
Poor housing conditions perpetuate urban poverty in Malaysia
IT IS true what they say, housing is a human right. The social media is replete with cases of homeless people. It is a global crisis.
Even developed economies are not spared. Affordable housing is not just about providing shelter. It is about restoring dignity, nurturing communities, and offering people a fair shot at a better life.
It has long been a cornerstone issue for urban poverty alleviation in Malaysia. The Program Perumahan Rakyat (PPR) was created with noble intentions, which were to house the urban poor and ensure that no one is left behind in the country's march towards progress.
Yet, after decades, it is clear that the system needs more than just incremental tweaks. It requires a bold reimagination.
Today, policies for affordable housing in Malaysia are mainly focused on direct provision of social housing, where the government takes on the role of building and/or owning the bulk of housing units, subsidised housing (such as PR1MA) and subsidised financing schemes.
There are also supportive regulatory measures such as inclusionary zoning, where local authorities issue development approvals conditional on having a segment of the proposed development be set aside for the building of affordable homes.
As introduced in the 11th Malaysia Plan, It is useful to categorise affordable housing measures by their intended target market i.e. measures for households in the bottom 40% by income or the B40 and measures for the middle 40% of households by income or the M40.
In terms of relative need, B40 households are especially vulnerable to the challenge of affording a roof over their heads and many schemes are geared more towards rental rather, though purchase schemes are also selectively offered.
Across Malaysia, many PPR flats tell a troubling story. Broken lifts, poorly maintained corridors, clogged sewage systems, and unsafe communal areas have become all too common.
These are not just technical failures but reflect a deeper issue of how society perceives and treats its most vulnerable citizens. More worrying is the social stigma attached to PPR addresses.
Residents of these flats often find themselves socially and economically segregated from the city's mainstream.
Job opportunities, quality education, healthcare, and safe recreational spaces remain largely out of reach.
The result is a vicious cycle of poverty and exclusion that no number of new housing blocks alone can solve.
The good news is that Malaysia has the opportunity to fix this, if we are willing to be bold. Firstly, we must move beyond isolated housing projects to integrated, mixed-income communities.
The idea is simple. When affordable units are built alongside market-rate homes, schools, shops, and parks, everyone benefits. Social divides narrow, stigma fades, and opportunities grow.
Secondly, it's time to involve future residents in the design and management of their homes. Who better to tell us what works in a community than the people who will live there?
Participatory planning and resident management committees can empower communities and foster a sense of ownership.
We must also see social housing as more than just a roof over one's head. Urban farming plots, community workshops, vocational training centres, and local entrepreneurship hubs should be part of every PPR estate.
Housing should be a platform for social mobility, not a dead end. Equally important is consolidating the maze of overlapping authorities that govern housing in Malaysia.
A single, well-resourced urban housing council could coordinate policies, leverage data for smarter planning, and hold stakeholders accountable.
Lastly, sustainability must be at the heart of the next generation of affordable housing.
Energy-efficient designs, rooftop solar panels, rainwater harvesting systems, and green communal spaces are not luxuries. They are investments that lower costs for the poor and contribute to national climate goals.
This is a moral imperative. How we house the most vulnerable among us says a great deal about the values we uphold as a society.
As Malaysia aims to become a high-income, inclusive nation, reimagining social housing is not a side issue. It is a central test of our social conscience and policy maturity.
The time for cosmetic fixes is over. We must be brave enough to rethink, rebuild, and reinvest in our urban poor. Only then can we build cities that truly leave no one behind.
Reimagining social housing in Malaysia is not just about erecting more concrete blocks. It's about crafting urban spaces that restore dignity, enable upward mobility, and break cycles of poverty.
Those house designers out there must come forward to offer designs and concepts. This is what nation-building is all about.
As Malaysia aspires to become a high-income and inclusive nation, affordable housing must be seen as an investment in human capital and social cohesion, not merely a social welfare cost. —July 6, 2025
Professor Dato Dr Ahmad Ibrahim is an associate fellow at the Ungku Aziz Centre for Development Studies, Universiti Malaya.
The views expressed are solely of the author and do not necessarily reflect those of Focus Malaysia.
Main image: Khazanah Research

