logo
Thesis Gold Announces 2025 Exploration Program and Mobilizes Crews to Lawyers-Ranch Project

Thesis Gold Announces 2025 Exploration Program and Mobilizes Crews to Lawyers-Ranch Project

Cision Canadaa day ago

VANCOUVER, BC, June 5, 2025 /CNW/ - Thesis Gold Inc. (" Thesis" or the "Company") (TSXV: TAU) (WKN: A3EP87) (OTCQX: THSGF) is pleased to announce the mobilization of crews for the 2025 exploration season at its 100%-owned Lawyers-Ranch Project, located in British Columbia's prolific Toodoggone Mining District. The Company is advancing work toward a Pre-Feasibility Study (PFS), targeted for release in Q4-2025. This season's program will lay critical groundwork for future engineering studies, with geological efforts focused on defining the project's broader potential. Concurrently, engineering and environmental initiatives will continue to de-risk the project ahead of the Environmental Assessment (EA) process, anticipated to begin in the second half of 2025.
2025 Program Highlights
Geological work:
10,000+ metres (m) of drilling will be split between resource expansion and testing undrilled prospects at Ranch.
A portion of this season's drill program will be directed toward follow-up drilling at the Ring zone, a discovery made in 2024 (see November 13th, 2024 news release entitled "Thesis Gold makes new near-surface discovery at the Ring zone).
Resource expansion drilling will target the Bingo and Steve zones, where the technical team sees significant upside to help unlock broader project-scale potential.
Thesis will test several new targets for near-surface epithermal-style mineralization while also advancing its understanding of deeper porphyry potential, as highlighted by geological, geochemical, and geophysical anomalies. The Toodoggone District remains significantly underexplored for porphyry systems, and this season's program will include drilling at multiple high-potential porphyry centers identified across the project area.
Thesis has contracted Simcoe Geoscience to conduct a 3D induced polarization (IP) survey. These data will be utilized in drill targeting later this season.
During the latter part of the summer, field crews will mobilize to the Company's satellite claim blocks, the North and East claims, to build on a successful preliminary mapping and prospecting program from 2024.
Engineering work:
5,000 m of multipurpose geotechnical drilling will provide preliminary information to allow the company to move swiftly from the 2025 PFS to further engineering studies in 2026.
Drilling aimed at characterizing the structural integrity of rock both within the resource and in the conceptual pit walls will support important project design criteria including pit slopes, underground mine geotech, and estimates for mine/pit inflow.
Additional metallurgical studies at both Ranch and Lawyers will help further classify rock comminution characteristics and optimize the processing flowsheet.
Additional geochemical sampling will go towards further classifying the acid-base conditions of mineralized and waste material.
Environmental studies:
The required two years of baseline data collection at Lawyers is complete, with ongoing studies focused on monitoring and upkeep.
Ranch is in the final months of baseline data collection. Biologists and hydrogeologists will be on-site this summer to continue characterizing the project's aquatic, terrestrial, geochemical, and meteorological components.
Dr. Ewan Webster, President and CEO, commented, "We are excited to launch the 2025 exploration season at our Lawyers-Ranch Project. Building on the momentum of previous years, this season's comprehensive geological, engineering, and environmental programs are focused on continued project de-risking and value creation. With over 15,000 metres of drilling planned, our objectives are to expand known resources, test high-priority new epithermal and porphyry targets, and support long-term development. Concurrent engineering and environmental baseline work will continue to underpin future technical studies and advance the environmental assessment process. These efforts reflect our commitment to efficiently advancing the Lawyers-Ranch Project as a premier precious metals asset."
The Lawyers-Ranch project offers significant exploration potential, with over 20 undrilled gold showings and numerous areas identified with promising geological, geochemical, and geophysical anomalies. This year, the Company plans to focus on anomalies within the Ranch project area that show promise for future discoveries (Figure 1). Throughout the winter, the technical team has been leveraging a robust geochemical and geophysical dataset to highlight a prospective corridor between Ring, Steve, Mandusa, and Golden Furlong at the Ranch area. The exploration potential in this region is twofold, as Thesis aims to leverage the opportunity for additional discoveries of shallow epithermal-style mineralization that have the potential to further unlock clues about the porphyry potential below the Ranch lithocap, with some deeper holes testing favorable structures and intersecting anomalies (Figure 2).
