
South Africa: eThekwini Municipality tackles water challenges; Durban beachfront set for facelift
The eThekwini Municipality will continue to work on various interventions to manage and reduce the increase in water demand that has resulted in the recurring disruption of water supply.
To manage the demand and to build storage, the municipality has implemented rationing in many areas, especially in the northern and southern areas.
In a statement issued on Tuesday, the municipality noted that demand currently exceeds supply by approximately 100 megalitres a day, resulting in further strain on the system.
This is due to the current curtailment measures that were implemented by uMngeni-uThukela Water in October last year.
'To augment the water supply, comprehensive plans have been set in motion in collaboration with the national Department of Water and Sanitation and uMngeni-uThukela Water to construct and commission the uMkhomazi Dam, a pivotal project to augment water supply to the city,' the municipality said.
The municipality is also actively implementing various medium-term interventions, including infrastructure upgrades, pipeline replacements, and a comprehensive leak detection and repair programme.
The installation of pressure management valves, dysfunctional meter replacements, the incorporation of technology to enhance meter accuracy, and improvements in billing and debtor management, are also being implemented.
'Currently, areas in the West of the city are experiencing intermittent supply due to the shutdown of the 53 Pipeline by uMngeni-uThukela Water. This was done to allow the South African National Roads Agency (Sanral) to relocate approximately 200m of the 53 Pipeline, as part of its N3 upgrade project,' the municipality said.
Durban's beachfront set for major overhaul
Meanwhile, Durban's iconic beachfront is set to undergo a major transformation, with a complete facelift and redevelopment of the buildings along the promenade.
Over the past few years, changes have been made to improve the offering to visitors on the beachfront, ensuring that it remains a world-class facility.
Head of the Real Estate Unit, Thapelo Mmusinyane noted that as tenant leases expire, the municipality follows proper process to invite bids for the development of innovative new spaces and eateries that will elevate the beachfront experience.
This forms an integral part of the City's Proactive Land Release Strategy, which was adopted in September 2021.
The strategy enables the city to proactively manage surplus land, assisting the city to achieve its developmental objectives, stimulate economic activity and Black economic empowerment, and promoting economic transformation in the property sector.
Mmusinyane explained that between May 2021 and November 2022, 25 properties were put up for bid, with 10 new leases being awarded to companies 100% owned by historically disadvantaged individuals.
'All 10 awards were made to companies that are 100% owned by historically disadvantaged individuals. On the beachfront in particular, properties that have been affected are Circus, Bike and Bean, and Minitown.'
Mmusinyane added that the historic building in which Joe Cools and other eateries are housed, will be upgraded soon by a developer, who will then sublet the space to suitable tenants.
He assured the public that a fair, equitable, and transparent process was followed as stipulated in Section 14(5) of the Municipal Finance Management Act (MFMA).
'This section mandates that the disposal, including leasing of municipal properties must adhere to principles of fairness, equity, transparency, and competitiveness in line with the City's Supply Chain Management Policy (Section 111 of the MFMA).
'Renewing the leases without an open, competitive process would have violated these principles, as well as Section 217(1) of the Constitution, which upholds the same standards for public procurement. Therefore, lease renewals could not be granted without contravening the law,' he explained.
All rights reserved. © 2022. Bizcommunity.com Provided by SyndiGate Media Inc. (Syndigate.info).
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Zawya
08-05-2025
- Zawya
Infrastructure is the lifeline of South Africa's GNU
As South Africa's Government of National Unity (GNU) charts its course despite challenges, the spotlight remains on delivery – and few areas are as urgent or promising as infrastructure. The stark reality is undeniable: despite years of investment and policy reform, much of South Africa's economic infrastructure continues to underperform. As President Cyril Ramaphosa candidly acknowledged in his State of the Nation address this year, 'In many cities and towns across the country, roads are not maintained, water and electricity supply is often disrupted, refuse is not collected and sewage runs in the streets.' These challenges are evident in three key sectors: Energy infrastructure Eskom has shown modest improvements but continues to grapple with significant operational challenges. A recent report by the Council for Scientific and Industrial Research shows that load shedding cost the South African economy approximately R2.9tn in 2023. While load shedding has become less frequent, 'load reduction' continues to affect previously disadvantaged communities disproportionately, widening existing inequality gaps. Water infrastructure The Department of Water and Sanitation has reported alarming water losses in municipalities, averaging 41% due to theft, leaks and bad management. The breakdown in water infrastructure requires a fundamentally different approach to energy challenges, given that water is a finite resource in an already water-stressed country. The economic ramifications of water shortages are particularly severe, with some municipalities unable to support industrial expansion due to insufficient supply capacity. Logistics infrastructure Transnet's rail network remains