logo
Coastal rail closed due to landslide risk to resume service between San Diego and Orange counties

Coastal rail closed due to landslide risk to resume service between San Diego and Orange counties

Yahoo30-05-2025
The coastal rail linking Orange and San Diego counties is expected to resume service next month after crews spent nearly six weeks reinforcing tracks that were subject to landslides and coastal erosion.
Service on the oceanside rail — which extends from Dana Point in south Orange County to the southernmost stops in San Diego County, including San Clemente, San Juan Capistrano and Oceanside — is set to resume June 7, according to an Orange County Transportation Authority update. The rail line, which serves Metrolink's commuter trains and Amtrak's Pacific Surfliner, was closed in April to begin construction.
The California Coastal Commission approved emergency construction last month after several sections of the rail, which lie below bluffs, were deemed unstable and at immediate risk of landslide and coastal erosion.
Crews placed 5,900 tons of large boulders, known as riprap, along the rail, which are intended to absorb flowing water and stabilize potential runoff that may obstruct the rail. Up to 240,000 cubic yards of sand will also be placed between two crucial points along the rail between Mariposa and North beaches. The OCTA said crews are preparing to construct a 1,400-foot-long catchment beside the rail, but noted that the construction schedule is still being determined.
Read more: Angels Flight announces price hike as iconic L.A. railway becomes latest victim of inflation
The OCTA estimated the total cost of the projects to be about $300 million.
In the update, the OCTA acknowledged the recurring interruptions to its passenger rail service: 'Over the past four years, San Clemente's eroding bluffs — on both city and private property — have repeatedly forced the closure of the rail line that has operated largely uninterrupted for more than 125 years.'
Work will continue daily between 6 a.m. and 6 p.m. before the rail's opening. Service on the Pacific Surfliner and Metrolink are still scheduled to resume normally starting June 7.
Sign up for Essential California for news, features and recommendations from the L.A. Times and beyond in your inbox six days a week.
This story originally appeared in Los Angeles Times.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Metrolink disruption with tram 'stuck' after overhead cables 'snap'
Metrolink disruption with tram 'stuck' after overhead cables 'snap'

Yahoo

time6 days ago

  • Yahoo

Metrolink disruption with tram 'stuck' after overhead cables 'snap'

Commuters are facing rush hour disruption after overhead power lines 'snapped' causing trams to be halted on a busy Metrolink line. An eyewitness said a stretch of cable 'snapped' near Weaste tram stop in Salford this afternoon. It has left a tram 'stuck' in the road heading towards Media City, they said. READ MORE: M602 traffic LIVE as motorway shut after crash with long delays - updates READ MORE: M6 traffic LIVE with motorway shut after 'really serious' crash and huge delays - updates There are currently no trams running between MediaCityUK and Eccles and they are likely to remain suspended for the rest of the day, Metrolink say. Never miss a story with the MEN's daily Catch Up newsletter - get it in your inbox by signing up here Ian Davies, Interim Network Director for Metrolink, said: 'Due to a tram pantograph getting tangled in the overhead line at Weaste, there is currently no tram service between MediaCityUk and Eccles. 'Engineers are on site and working to resolve the fault as soon as possible. 'Services between MediaCityUK and Eccles are likely to be suspended for the rest of the day. "We're sorry for any disruption this causes to people's journeys.' The Bee Network say on their website: "There is ticket acceptance in place on the 10, 33, 50, 52, 53, 67, 79, 100, 248 and 249 bus services. "Simply show the driver your Metrolink ticket or pass when boarding. "To continue your journey by bus, please visit our journey planner. "Please select 'options' and check only the bus icon is highlighted. Join the Manchester Evening News WhatsApp group HERE "This feature is also available on the Bee Network app where you can also find bus tracking information."

UCLA vs. UC Berkeley: Which California institution is the best in the country?
UCLA vs. UC Berkeley: Which California institution is the best in the country?

Los Angeles Times

time14-07-2025

  • Los Angeles Times

UCLA vs. UC Berkeley: Which California institution is the best in the country?

