
Ground broken on new £18m railway station in Scotland
Once complete, Balgray station will feature two platforms connected by a footbridge with lifts, along with waiting shelters, ticket machines and secure cycle storage.
The project is part of the wider Glasgow City Region City Deal, which is focused on improving transport links, supporting economic growth and encouraging more sustainable development. It is being delivered by Network Rail in partnership with East [[Renfrew]]shire Council, Transport Scotland, ScotRail and Story Contracting.
READ MORE:
Scottish Government intervene in Glasgow O2 ABC site plans
'Another significant step forward' for city centre transformation
Margaret Gibb, commercial director at Network Rail Scotland, said: 'Breaking ground at Balgray is a major step forward in improving transport for the Barrhead area. The new station will make it easier for people to travel to and from Glasgow, and for locals and visitors to connect with places like Dams to Darnley Country Park.
'It's exciting to see work begin on a project that also supports active travel, encouraging more walking and cycling too. We're proud to be part of a partnership delivering real change and long-term benefits for people in Barrhead and the surrounding area.'
An 80-space car park at the station will include electric vehicle charging points, with new walkways linking the platforms directly to nearby housing developments and reservoir paths.
Artist's impression of the new Balgray station in Barrhead (Image: Network Rail Scotland)
A new bus turning circle and stop have already been delivered on Springfield Road by East Renfrewshire Council. This aims to strengthen the town's travel network, making it easier for people to switch between walking, cycling, bus and rail.
Councillor Owen O'Donnell, leader of East Renfrewshire Council, said: 'I'm delighted to see work start on the new Balgray station which will greatly improve transport links between Barrhead and other parts of East Renfrewshire with stations on the Neilston line - Williamwood, Whitecraigs and Patterton.
'Like many of our communities, Barrhead is growing, and this new station will also provide another route from the town into Glasgow. We're proud to be working with our partners on delivering this new station which is one of our biggest City Deal projects.'
Preparatory work and planning for the station began in October 2023, with the final proposal approved by the Glasgow City Region City Deal panel in September 2024. Construction will continue into next year, with the station expected to open to passengers in Autumn 2026.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BBC News
a day ago
- BBC News
Henley-Twyford branch line closes for five days for track work
A railway branch line is closing for five days for work to repair and replace sections of Rail said the line between Twyford in Berkshire and Henley-on-Thames in Oxfordshire would be shut until first thing on Saturday the branch line was closed in 2023 for work between Wargrave and buses, which do not follow the train route and have a different timetable, will run between Twyford and Shiplake via Henley. Network Rail said 100m of track, sleepers and ballast would be replaced while surveys and other maintenance would also be carried director Jason Pankhurst said: "Our engineers will be working around the clock to complete this important work which will keep trains running smoothly for passengers for years to come."Great Western Railway said it would accept season tickets on the branch line between Marlow and said valid rail tickets could also be used on the number 850 Carousel bus service between Henley and Twyford via Wargrave. You can follow BBC Berkshire on Facebook, X (Twitter), or Instagram.


Glasgow Times
2 days ago
- Glasgow Times
Plan to build five-bed houses close to Barrhead town centre
An application for planning permission in principle has been submitted to East Renfrewshire Council to build properties on land to the north-east of Dubbs Road. This land is at the rear of Montfort Gate/Montfort Park and opposite Cowan Park. Ramzan Properties hope to construct five detached four or five-bedroom villas that will sit slightly back from Dubbs Road. The application also outlines proposals for associated access roads, the upgrade of an existing access road and the formation of a passing place. READ NEXT: Project to explore viability of self-driving bus service in Glasgow READ NEXT: Mrs Brown's Boys and Strictly TV stars spotted at plush hotel near Renfrewshire Vehicle access to the development would be via Dubbs Road to the south of the site with two shared off-road driveways. It is planned that private driveways will be located to the front of each house offering three spaces each. The applicant's supporting statement said the development will 'promote town centre living' by providing detached family homes minutes away from essential local amenities, education centres and urban greenspace. They also said the development will 'help meet the local housing needs through dwellings that promote healthy lifestyle and wellbeing' and improve on the wider qualities and character of the area.' 'The preservation of trees and the introduction of new trees on site will support homes built in an attractive natural space and assist the surrounding biodiversity of the area,' they added. The application, which is currently awaiting decision, was received by the council in May and validated last week.


BBC News
3 days ago
- BBC News
Rail passengers warned ahead of Redhill to Tonbridge line closure
Rail passengers have been warned to check before they travel ahead of a 10-day line will replace Southern trains from 16 to 25 August as 13 miles (20.9km) of high voltage power cables are renewed between Nutfield and Leigh in on the line between Redhill and Tonbridge, in Kent, to protect the track from landslips and replace worn-out rails will also take place, Network Rail McAuliffe, Network Rail Sussex route director, said: "We know there is never a good time to close the railway and appreciate passengers managing changes to their journey while the line is closed." The railway embankment near Edenbridge will be strengthened with a 360-metre-long steel wall either side of the track following disruption caused by landslips in recent 11 bridges will undergo structural inspections and 200m of rail will be replaced at Godstone. During the works, there will be no trains between Redhill and Tonbridge. Instead, replacement buses will are expected to take longer than usual and passengers are urged to allow extra time, Southern McAuliffe added: "By working over ten consecutive days in August, we can get the work done much more quickly and avoid weekend after weekend of bus replacement services, which we know is frustrating for our passengers."It also means we won't disrupt school and college students, who make a significant percentage of passengers on the route in term time."