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Straits Times
a day ago
- New Straits Times
RM1.09m drop recorded in City Hall housing rent arrears
KUALA LUMPUR: Rent arrears for Kuala Lumpur City Hall housing units have dropped to RM69 million, down from more than RM70 million previously. Minister in the Prime Minister's Department (Federal Territories) Datuk Seri Dr Zaliha Mustafa said City Hall has introduced various initiatives and measures to ensure that tenants pay their rent, resulting in a marginal reduction of RM1.09 million. "The initiatives and efforts include engagement sessions and enforcement measures such as awareness campaigns on the responsibility to pay rent, and encouraging the settlement of arrears through the 'Jom Bayar Sewa PA/PPR' campaign. "We also issue arrears reminder notices and conduct face-to-face sessions in PA/PPR areas for negotiation and settlement of outstanding payments. "In addition, City Hall officers carry handheld payment terminals during visits to units in arrears to allow tenants to make payments without needing to go to the payment counters," she said in a written reply in the Dewan Rakyat today. She was responding to a question from Fong Kui Lun (PH–Bukit Bintang) on the measures taken against City Hall housing tenants who have yet to settle the RM70 million in arrears. She added that City Hall has also introduced instalment payment schemes for tenants unable to settle arrears in full, and offered multiple payment channels beyond counter services. Dr Zaliha said they are implementing the "Task Force Culas Sewa" operation, which involves cutting the water supply to units with prolonged arrears, but only after reminders have been issued and negotiation sessions conducted. She said this action is in line with Clause 9 of the City Hall Flat Tenancy Agreement, which allows the mayor to authorise the disconnection of water supply. "In implementing these initiatives, City Hall faces challenges in gaining tenant cooperation, as turnout for face-to-face sessions has been low. "Most tenants granted instalment plans also fail to comply with their payment schedules.


The Sun
a day ago
- The Sun
Dr Wan Azizah aids Desa Tun Razak PPR fire victims in Kuala Lumpur
KUALA LUMPUR: Bandar Tun Razak Member of Parliament Datuk Seri Dr Wan Azizah Wan Ismail today reached out to seven victims of the fire at the People's Housing Project (PPR) in Desa Tun Razak in Cheras, last Saturday. Dr Wan Azizah, who is also the wife of Prime Minister Datuk Seri Anwar Ibrahim, presented cash aid from the Bandar Tun Razak Parliamentary Office, the Cheras Social Welfare Department and Baitulmal to help ease the victims' burden. 'Most of the victims are tenants, with only one being a homeowner. We've already considered ways to ease their burden. Tenants will be provided with temporary housing while repairs are made to their units. 'For the unit owner, Yayasan Wilayah will step in to assist, as they still have an outstanding bank loan and the insurance does not cover the damage to the house,' he told reporters after handing over the aid at the temporary relief centre at Masjid Zaid bin Thabit in Desa Tun Razak. She also revealed that during the incident, the fire and rescue department discovered that the fire hose at the scene was missing, which delayed the firefighting efforts. Meanwhile, one of the victims, Nurhasyimah Mohd Hairizam, 23, reported an estimated loss of RM4,000 due to the fire. 'Our unit was completely ruined. Even the bed is no longer usable. I'm grateful because I've been informed that we'll be given transit housing while waiting for the repairs to be completed,' she told Bernama. Nurhasyimah said that during the 10 pm incident, she and her husband were asleep when they smelled smoke and immediately fled to safety. The fire affected units on the 13th to 17th floors of the PPR, involving seven families and a total of 25 victims. - Bernama

The Star
4 days ago
- The Star
Close to 500,000 affordable houses built under 12MP as of March
PETALING JAYA: A total of 492,360 affordable houses have been built as of March 31 of this year, says Nga Kor Ming. The Housing and Local Government Minister said that this means that Putrajaya has hit 98% of its target of constructing 500,000 affordable houses by 2025 under the 12th Malaysian Plan. "Up to March 31 this year, the Madani government achieved 98% of its affordable housing target, with 492,360 units in various phases of construction, including completed, under construction, and in planning throughout the country. "This commitment is implemented together by the federal government, state governments, and private developers," he said in a written Parliamentary reply dated July 31. Meanwhile, Nga said the Housing Credit Guarantee Scheme under the Syarikat Jaminan Kredit Perumahan Bhd (SJKP) has approved guaranteed loans totalling RM20.9bil based on 88,507 applications. "The SJKP allocations have also been increased by RM10bil this year, bringing the total allocations to RM30bil," he added. Nga also said the government is considering expanding the rent-to-buy scheme for the people's housing programme (PPR), considering changing trends where buyers are concerned about economic stability. "The rise in housing prices is due to various factors such as location, construction costs, infrastructure costs, land costs, compliance costs, as well as developer profits," he added. Nga also mentioned that based on the Basic Amenities Survey report 2022 by the Statistics Department, 76.5% of households in Malaysia own a home, while 20.3% are renting and about 3.3% reside in quarters. "The Ministry will continue efforts to ensure each resident has access to affordable, quality, and conducive housing," added Nga. Under the 13th Malaysian Plan unveiled last week, Putrajaya aims to build one million affordable housing units from 2026 to 2035.