Dr. Evan Orovan, Chief Geologist, commented, "I am excited to get to the Lawyers-Ranch Project this summer to contextualize this winter's desktop work with some boots-on-the-ground geology. Drawing from my global experience in porphyry-epithermal systems, I expect to learn a lot from this summer's exploration program and our new targets at Ranch."
To date, Thesis has made significant progress in de-risking the Lawyers-Ranch Project. The upcoming PFS, targeted for release in Q4 2025, builds on the strong results of the Preliminary Economic Assessment (PEA) announced on September 5, 2024, which outlined an after-tax NPV5% of C$1.28 billion, a 35.2% IRR, and a 2.0-year payback period. Part of this summer's objective is to initiate key data collection to support a Feasibility-level engineering study, planned to commence immediately following the completion of the PFS.
Environmental baseline studies are critical to understanding site-specific conditions prior to project development. These studies require a minimum of two years of data collection covering air, water, soil, and biological resources. Once complete, ongoing monitoring ensures that the established baseline can inform accurate environmental modeling and support the EA process expected to kick off in H2 2025. This summer, biologists will complete the final months of baseline data collection at Ranch and continue monitoring efforts at both Ranch and Lawyers.
Quality Assurance and Control
Samples were analyzed at ALS Global Laboratories (Geochemistry Division) in Vancouver, Canada (an ISO/IEC 17025:2017 accredited facility). The sampling program was undertaken by Company personnel under the direction of Andrew Turner, P.Geol. A secure chain of custody is maintained in transporting and storing of all samples. Gold was assayed using a fire assay with atomic emission spectrometry and gravimetric finish when required (+10 g/t Au). Drill intervals with visible gold were assayed using metallic screening. Rock chip samples from outcrop/bedrock are selective by nature and may not be representative of the mineralization hosted on the project.
The technical content of this news release has been reviewed and approved by Michael Dufresne, M.Sc, P.Geol., P.Geo., a qualified person as defined by National Instrument 43-101.
Thesis granted an aggregate of: (i) 500,000 stock options (the "Options") to employees; (ii) 750,000 deferred share units (the "DSUs") to directors; and (iii) 1,500,000 RSUs to directors and an officer with all awards governed by the Omnibus Long-Term Incentive Plan and each applicable award agreement.
Each vested Option entitles the holder to purchase one common share of the Company (each, a "Common Share") at an exercise price of $1.20 per Common Share for five years from June 4, 2025 (the "Grant Date"). Half the Options vest on the first anniversary of the Grant Date, with the remaining vesting on the second anniversary of the Grant Date.
Each vested RSU entitles the holder to receive one Common Share on settlement. The RSUs vest upon the earlier of the termination date of the holder and ten years. Each vested DSU entitles the holder to receive one Common Share upon settlement. The DSUs vest and settle on the DSU holder's termination date.
On behalf of the Board of Directors
Thesis Gold Inc.
"Ewan Webster"
Ewan Webster Ph.D., P.Geo.
President, CEO, and Director
About Thesis Gold Inc.
Thesis Gold Inc. is a resource development company focused on unlocking the potential of its 100% owned Lawyers-Ranch Project, located in British Columbia's prolific Toodoggone Mining District. The recently completed Preliminary Economic Assessment (PEA) highlights robust project economics, including a 35.2% after-tax IRR and an after-tax NPV5% of C$1.28 billion, demonstrating the potential for significant value creation. The Company's 2025 roadmap includes a robust exploration and drill program, delivery of a Pre-Feasibility Study on the combined Lawyers-Ranch Project, and commencement of the Environmental Impact Assessment Process. Through these strategic moves, Thesis Gold intends to elevate the Lawyers-Ranch Project to the forefront of global precious metals ventures.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds from the Company's recently completed financings and the future plans or prospects of the Company. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results, performance, or achievements to be materially different from those expressed or implied by forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Other factors which could materially affect such forward-looking information are described in the risk factors in the Company's most recent annual management's discussion and analysis, which is available on the Company's profile on SEDAR+ at www.sedarplus.ca. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
SOURCE Thesis Gold Inc.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

