
Attention BPSC aspirants: BPSC postpones 71st CCE Prelims Examination 2025, now the exam will be held on...
BPSC 71st CCE Prelims Postponed: In a significant development for Bihar students who are planning to give the BPSC exam this year, the Bihar Public Service Commission (BPSC) has postponed its 71st Integrated Combined Competitive Preliminary Examination 2025. The commission also notified that the Assistant Section Officer, BPSC (Preliminary) competitive exam under the advertisement number – 37/2025 is going to be conducted on September 10th instead of September 13th 2025 allegedly switching the exam schedules for both the exams. BPSC CCE Prelims Exam: What's the new date?
Students should note that the BPSC 71st integrated exam, which was going to take place on September 10th will now take place on September 13th, 2025. The official notification accredited to the BPSC exam's controller can be referred by the candidates interested via following link bpsc.bihar.gov.in/Notices/NB-2025-07-04-01.pdf
The total number of vacancies comes out to a sum of 1,298 after addition of 34 vacancies to the 71st CCE by the BPSC. BPSC CCE Prelims Exam: Check Eligibility
⦁ Candidates must hold at least a graduation degree. ⦁ Graduation equivalent degrees are also considered.
⦁ Additionally, candidates must meet a post-wise age limit to be eligible to appear for the exam. BPSC CCE Prelims Exam: Vacancies
For female candidates, the recruitment drive consists of 429 female vacancies out of 1,298 total vacancies. BPSC CCE Prelims Exam: About
The prelims for BPSC CCE examinations filters out proficient candidates and allows them to further appear for the BPSC CCE mains examinations. The exam is an objective based examination with 150 multiple choice questions (MCQs) that are to be attempted within 120 minutes. Candidates will be awarded 1/3rd negative marking for each wrong answer in the prelims. BPSC CCE Prelims Exam: What's the Exam Fees
Notably, candidates are required to pay Rs 200 for biometrics and Rs 600 for the test. Candidates reserved under SC, ST candidates of Bihar, female candidates who are permanent residents of Bihar and persons with disability (PWD) with more than 40% are required to pay a sum of Rs. 150 only.
Candidates are advised to refer BPSCs official website for any additional information: bpsc.bihar.gov.in
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
3 hours ago
- Time of India
Union min Pradhan lays foundation of infra projects in CU Punjab
Bathinda: Union minister of education on Tuesday virtually laid the foundation stone of infrastructure projects worth Rs 200.99 crore at the Central University of Punjab (CU Punjab), Bathinda. Tired of too many ads? go ad free now The ceremony was part of a nationwide initiative to launch infrastructure projects at centrally funded higher education institutions under the ministry of education. During the day, the minister virtually laid the foundation stone for the academic block, a 600-seater boys' hostel, a 400-seater girls' hostel, a 100-seater international students' hostel, and the vice-chancellor's residence. Several of these buildings are designed in compliance with GRIHA-IV norms, incorporating green, energy-efficient, and sustainable features such as sensor-based lighting, solar energy systems, aseismic structures, zero-waste water systems, and full accessibility for differently-abled persons. Pradhan lauded the proactive role of higher education institutions in implementing NEP 2020, particularly in advancing multidisciplinary education, digital inclusion, skill development, and inclusive learning. He highlighted the notable improvements in rural learning outcomes through initiatives like the NIPUN Bharat Mission and emphasised that this progress is the result of collective efforts by educators, students, institutions, and state govts. Vice-chancellor Prof Raghavendra P Tiwari emphasised that these developments would propel CU Punjab towards becoming a world-class institution with state-of-the-art facilities for teaching, research, and student well-being. MSID: 122975566 413 |


Time of India
4 hours ago
- Time of India
Areas near Hubballi airport lack drinking water for 20 years
