
Cabinet Division: NA approves Rs81.45bn demands for grants
Federal Finance Minister Muhammad Aurangzeb presented demands for grants in the House for approval.
The opposition members severely criticised the performance of the Cabinet Division and said that the total strength of Cabinet of the Prime Minister should not be increased beyond 11 percent of total members of the National Assembly under 18th Constitutional Amendment.
Opposition members Alia Kamran, Malik Aamir Dogar, Ali Muhammad, Khawaja Sheraz and others criticised the performance of the Cabinet Division.
Khawaja Sheraz said that there is Rs6 billion budget allocation of the National Assembly Secretariat while the allocation of Cabinet is Rs44 billion. He said, 'there is huge budget of Cabinet Division but its performance is zero.'
Ali Kamran said that the government affairs run through Cabinet and its strength should not increase beyond 11 percent of the total strength of the National Assembly. She said that the government has crossed the limit by appointing special assistants and advisers.
The demands for grants which were presented by the finance minister include, emergency relief and repatriation, atomic energy, Pakistan nuclear regulatory authority, Naya Pakistan Housing Development Authority, Prime Minister's Office (Internal), Prime Minister's Office (public), National Disaster Management Authority, Board Of Investment, Prime Minister's Inspection Commission, Special Technology Zone Authority, National Anti-Money Laundering and Counter Financing Terrorism Authority, Cannabis Control and Regulatory Authority, Establishment Division, Federal Public Service Commission, Federal Public Service Commission, National School Of Public Policy, Civil Services Academy, National Security Division, Council Of Common Interests, (Secretariat, Special Investment Facilitation Council Division (SIFCD), Intelligence Bureau Division, development expenditure of Cabinet Division, development expenditure of Board of Investment, development expenditure of Special Technology Zones Authority Division, development expenditure of Establishment Division and capital outlay on development of atomic energy.
While winding up the discussion on the cut motions, Federal Minister for Parliamentary Affairs Dr Tariq Fazal Chaudhary said that the size of the federal cabinet is well within the constitutional limit, and the country's economy is showing signs of improvement.
He rejected all motions moved by the opposition and defended the performance of the cabinet.
Fazal explained that under Article 92(1) of the Constitution, the federal cabinet cannot exceed 11 per cent of the total National Assembly membership. 'The current cabinet has 42 members, which is four less than the allowed limit of 46,' he said.
He said that when the present government took office, Pakistan was facing a severe economic crisis and risked default. 'Today, economic indicators are stable, and key sectors are recovering,' he stated.
He said that the government has revived the China-Pakistan Economic Corridor (CPEC), introduced tax reforms, and is promoting investment in sectors such as energy and agriculture. 'The energy sector has undergone major reforms, and initiatives in agriculture are effectively addressing long-standing challenges,' he added.
Fazal said that the Special Investment Facilitation Council (SIFC) has played a major role in attracting billions of dollars in foreign investment. 'The SIFC was created to remove hurdles in investment and ensure timely project implementation,' he explained.
Copyright Business Recorder, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
7 hours ago
- Business Recorder
Scheduled disasters
This year's monsoon has reiterated the 'preconceived notion' that our government has historically let every problem go under the carpet. The floods of 2022 caused unprecedented damage; a stark manifestation of deforestation, mismanagement, and a clear lack of resource allocation. Despite the devolution of the Disaster Management Authorities post the 18th Amendment to the provinces, there has been little or no contingency planning for rain-induced disasters. Those who credited good governance for the last two years' calm may want to reconsider; it was luck, not leadership that spared us. A lack of precipitation simply left our fragile contingency systems unexposed till the worst came. Alas! If only adding words to the Constitution could alleviate the plight of citizens. Article 9-A which was added in October 2024 to the Constitution, was supposed to provide every Pakistani with a 'clean and healthy environment.' Things have shaped up differently though, and the numbers tell a very different tale, with 645 dead and over 900 injured nationwide in monsoon-related disasters since June 26, including 327 deaths in KP alone over the past week. The NDMA's 2025 Monsoon Infrastructure Guidelines were released on schedule, emphasizing pre-disaster planning. These protocols just seem like a duplication, mimicking guidelines issued from 2022, which themselves echoed 2020's version. One might conclude that disaster management, like much else, has merely been reduced to an annual copy-paste exercise. Supreme Court Justice Mansoor Ali Shah said in July that delays in climate reforms endanger citizens' fundamental rights under Article 9-A, noting that climate finance is essential to upholding rights to life and dignity. Parliament had already responded by passing Article 9-A. The floods arrived anyway apparently unaware of their 'unconstitutionality'. So unconstitutional, in fact, that they claimed even those attempting rescue operations—a government helicopter crashed in Mohmand during relief efforts, killing five crew members. A day of mourning was announced for those who died trying to save others from our scheduled catastrophes. In May this year, the IMF approved a $1.4 billion climate loan to help Pakistan build resilience to natural disasters