critically underutilised. In its annual report for 2023/24, the parastatal acknowledges that it 'has faced several challenges that have threatened the sustainability of the organisation and compromised the efficiency of its operations'. The report also states that 'these challenges were further compounded by locomotive shortages and their unreliability due to wear and tear, critical equipment breakdowns, ongoing security incidents and infrastructure challenges". Perhaps most concerning is South Africa's ports performance. The World Bank's Container Port Performance Index 2023 placed Cape Town as the worst performer globally while Durban – Africa's busiest container terminal – is ranked 398 out of 405 ports assessed. At Ntiyiso Consulting Group, we suggest these strategic approaches for immediate impact: 1. Asset management optimisation The fastest path to meaningful impact lies not in new construction but in smarter management of existing assets. Across all sectors – water, energy, roads and rail – hundreds of billions of rands' worth of infrastructure operates far below optimal capacity. Rather than defaulting to new builds, priority must shift to extracting maximum value from existing infrastructure. At Ntiyiso Consulting Group, we've observed that adopting a total-cost-of-ownership mindset – where infrastructure is valued not just by construction cost but long-term performance – can significantly improve return on investment. If the GNU is looking for quick wins, this is where to begin. 2. Economic impact-driven project selection Infrastructure earmarked for development must go beyond concrete and compliance. Every project should be assessed for its economic impact – not just in terms of job creation, but in how it contributes to GDP, poverty alleviation, local industry growth and long-term value chains. South Africa already has the necessary frameworks. They include Infrastructure South Africa's project-preparation methodologies and the Development Bank's economic impact assessment tools. What's required now is the consistent application of these tools. The objective must be prioritising catalytic infrastructure: projects that unlock potential across multiple sectors and create economic momentum in previously overlooked municipalities. This is how we shift from infrastructure as expenditure to infrastructure as investment. 3. Municipal capacity-building No infrastructure strategy, however well conceived, will succeed without capable implementing institutions – particularly at municipal level. Local governments serve as the ultimate custodians of water, electricity, sanitation and road networks. Yet many municipalities face critical shortages of technical skills, systems and governance frameworks to manage these assets effectively. Simple technology- and data-driven interventions could yield immediate improvements in municipal infrastructure management, addressing an existential threat in the water sector. A core focus at Ntiyiso Consulting Group is strengthening municipal capacity through targeted interventions. In one local municipality, for example, our team successfully restarted its wastewater treatment works after several years of inactivity, demonstrating how providing technical support can truly improve infrastructure. 4. Private-sector partnerships Despite budget constraints, the infrastructure gap can be overcome. The private sector has demonstrated what is achievable when provided with the right frameworks. The Sembcorp Siza Water Concession – a contract aligned with public-private partnership strategic goals that supports the Ilembe District Municipality in fulfilling service delivery – exemplifies this potential. The initiative ensures that the communities it serves have access to clean, safe and adequate water supplies. Siza Water has outperformed many public utilities in terms of service delivery and affordability, reducing water loss rates to less than 15%, significantly below the national average of over 40%. Similarly, South Africa's Renewable Energy Independent Power Producer Procurement Programme has attracted billions in private capital while diversifying the energy mix. These models show that when public-private partnerships are structured with clarity and accountability, they can deliver real, lasting results. Reimagining infrastructure governance A truly transformative approach to infrastructure management would involve treating each major infrastructure component as an independent business entity. This would require establishing separate entities with dedicated balance sheets and governance structures, operationally distinct from municipalities. Such entities would feature professional management teams and independent boards, directly accountable for performance metrics and required to deliver dividends to their shareholders (the municipalities). This model would introduce private-sector discipline to infrastructure management while reducing opportunities for wasteful expenditure and improper procurement. The structure would also improve accountability and attract private investment by providing greater confidence that revenues would be properly managed. Addressing procurement shortcomings and providing targeted support to municipalities would further reduce financial leakages. Despite significant challenges, there are grounds for optimism regarding infrastructure development. With focused interventions, South Africa could achieve GDP growth beyond the 3% target. The key lies in accountability: by implementing systematic changes that hold stakeholders responsible for infrastructure performance and financial management, South Africa can begin to realise the potential of its infrastructure investments. The GNU's legacy will largely be determined by its ability to translate infrastructure vision into tangible implementation – transforming South Africa's infrastructure from a constraint to a catalyst for inclusive growth.