Hubballi: Jagadish Nagar and Ram Nagar, located next to Hubballi Airport in Ward No. 32, continue to suffer from a lack of drinking water supply for the past 15-20 years. While most HDMC wards received 24x7 water supply or have ongoing work, these two areas remain excluded. Despite repeated appeals by residents for pipeline connections, there is no response from authorities. Locals expressed frustration over being left out of essential urban infrastructure. According to a source, these areas are located at HDMC Ward No. 32. A total of 612 houses were built here under the Ashraya scheme. However, due to lack of amenities, many of the owners locked their houses and are living elsewhere. 120 poor families are living here because they cannot afford to shift to another area. Rajeshwari Sutar, a resident of Ashraya Yojane, said that in recent years, villages have also been improving. Concrete roads, piped water supply to every house, street lights, sanitation, and other basic amenities are seen in villages. She said that every year during the rainy season, it was impossible to even walk on roads here. "If the roads here are also asphalted or concreted, it will facilitate commuters. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like See the AI App Making Headlines Across the UK — Book Your Spot Kapital Wolf Undo There are no medical facilities and Asha workers are not visiting. Govts that spend hundreds of crores of rupees to upgrade the airport to international standards have no will to provide basic facilities like drinking water," she said. Shankarappa Harijan, corporator of HDMC Ward No. 32, said he requested HDMC seeking 24x7 drinking water supply. The drinking water is being supplied from Neerasagar to around 13 to 15 wards. Till Tarihal industries area, the pipeline was installed. Now the water is supplied from the tanker once a week, he said. Shivakumar Gokavi, Ashraya committee member, said that around Rs 10 crore grant was announced in the budget to provide basic amenities. The grant should be provided soon, he urged. Manjunath Daivajna, assistant executive engineer, KUIDFC, said that continuously the drinking water is being supplied through a tanker as per request. The 24x7 drinking water project is not included. In the second phase, some areas will be included for 24x7 drinking water, he said.


NDTV
5 hours ago
- NDTV
On Camera, Elephant Chases Workers Near Coffee Estate In Karnataka
Over 15 estate workers narrowly escaped a wild elephant that charged at them near a coffee estate in Pollibetta, Kodagu (Coorg), on Monday morning. The incident was caught on camera. The footage, dated July 28, shows a group of workers breaking into a frantic run. Moments later, an elephant is seen charging down the same road. The workers manage to flee into a gated compound just in time, with the elephant following closely behind. The elephant approached the compound gate, appearing to push it open. But it stopped, turned around, and disappeared into the surrounding bushes. Though no injuries were reported, the close call has left estate workers too fearful to return. Many have stayed away since the incident and are demanding swift action from authorities to ensure their safety. Forest officials have announced plans to conduct a drive on Wednesday to steer the elephant back into its natural habitat. Kodagu, known for its dense forests and coffee plantations, has witnessed a rise in human-elephant conflicts in recent years due to habitat loss and shrinking corridors for wildlife movement. Located in the Western Ghats, these lands once supported elephant corridors, but over the past two decades, forest cover has declined by about 18 per cent, with nearly 46 per cent lost in dry deciduous areas, forcing elephants into nearby human-dominated zones. At least 44 people have died in wild elephant attacks in Kodagu between 2019 and 2024, reported The Kodagu Express. Hotspots include Madikeri taluk, the Nagarahole Tiger Reserve periphery, and Virajpet. With around 2,000 elephants living in Kodagu (nearly a third of Karnataka's entire elephant population), encounters have become more frequent and intense. To address the crisis, the Karnataka government has sanctioned Rs 40 crore for immediate mitigation. Measures include trenching, railway barricades, solar fencing, and elephant-proof trenches in high-risk areas like Virajpet. A major component of this plan is the proposed relocation of 185 conflict-prone elephants, especially from southern Kodagu and the Kutta border zone. The state is also investing in science-driven solutions. A Rs 4.7 crore partnership between the Forest Department and the Indian Institute of Science (IISc) aims to study elephant behaviour, track movements via satellite, and develop predictive models to prevent future conflict. The five-year study will also focus on mapping historical migration corridors and understanding the health and stress levels of these elephants.