‘The 401 is a nightmare:' Doug Ford doubles down on tunnel vision
‘The 401 is a nightmare:' Doug Ford doubles down on tunnel vision

CTV News

time36 minutes ago

  • CTV News

‘The 401 is a nightmare:' Doug Ford doubles down on tunnel vision

Premier Doug Ford is doubling down on his vision to build a tunnel underneath Highway 401, telling reporters that 'just because it hasn't been done, doesn't mean it can't be done.' Ford made the comment during an unrelated news conference on Friday when asked to make his pitch on why the tunnel should be included on a list of new 'nation-building' projects that Prime Minister Mark Carney hopes to fast track with legislation tabled in the House of Commons earlier in the day. 'The 401 is a nightmare, I don't even have to sell this. You can't even get around this city and then outside the city when you start going west and you start going east it is jammed everywhere,' the premier said. 'It is jammed because the visionaries who built the highway should have thought of this 40 or 50 years ago but we are visionaries and we are going to get it done. We are going to build that tunnel as sure as I am talking to you today.' Ontario has already begun the process of seeking interested parties to help carry out a feasibility study on a potential Highway 401 tunnel, with the deadline for the initial requests for proposals passing just last week. However, some experts have questioned how realistic the project is, given that it would likely cost billions of dollars and take decades to build. Carney's legislation, tabled Friday, includes several specific criteria for 'nation-building' projects, including that they strengthen 'Canada's autonomy, resilience and security,' provide 'economic or other benefits to Canada, have a 'high likelihood of successful execution,' advance 'the interests of Indigenous peoples' and contribute to 'clean growth and to Canada's objectives with respect to climate change.' Ford was asked whether the Highway 401 tunnel fit that ball on Friday and argued that it does due to the billions of dollars in lost productivity associated with Toronto's crippling traffic. 'You can't just think of next year. You have to be thinking of a generation or two generations, down the road,' he said. 'I go back to the 1950's when the Bloor Viaduct was being built and one of the people in the works department here said 'Let's put a rail on there' and that was before the subways and everyone criticized him. Well thank God they put the rail on there. This is the exact same thing.' Ford previously sent a letter to Carney in March outlining several projects that he would like to see funded. The Highway 401 tunnel was one of five projects on that list. The other projects include the development of Ontario's mineral-rich Ring of Fire region, nuclear energy generation, a new James Bay deep-sea port and an expansion of GO Transit infrastructure in the Golden Horseshoe known as 'GO 2.0.' Ford first floated the idea of building a tunnel underneath Highway 401 to divert traffic in September. He has suggested the tunnel could span from east of Highway 410 in Mississauga to east of Scarborough.

Westbridge Renewable Provides Update on Normal Course Issuer Bid
Westbridge Renewable Provides Update on Normal Course Issuer Bid

Cision Canada

timean hour ago

  • Cision Canada

Westbridge Renewable Provides Update on Normal Course Issuer Bid

TORONTO, June 6, 2025 /CNW/ - Westbridge Renewable Energy Corporation (TSXV: WEB), (OTCQX: WEGYF), (FRA: PUQ) (" Westbridge", " Westbridge Renewable" or the " Company") announced today that the TSX Venture Exchange (the " TSXV") has approved the commencement by Westbridge Renewable of a normal course issuer bid program (the " NCIB"). The Company wishes to clarify that the NCIB will commence on June 11, 2025 and will terminate on June 10, 2026 or on an earlier date if the maximum number of common shares sought in the NCIB has been repurchased, instead of June 9, 2025 and June 8, 2026, respectively, as previously announced. About Westbridge Renewable Energy Westbridge Renewable Energy Corp. originates, develops, and monetizes best-in-class, utility-scale solar PV projects. The Company has a portfolio of projects in four key jurisdictions, Canada, the U.S., the U.K., and Italy. Westbridge plans to deliver attractive, long-term returns by originating, executing, and developing an international portfolio of renewable assets for investors and utilities. Management has a strong track-record with 40+ projects developed worldwide, obtaining, and executing projects. As one of the very few listed pure-play Canadian solar development companies, Westbridge provides its investors with valuable access to greenfield solar projects. This means the Company can invest at the earliest stage of solar energy development benefiting from the full value chain, as well as the expected wider adoption of renewable energy going forward. Westbridge brings together regulators, corporate buyers, and landowners with the goal of delivering clean, sustainable electricity to end users. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward-Looking Statements Certain information set forth in this document contains forward-looking information and statements including, without limitation, purchases of the Shares made under the NCIB and the timing thereof, the duration of the NCIB, the management's business strategy, management's assessment of future plans and operations. Such forward-looking statements or information are provided for the purpose of providing information about management's current expectations and plans relating to the future, including the duration of the NCIB, the purchases of the Shares if at all, as there is no assurance the NCIB will be completed for the full term or at all. Forward-looking statements or information typically contain statements with words such as "anticipate", "believe", "expect", "plan", "intend", "estimate", "propose", "project", "potential" or similar words suggesting future outcomes or statements regarding future performance and outlook. Readers are cautioned that assumptions used in the preparation of such information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted as a result of numerous known and unknown risks, uncertainties and other factors, many of which are beyond the control of the Company. Although the Company believes that the expectations reflected in these forward-looking statements are reasonable, undue reliance should not be placed on them as actual results may differ materially from the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include risks and uncertainties relating to Company's ability to obtain regulatory approval or at all. The forward-looking statements contained in this press release are made as of the date hereof, and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, except as required by law. SOURCE Westbridge Renewable Energy Corp.

