
Northeast Frontier Railway inks pacts for sustainable projects in Guwahati
A tripartite agreement was signed among NFR, Assam Pollution Control Board (APCB) and Kusum Udyog to develop Guwahati Railway Station into a 100 per cent plastic recycling hub.
A dedicated six-member task force led by the Station Superintendent, Guwahati, has been constituted to steer the initiative, a statement said.
'Efforts include improving garbage storage infrastructure, operationalising a compost-making plant and organising frequent passenger awareness drives," it said.
The second agreement signed with IIT-Guwahati focuses on the introduction of biodegradable and compostable bags to replace the existing packets used for bedroll distribution in AC coaches.
'The pilot will begin with the Brahmaputra Mail operating between Kamakhya and New Delhi with plans to scale the same initiative across all Guwahati and Kamakhya-based trains, and eventually to the entire NFR network," the statement said.
This initiative merges collaborative research with field-level implementation, targeting a shift towards eco-friendly and passenger-conscious alternatives, it added.
'By integrating environmental sustainability into its operational framework, NFR continues to lead in creating a cleaner and greener railway ecosystem for the zone," NFR Chief Public Relations Officer Kapinjal Kishore Sharma said. PTI TR TR SOM
view comments
First Published:
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Hindustan Times
4 hours ago
- Hindustan Times
Why United Airlines flight made emergency landing at Washington Dulles International Airport? ‘Attention all aircraft…'
An engine of United Airlines' plane with over 200 passengers on board suddenly collapsed, forcing the aircraft to make an emergency landing. United Airlines flight engine failure: The Federal Aviation Administration announced that it is looking into 'possible engine issues' that may have occurred on the United flight.(REUTERS) More than two hours after its scheduled departure time, Flight 108 left Washington Dulles at approximately 8 pm on Friday, July 25. After approximately 30 minutes in the air, the 12-year-old Boeing 787 Dreamliner returned to the airport, which is located just outside the country's capital. The Metropolitan Washington Airports Authority and United both issued different statements claiming that this was due to 'a mechanical issue.' More information about the incident was provided in air traffic control audio that was first posted to YouTube and then published by Also Read: Who is Los Angeles mass shooting suspect and what was the motive? United flight declares 'emergency, mayday' The flight bounded for Germany's Munich declared 'an emergency, mayday, mayday, mayday,' following the engine failure, as per the cockpit and air traffic control audio published on the YouTube channel You can see ATC. 'Engine failure, left engine,' a pilot can be heard stating. 'Attention all aircraft, fuel dumping in progress, 10 miles west of Dulles,' the tower can be heard sending an alert. United Airlines flight issues statement In a statement on Monday, United announced that the Boeing 787 carrying 219 passengers and 11 staff members had to return for Dulles International Airport when Flight 108 was en route to Munich. As the jet emptied fuel to make sure it was the right weight for landing, the records showed that the pilot and air traffic control calmly facilitated the return arrangements. The plane 'returned to Washington Dulles shortly after takeoff to address a mechanical issue,' as per the statement. 'The plane landed safely, and all passengers deplaned normally at the gate,' the Chicago-based jet continued. 'The flight was subsequently canceled and we arranged alternate travel arrangements to take customers to their destination as soon as possible.' FAA announces probe In a statement, the FAA announced that it is looking into 'possible engine issues' that may have occurred on the United flight. At 5:40 p.m. EST, Flight 108 was supposed to depart Dulles, fly over the Atlantic all night, and touchdown at Munich International Airport at 5:40 a.m. CEST the following day. However, the airline monitoring database FlightAware reports that this particular aircraft, Flight 108, departed Dulles at 6:11 p.m. EDT and returned to the same airport at 8:49 p.m.


The Hindu
12 hours ago
- The Hindu
Kerala shipwrecks: State to frame Oil Spill Contingency Plan
The Kerala government will frame an Oil Spill Contingency Plan (OSCP) after the recent two shipwrecks that raised a serious threat to the marine ecosystem and coastal environment. The Kerala State Pollution Control Board has awarded the work of preparing the plan to a Bangalore-based firm. It will include mapping of environmental sensitive index of oil spills along of the coast of Kerala and preparation of response-focussed contingency plans. The work, which included preparation of plans for crisis management and marine emergency response, is expected to be completed in eight months as per the work order issued by the board to the firm on June 27, 2025. The work is expected to be completed within eight months. The decision to prepare the OSCP, which was initially mooted in 2016, was finalised after Kerala witnessed two incidents off its coast involving two separate vessels – MSC Elsa 3 and MV Wan Hai 503 – on May 25, 2025 and June 9, 2025 respectively. It will include oil spill contingency planning guidelines, wildlife response plans, ship board pollution emergency plans and tactical oil spill booming/site response plans. Mitigation measures The OSCP will elaborate on the mitigation measures to be initiated in the wake of an emergency, policy and responsibility of various departments/agencies, oil spill risks and protection priorities, shoreline response operations, administrative action for shoreline clean-up, machines/equipment to be kept available in each department and database of authorities to be contacted in case of oil spills. It will identify the areas involving operation of fishing boats and ships and map all areas along the State's coast that are environmentally vulnerable. A detailed response plan with chain of command, duties and responsibilities, contact details, list of all available resources will be prepared. The plan will have the database of available machinery/ equipment for clean-up operations and details of the control equipment available in ports and harbours. The OSCP will be prepared in accordance with the guidelines of the National Oil Disaster Contingency Plan (NOS-DCP) of 2015, 2018 and 2024.


Scroll.in
12 hours ago
- Scroll.in
OSSC CRE Prelims 2025 final answer key released; here's how to check
The Odisha Staff Selection Commission (OSSC) has released final answer key of the Combined Recruitment (Preliminary) Examination for Junior Stenographer, Junior Grade Typist and Typist-cum-Scribe Assistant-2025 under Advt. No.1744/OSSC, dtd.03.04.2025. Eligible candidates can download the final answer key from the official website The results are expected to be announced soon. The OMR-based exam was conducted on July 27, 2025. The recruitment drive aims to fill 74 vacancies, of which 24 are for Junior Stenographer (District Offices) posts, 43 for Junior Stenographer, 05 for Junior Grade Typist, and 02 for Typist-cum-Scribe Assistant. Steps to download CRE final answer key 2025 Selection Process The applicants will be shortlisted on the basis of Preliminary exam, Main exam, Physical Standard Test, and Certificate Verification.