through 'strengthening public investment processes' and 'improving coordination'. Interestingly, just two months after the loan's approval, tourists were being swept away on Babusar Road in July. As of now, there have been five dead, fifteen missing after a cloudburst that everyone saw coming except those responsible for seeing it coming. The search for missing tourists along the Babusar Highway concluded after fourteen days with funeral prayers held in absentia, proving that our rescue operations, like our monsoons, operate on their own precarious schedules. The coordination between the loan's approval and its implementation appears to have encountered familiar delays. As of Aug 16, 2025, no funds under the IMF's climate facility have been disbursed; the May release was from the EFF, not the RSF. For those seeking more tangible evidence of our progress, consider the multi-million-dollar early warning system installed in the Bagrot Valley under the UNDP-funded GLOF-II Project. On August 2nd, when a glacier burst killed a 10-year-old boy and injured his father, the system reiterated the government's inefficiency and played its part by remaining silent, according to local reporting; official confirmation is pending. The Shishper Glacier, apparently unimpressed by our warning systems, produced its most severe outburst since 2018 on August 11th, giving communities a preview of worse to come. Opposition leaders, ever ungrateful, have alleged 'large-scale corruption' in such protection projects, which brings to light why we installed this expensive system in the first place? District Disaster Management Authorities, according to recent reports, remain 'inactive or under-resourced until emergencies strike.' They operate, it seems, on an as-needed basis; the need being determined by media attention a lot more than weather forecasts. When floods arrive, meetings are convened, leaves are cancelled, and officials coordinate rescue efforts from their offices. In Buner district, where Pishwanay village was 'almost entirely wiped out', according to officials, the coordination presumably happened after the wiping out was complete. In Layyah, our revered engineering feats have set new records, albeit in the wrong direction. A newly-constructed bridge embankment, engineered to modern standards, surrendered to a mere ~300,000 cusecs of water. Local residents vividly recalled how the same area weathered ~800,000 to 1,000,000 cusecs in 2010 without incident. Progress, it appears, flows backward in Punjab. Thousands have relocated to what a report delicately termed 'under the sky'; our most democratic housing scheme yet. Punjab allocated Rs 795 billion for 'Climate Resilient' infrastructure. Gilgit-Baltistan has already accumulated Rs 20 billion in damages; an impressive national return on investment by any standard. The KP government has now allocated Rs 1.5 billion for rescue and relief, plus another Rs 1.5 billion for infrastructure restoration—money that will presumably prepare us for next year's scheduled surprise. The Prime Minister visited the National Emergencies Operation Centre. Conferences, as usual, were held. Amid this red tap-ism, the Babusar cloudburst destroyed a wheat depot, a girls' school, four bridges, and two mosques. The Met Department continues issuing warnings about heavy rains triggering floods in areas where heavy rains have always triggered floods. They've now warned Balochistan to prepare for monsoon rains from August 18-22, giving authorities ample time to not prepare. Local authorities monitor low-lying areas for potential urban flooding, though the monitoring rarely translates into prevention. Our cities' drainage systems, designed for smaller populations and simpler times, remain overwhelmed by entirely predictable monsoon patterns. The pattern of development continues unabated. Houses are built in riverbeds, environmental assessments are circumvented, and natural waterways are treated as prime real estate. When the inevitable occurs, we discuss the unprecedented nature of these very precedented disasters. In Hassanabad, where residents dismantled 10 houses pre-emptively to save them from glacial floods, we've achieved a new milestone: citizens conducting their own disaster management through architectural self-destruction. The Tarbela Dam situation illustrates our approach perfectly. Water levels approaching capacity are treated as breaking news rather than basic hydrology. We await flood waves with the surprise of those who've never consulted a calendar, despite monsoons arriving with metronomic regularity. Pakistan has become remarkably efficient at securing international assistance for disasters we're remarkably inefficient at preventing. Of the $10.99 billion pledged after the 2022 floods, we've received only $2.8 billion; just enough to ensure we'll need more pledges after the next scheduled catastrophe. Pakistan has entered 24 IMF arrangements since 1958. At current rates, we may soon have more climate loans than climate policies, more disaster frameworks than functional drains, more constitutional articles than rescued citizens. The poor, as always, bear the highest cost. They build where they can afford to build, knowing the risks because they have no alternatives. When floods come, they lose what little they have while committees debate what went wrong; the same things that went wrong last time, and the time before. In Mansehra's Dehri Haleem village, 27 souls discovered this truth when a cloudburst arrived precisely where cloudbursts have always arrived. Real solutions exist but require what we seem incapable of: sustained attention beyond crisis cycles, enforcement of existing laws, and recognition that annual disasters treated annually as surprises are neither natural nor inevitable. They are choices, made repeatedly, with predictable consequences. Our new constitutional right to a clean and healthy environment currently includes the right to drown in predictable floods, collapse with substandard housing, and wait for rescue operations that begin after the damage is done. The environment may not be clean or healthy, but it is certainly constitutional. Perhaps next year will be different. Perhaps the guidelines will be implemented, the drains will be cleared, and the warnings will be heeded. Or perhaps we'll reconvene to discuss the unprecedented nature of the monsoon that arrives, as it always has, right on schedule. With the PMD continuing to forecast heavy rainfall across the upper and central regions, one suspects divine intervention may be our most reliable disaster management strategy yet. After all, in Pakistan, some traditions are worth preserving. Even the deadly ones. Copyright Business Recorder, 2025