Government of Canada introduces legislation to build One Canadian Economy
Government of Canada introduces legislation to build One Canadian Economy

Cision Canada

time2 hours ago

  • Cision Canada

Government of Canada introduces legislation to build One Canadian Economy

OTTAWA, ON, June 6, 2025 /CNW/ - Today, the Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy, introduced new legislation to build a stronger, more competitive, and more resilient Canadian economy. One Canadian Economy: An Act to enact the Free Trade and Labour Mobility in Canada Act and the Building Canada Act, will remove federal barriers to internal trade and labour mobility, and advance nation-building projects crucial for driving Canadian productivity growth, energy security, and economic competitiveness. Advancing Major Projects The proposed legislation will accelerate the realization of major, nation-building projects that will help Canada become the strongest economy in the G7, deepen our trade relationships with reliable partners, and create good Canadian jobs. The federal government will determine whether a major project is in the national interest based on consultations with provinces, territories and Indigenous Peoples. Projects will be evaluated in accordance with the following criteria: Strengthen Canada's autonomy, resilience and security; Provide economic or other benefits to Canada; Have a high likelihood of successful execution; Advance the interests of Indigenous Peoples; and Contribute to clean growth and to Canada's objectives with respect to climate change. Projects will only be designated following full consultation with affected Indigenous Peoples. When a project is designated, it is conditionally approved upfront. The project will go through existing review processes, with a focus on "how" the project will be built as opposed to "whether" it can be. The federal major projects office will coordinate and expedite these reviews. The results, along with consultation with Indigenous Peoples, will inform a single set of binding federal conditions for the project. These conditions would include mitigation and accommodation measures to protect the environment and to respect the rights of Indigenous Peoples. The federal major projects office will include an Indigenous Advisory Council with First Nation, Inuit, and Métis representatives. The federal government will also allocate capacity funding to strengthen Indigenous Peoples' participation in this process. This legislation aligns with the Government of Canada's commitment to a 'one project, one review' approach, which means realizing a single assessment for projects and better coordination of permitting processes with the provinces and territories. The ultimate objective is to reduce decision timelines on major projects from five years down to two years. Canada will uphold its constitutional obligations to consult Indigenous groups to ensure projects proceed in ways that respect and protect Indigenous rights. We are committed to working in a way that respects our commitments to the implementation of the United Nations Declaration on the Rights of Indigenous Peoples Act and the principles of reconciliation, including economic reconciliation. Removing Internal Trade and Labour Mobility Barriers This new legislation builds one economy out of thirteen. It removes federal barriers to free trade within our borders while protecting workers, the environment and the health and safety of all Canadians. In cases where there is a federal barrier, the legislation will allow a good or service that meets comparable provincial or territorial rules to be considered to have met federal requirements for internal trade. For Canadian businesses, this will make it easier to buy, sell and transport goods and services across the country. On labour mobility, the new legislation will provide a framework to recognize provincial and territorial licenses and certifications for workers. This means that a worker authorized in provincial or territorial jurisdiction can more quickly and easily work in the same occupation in federal jurisdiction. This new legislation will make it easier to do business across Canada by removing regulatory duplication and cutting federal red tape. It will also reduce costs or delays for Canadian businesses who follow comparable provincial and territorial rules. Quotes "Canada's new government is building one Canadian economy. Today's legislation will remove federal barriers to internal trade, unleash Canada's economic potential, and get major, nation-building projects built faster across the country. It's time to build big, build bold, and build now." —The Rt. Hon. Mark Carney, Prime Minister of Canada "Our country thrives when we unite around a common purpose. In response to the evolving global trade landscape, the Government of Canada is taking decisive action to strengthen Canada's economy for generations to come. Through this legislation, we are giving ourselves the means to lift obstacles to economic growth and productivity, realize nation-building projects, create jobs and allow businesses to expand. Together with provinces and territories and Indigenous communities, we will make Canada the strongest economy in the G7." —The Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy "Trade within Canada is an essential driver of the Canadian economy, creating jobs, helping businesses expand, and enhancing consumer choice. Every year, more than $530 billion worth of goods and services move across provincial and territorial borders. This is equal to almost 20% of Canada's gross domestic product. That is with internal barriers holding us back. Imagine what we could achieve if people and goods flowed freely across borders in a truly unified Canadian market." —The Honourable Chrystia Freeland, Minister of Transport and Internal Trade "This new legislation is about building a stronger, more connected Canada—by making it easier to trade, faster to build big projects, and better at creating good opportunities for people, businesses, and Indigenous communities from coast to coast to coast. Energy and natural resources are Canada's power, and we will deliver projects that leverage these assets in order to strengthen our security, sovereignty, and economy." Associated Links Internal Trade Clean Growth Office First Ministers' statement on building a strong Canadian economy and advancing major projects Prime Minister Carney meets with premiers and shares his plan to build one strong Canadian economy Stay Connected SOURCE President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy Contact : For more information (media only), please contact: Gabriel Brunet, Office of the Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy, 819-665-6527, [email protected]; Laura Scaffidi, Office of the Honourable Chrystia Freeland, Minister of Transport and Internal Trade, 613-993-0055, [email protected]; Carolyn Svonkin, Office of the Honourable Tim Hodgson, 343-597-1725, [email protected]; Media Relations, Privy Council Office, 613-957-5420, [email protected]

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store