Zawya
06-03-2025
- Zawya
South Africa: eThekwini Municipality tackles water challenges; Durban beachfront set for facelift
The eThekwini Municipality will continue to work on various interventions to manage and reduce the increase in water demand that has resulted in the recurring disruption of water supply. To manage the demand and to build storage, the municipality has implemented rationing in many areas, especially in the northern and southern areas. In a statement issued on Tuesday, the municipality noted that demand currently exceeds supply by approximately 100 megalitres a day, resulting in further strain on the system. This is due to the current curtailment measures that were implemented by uMngeni-uThukela Water in October last year. 'To augment the water supply, comprehensive plans have been set in motion in collaboration with the national Department of Water and Sanitation and uMngeni-uThukela Water to construct and commission the uMkhomazi Dam, a pivotal project to augment water supply to the city,' the municipality said. The municipality is also actively implementing various medium-term interventions, including infrastructure upgrades, pipeline replacements, and a comprehensive leak detection and repair programme. The installation of pressure management valves, dysfunctional meter replacements, the incorporation of technology to enhance meter accuracy, and improvements in billing and debtor management, are also being implemented. 'Currently, areas in the West of the city are experiencing intermittent supply due to the shutdown of the 53 Pipeline by uMngeni-uThukela Water. This was done to allow the South African National Roads Agency (Sanral) to relocate approximately 200m of the 53 Pipeline, as part of its N3 upgrade project,' the municipality said. Durban's beachfront set for major overhaul Meanwhile, Durban's iconic beachfront is set to undergo a major transformation, with a complete facelift and redevelopment of the buildings along the promenade. Over the past few years, changes have been made to improve the offering to visitors on the beachfront, ensuring that it remains a world-class facility. Head of the Real Estate Unit, Thapelo Mmusinyane noted that as tenant leases expire, the municipality follows proper process to invite bids for the development of innovative new spaces and eateries that will elevate the beachfront experience. This forms an integral part of the City's Proactive Land Release Strategy, which was adopted in September 2021. The strategy enables the city to proactively manage surplus land, assisting the city to achieve its developmental objectives, stimulate economic activity and Black economic empowerment, and promoting economic transformation in the property sector. Mmusinyane explained that between May 2021 and November 2022, 25 properties were put up for bid, with 10 new leases being awarded to companies 100% owned by historically disadvantaged individuals. 'All 10 awards were made to companies that are 100% owned by historically disadvantaged individuals. On the beachfront in particular, properties that have been affected are Circus, Bike and Bean, and Minitown.' Mmusinyane added that the historic building in which Joe Cools and other eateries are housed, will be upgraded soon by a developer, who will then sublet the space to suitable tenants. He assured the public that a fair, equitable, and transparent process was followed as stipulated in Section 14(5) of the Municipal Finance Management Act (MFMA). 'This section mandates that the disposal, including leasing of municipal properties must adhere to principles of fairness, equity, transparency, and competitiveness in line with the City's Supply Chain Management Policy (Section 111 of the MFMA). 'Renewing the leases without an open, competitive process would have violated these principles, as well as Section 217(1) of the Constitution, which upholds the same standards for public procurement. Therefore, lease renewals could not be granted without contravening the law,' he explained. All rights reserved. © 2022. Provided by SyndiGate Media Inc. (


Zawya
03-03-2025
- Zawya
Nigeria: Short-term interest rates to trend low on over $2bln expected liquidity inflows
Nigeria's financial markets are poised for a significant influx of liquidity, with over N3 trillion expected to flood the system in the short term. This substantial liquidity injection is anticipated to have a profound impact on short-term interest rates, which are likely to trend lower as a result. The impending liquidity surge, driven by factors such as maturing treasury bills and bond repayments, is expected to increase the amount of money available for lending, thereby exerting downward pressure on short-term interest rates. Dealers from Cowry Assets Management Limited in a note to investors observed that given these conditions, short-term interest rates are likely to remain under pressure, with investors closely monitoring developments in the fixed-income space for strategic positioning. 'Looking ahead, we anticipate a further decline in money market rates in the coming week as liquidity inflows continue to shape market dynamics. Another tranche of N1.7 trillion from FAAC allocations is expected to permeate the financial system, sustaining the current liquidity uptrend. Additionally, maturities worth N50 billion from Open Market Operation (OMO) bills and N1.27 trillion from Treasury Bills will enter the market, further bolstering liquidity levels, ' Cowry Assets Management stated. Meanwhile, the Nigerian money market witnessed a significant increase in liquidity last week following a substantial inflow of N1.7 trillion from the Federation Account Allocation Committee (FAAC). This excess liquidity led to a sharp decline in the Nigerian Interbank Offered Rate (NIBOR) across all tenors, reflecting reduced funding pressures among financial institutions. Industry participants observed that the Overnight NIBOR saw the steepest drop, plunging by 438 basis points to settle at 28.54 percent. Similarly, the one-month, three-month, and six-month NIBOR rates declined by 17 basis points, 36 basis points, and 84 basis points, respectively, highlighting the impact of the liquidity surplus in the interbank market. The decline in market rates according to dealers, was also evident in the broader money market, as both the Overnight (OVN) rate and the Open Buy Back (OPR) rate moderated, closing the week at 26.75 percent and 27.33 percent, respectively. This occurred despite the Debt Management Office (DMO) settling N910.4 billion worth of Federal Government bonds, which temporarily absorbed some liquidity from the financial system. In the Nigerian Treasury Bills (NTB) market, the Nigerian Interbank Treasury Bills True Yield (NITTY) declined across most tenors,exceptf the one-month NITTY, which rose by 21 basis points. This suggests that investors are shifting focus towards short-term securities, likely in response to prevailing money market conditions and expectations of further liquidity inflows. Meanwhile, the three-month, six-month, and twelve-month NITTY rates trended lower as market participants exited the secondary market in anticipation of an upcoming robust Primary Market Auction (PMA) for Treasury Bills this week. The secondary Treasury Bills market saw a moderate bullish sentiment, as the average yield declined by 35 basis points week-on-week. This downward movement in yields was largely driven by increased demand across various maturities, as investors sought to lock in favourable rates ahead of the expected liquidity surge. Copyright © 2022 Nigerian Tribune Provided by SyndiGate Media Inc. (