Business Recorder
8 hours ago
- Business Recorder
Private sector vital for economy: Aurangzeb
KARACHI: Federal Finance Minister Muhammad Aurangzeb Monday stressed that Pakistan's private sector will play the most critical role in driving the country's economy forward and ensuring sustainable development. Speaking to the media after attending the PHC Job Fair & Education Expo 3.0 at the Karachi Expo Center under the patronage of MNA Dr Ramesh Kumar Vankwani, Patron-in-Chief of the Pakistan Hindu Council (PHC). The finance minister said economic recovery cannot be achieved without private sector leadership. 'As the economy recovers and we move towards sustainable growth, the private sector will have the most important role in moving the country forward,' he noted. Pakistan poised to enter growth phase after stability, says finance minister Aurangzeb highlighted that artificial intelligence is opening new avenues for growth, but reminded that 'there is no shortcut to hard work for humans.' He emphasised tourism as a vital sector with huge untapped potential. 'People from all walks of life and religions must work together to promote tourism, as it can create countless new opportunities,' he added. During his visit to a job fair in Karachi, the minister praised the initiative, saying such events help bridge the gap between youth and employers in both government and private institutions. The minister termed the organisation of the event a welcome step. He said that initiatives like this job fair in Karachi would help young people successfully find opportunities for employment, both within the country and abroad. The finance minister emphasised that such events offer a vital platform for the youth to connect with prospective employers and secure a brighter future. Aurangzeb advised the youth that there are no shortcuts in practical life and encouraged them to embrace hard work. 'Ups and downs happen, but talent remains unaffected. We need to move toward sustainable growth,' he stated. He stressed that economic stability requires an active role from the private sector. 'I myself come from the private sector. It works 8 to 12 hours a day—it's not corporate, and that difference is noticeable,' he said. Both government and private institutions were present at the job fair, he added. Aurangzeb also credited the State Bank of Pakistan (SBP) for managing inflation effectively. 'The State Bank has controlled inflation in the best way, and the situation will improve further in the coming years,' he said. He pointed out that Pakistan has gained renewed confidence from international credit rating agencies, calling it a sign of growing stability. 'Micro-stability is creating space, and for the first time, three agencies have come together and trusted Pakistan,' the minister remarked. Aurangzeb said that the government's role is not to do business, but to create a conducive environment for it. He added that efforts will be made to further reduce the tax burden on the salaried class.


Express Tribune
12 hours ago
- Express Tribune
PAC grills Irrigation Dept over RBOD-II delay
The Sindh Assembly's Public Accounts Committee (PAC) has expressed serious concern over the non-completion of the 273-kilometre-long RBOD-II project, despite Rs40 billion already being spent. During a meeting chaired by Nisar Khuhro on Monday, the Irrigation Department admitted that work on the Rs61.985 billion project has remained stalled since 2015, even though Rs44 billion were released by the federal government between 2001 and 2017, out of which Rs40 billion have already been utilised. The department confirmed that Rs3.5 billion in funds are still available but work has not resumed due to the cancellation of the work order in 2022, removal of the consultant, and inquiries by NAB and Anti-Corruption. WAPDA officials distanced themselves from the project, clarifying that their responsibility was limited to RBOD-I and RBOD-III, which they have already completed. They stressed that RBOD-II was directly funded by the federal Ministry of Water Resources to Sindh's Irrigation Department. PAC members expressed anger over the long delay and termed it negligence by the department. Chairman Nisar Khuhro directed the Sindh Chief Secretary to ensure the Steering Committee approves the appointment of a new consultant so that work could resume. He warned that further delay would only escalate costs, calling RBOD-II a crucial project for Sindh. The committee also instructed the Irrigation Department to install a treatment plant before the zero point to protect Manchar Lake from toxic water. Officials were reminded that despite funds being available, work had not progressed, which was unacceptable. In previous sessions, NAB had clarified that land acquisition records for the project had been handed over to the deputy commissioners of Thatta and Jamshoro, and there was no bar on construction. Today's meeting also dismissed earlier objections from the Irrigation Secretary who had questioned the project's feasibility. The PAC reiterated that RBOD-II was a vital project for Sindh and directed that construction must be resumed without further delay.