDA maintains that Power Division and CPPA-G are in better position to propose an out of box solution for NHP payment. Power Division (Power Planning & Monitoring Company): PPMC has offered the following comments: (i) Article 161(2) of Pakistan's 1973 Constitution requires that net profits from hydroelectric power generation be paid to the province where the power station is located, calculated by deducting operating expenses from bus bar revenue, and explicitly excludes Net Hydel Profit (NHP) as a pass-through cost to electricity consumers ;(ii) KCM calculates NHP by aggregating power generation income, but this approach, formulated in 1985-86 was based on a unified and unbundled WAPDA being the sole power producer and distributor. Now, Pakistan's energy landscape has changed significantly including WAPDA's unbundling, emergence of IPPS, and shifts in the power mix wherein hydro power contributes 27% (approx.) ;(iii) NHP payments should be made through the federal budget or covered by WAPDA's profits from hydropower sales, rather than consumers; (iv) commenting on GoKP's proposal, PPMC is of the view that the transfer of hydropower plants to provinces is governed by the Power Generation policies of 1995 and 2015 that is applicable to BOOT-based IPP projects developed within a province by private sponsors. The WAPDA Act lacks provisions for transferring hydropower plants constructed under its mandate to the provinces, and its projects are primarily financed through PSDP, donor loans, and internal funds, after accounting for NHP; (v) NHP payment through ESCROW account, does not align with the legal and regulatory framework and the constitutional scheme. Regarding wheeling of power from PEDO and wheeling charges determination, B2B electricity supply through wheeling arrangements will be integrated into IGCEP and TSEP under the CTBCM Directive No. 7. NEPRA's periodical regime, determined water usage charges should be reviewed based on the mechanism applied in various countries. Government of Sindh: The Provincial Government submitted proposal regarding transferring Hydro Electric Stations to the respective provinces in lieu of NHP requires clarification as presently no hydro power station is managed in IPPs mode. It further stated that the hydro-electric power generation is a bi-product of 'Water Reservoir Projects (Dams)'. While framing any such proposal, the basic purpose of construction of these reservoirs be considered and IRSA be included in the committee. Govt of Sindh further contended that transfer of Hydro Electric Stations to provinces requires careful consideration of the primary purpose of water reservoir projects. To ensure a comprehensive approach, it is suggested to include representatives from IRSA, Finance Division, and Economic Affairs Division in the committee to provide technical, financial, and economic expertise. Govt of Sindh has reiterated its earlier stance on NHP, reflected in the minutes of 49th CCI meeting which is as follows; 'Chief Minister, Punjab endorsed views of DCPC and asked for early payment of Rs. 58 billion dues of NHP owned to Punjab. The Chief Minister, Sindh, endorsed the NHP claim of Chief Ministers of Khyber Pakhtunkhwa and Punjab being constitutional. He, however, did not support increase in tariff and its passing on to consumers. He said that since profit was utilized by WAPDA it should now be accounted for'. Copyright Business Recorder, 2025