Who's really the No. 1 public university in the country? UCLA and UC Berkeley have staked their claims on social media after U.S. News and World Report's global rankings placed Berkeley as the top U.S. public university. Technically, it ranked No. 6, behind five private campuses, including Harvard, MIT and Stanford. But being the top public university on the global list was enough for Berkeley. It wasn't long before an influx of celebratory boasts spread on social media saluting the oldest UC campus. UCLA said not so fast. 'Still #1' went up on UCLA's TikTok account, citing another U.S. News national ranking of public universities that came out nine months ago, putting the Bruins in the top spot among public campuses in the nation. Fans and alumni of both schools have been sparring ever since, including proud Berkeley alum and Essential California writer Jim Rainey, who was too biased to write about this himself. It depends on which list you're referring to. As my colleague Jaweed Kaleem wrote, the U.S. News and World Report rankings differ in methodology and scope. The global list — which looks at 2,250 institutions both private and public — focused on academic research, including citations and regional reputation. On that list, UCLA ranked as the third-best public university in the country, behind the University of Washington in Seattle. Yet on the national list of public colleges and universities, UCLA takes first place, with Berkeley trailing behind it at No. 2. The national list homed in on the undergraduate experience at 1,500 campuses, weighing graduation rates, first-year retention, how well students from lower-income families perform, and the results of 'peer assessment surveys' sent to college presidents, provosts and deans of admissions. Although the rankings are popular as many campuses around the country covet the lists, they are controversial. Over the years, several prominent professional schools have pulled out of providing data to the U.S. News law school rankings. In 2022, UCLA's and UC Irvine's law school deans said they'd boycott the rankings because of the group's methodology, which they said disincentivized schools from supporting public service careers for their grads. In the competing world of list-makers, Berkeley beats Westwood overall. Sorry, UCLA. I promise Jim had nothing to do with this. Both campuses are great places to study. The schools share a lot more in common than not. After all, a bruin is a bear. Sergio Carabarin writes: 'Pfeiffer Beach in Big Sur.' Wayne Bernhardson writes: 'Sculptured Beach, Point Reyes National Seashore.' Email us at essentialcalifornia@ and your response might appear in the newsletter this week. Today's great photo is from Times photographer Myung J. Chun at AGWC Rockin' Rescue animal adoption center in Woodland Hills, which has taken in pets left behind after ICE raids. Jim Rainey, staff writerDiamy Wang, homepage internIzzy Nunes, audience internKevinisha Walker, multiplatform editorAndrew Campa, Sunday writerKarim Doumar, head of newsletters How can we make this newsletter more useful? Send comments to essentialcalifornia@ Check our top stories, topics and the latest articles on

50,000 in Greater Manchester have no buses - now it'll take years to fix
50,000 in Greater Manchester have no buses - now it'll take years to fix

Yahoo

time26-06-2025

  • Yahoo

50,000 in Greater Manchester have no buses - now it'll take years to fix

More than 50,000 people in Greater Manchester have no access to daytime bus or tram service — but it's set to take years to fix. Every bus in Greater Manchester was taken into the Bee Network on January 5, a major step in Andy Burnham's mission to create an integrated 'London-style' public transport system. But daytime Bee Network buses, Metrolink trams, and 'demand-responsive transport' such as ring and ride buses fail to stop within 400-metres of 51,309 people in the city, a new report has revealed. READ MORE: LIVE: Manchester services hit after train derails causing UK travel chaos - latest updates READ MORE: Police descend on Salford street with forensic tent on scene That means the Bee Network's 'minimum baseline connectivity level' is not met in 148 places. Another 388,525 people — more than the population of Wigan — have no access to a bus service that runs at least every half-hour, the report added. One proposed benefit of taking buses into public control was the ability to change services based on residents' needs, which the mayor promised would take place with regular 'network reviews'. However, the same report revealed it will take up to three years to implement the changes recommended by network reviews, with Trafford and parts of Manchester only seeing alterations in summer 2028. The first boroughs to get Bee Network buses, Wigan and Bolton in September 2023, will be first to see modifications, in autumn 2026. Alison Chew, the Bee Network's deputy director of bus, said it will take time because bosses 'looked back at connectivity assessment to get a baseline picture of Greater Manchester'. Although a huge proportion of buses have only been in public control for several months, some councillors were incensed by how long it will take to carry out the network review. Phil Burke said: 'We have been led up the garden path. It was supposed to happen after tranche one, and after tranche two, and there was supposed to be something at the end of last year. 'We have clearly been led astray by the bus team. The bus services we have in Rochdale are really bad. We need to address them.' However, 'early intervention' is being considered to improve services in two areas where buses do not arrive every hour, namely Horrocks Fold in Bolton and West Trafford. The other areas to get bus improvements sooner include Rusholme, Whalley Range, and Blackley New Road in Manchester; Ordsall Lane in Salford; and Alexandra Park in Oldham. Despite the need for improvements in some areas, the report said buses were getting more popular, with a 14pc increase in bus usage in the first areas to get the Bee Network. Three-quarters of Bee Network services were on-time in March 2025, compared to roughly two-thirds when they were run privately.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store