
First Mining Discovers Significant New Gold Zone for Immediate Expansion at the Duparquet Gold Project Français
DUP25-059 returns 2.25 g/t Au over 12.8 m, including 4.08 g/t Au over 4.0 m
Zone 3 Exploration Update – Drilling continues to confirm the main Duparquet resource
DUP25-059 intersects 1.21 g/t Au over 60.2 m including 4.1 g/t Au over 4.3 m
VANCOUVER, BC, July 14, 2025 /CNW/ - First Mining Gold Corp. ("First Mining" or the "Company") (TSX: FF) (OTCQX: FFMGF) (FRANKFURT: FMG) is pleased to announce additional drilling results from the 2025 drilling program at its Duparquet Gold Project (" Duparquet Project" or the " Project") located in the Abitibi region of Quebec, Canada. The Company has been actively drilling with two drill rigs on the Duparquet Project since March 2025 as part of an estimated 18,000 m of drilling this year.
Highlights from the recent drilling include the newly discovered "Minuit" zone, located 75 m north of the historical Donchester Mine, that returned multiple significant intercepts in drill hole DUP25-059, highlighted by 2.25 g/t Au over 12.8 m, including 4.08 g/t Au over 4.0 m. The discovery was made via a drill hole targeting a western down-dip extension of the South Zone which successfully encountered strong mineralization within an underexplored area located approximately 75 m into the footwall of the past-producing Donchester Mine. This new discovery zone indicates significant upside potential for the Project as it geologically aligns with key supporting geoscience elements that were also encountered in prior drill hole DUP23-003 which returned 3.47 g/t Au over 7.75 m and is located 315 m to the west of DUP25-059 (Figure 1). Once modeled, these holes collectively identified a newly discovered offset gold zone that remains open for meaningful exploration growth.
In addition to the new discovery, drill hole DUP25-059 further returned an impressive intersection of 1.21 g/t Au over 60.2 m, including 4.1 g/t Au over 4.3 m, within Zone 3 of the Project's current resource area, validating large scale continuity of modelled gold mineralization striking east-west at the southern contact of the Beattie Syenite.
"Our teams continue to make new discoveries in what is perceived to be a mature, well-drilled gold project," stated Dan Wilton, CEO of First Mining. "The Duparquet Gold Project continues to demonstrate significant growth potential as our team delineates new zones of mineralization, now including Minuit, Miroir, Aiguille, Valentre, North Zone and South Zone. We see the Duparquet Gold Project emerging as one of the largest gold deposits in the Abitibi with continued room for additional resource growth adding to the attractiveness of what is already a very robust and long-lived potential project."
Assay highlights from the Zone 3 and Minuit Zone in DUP25-059 are shown in Table 1, with a full list of assays returned in Table 2 and collar details in Table 3.
Table 1: Selected Significant Drill Intercepts, 2025 Program – Minuit and Zone 3 Targets
*Reported intervals are drilled core lengths (true widths are estimated at 50 -85% of the core length interval; assay values are uncut)
Duparquet 2025 Exploration Program Update
Exploration activities are ongoing at the Duparquet Project with ~9,300 m drilled in 2025 to date, reaching the halfway mark of the proposed 18,000 m, two drill rig program for the year. Drilling activities have been focused on the resource expansion targets (Figure 2) such as the South Zone, Miroir, Aiguille, and North Zone, with additional follow-up drilling planned for Minuit as well as prospective regional targets for the remainder of the program. Regional field work programs are continuing in parallel to support further target development for future drill readiness.
Additional Details on the Minuit and Zone 3 Targets
Minuit
The "Minuit Zone" was identified during exploration efforts targeting the extension of the mineralization trend beneath the historical Donchester Mine. The historical Beattie mine operated from 1933 to 1956 and produced over 1.24 million ounces of gold at an average grade of 4.01 g/t. The historical mine consisted of three main areas - the Beattie mine, North Donchester, and South Donchester. The South Donchester area focused on the Beattie Syenite's southern mineralized zone.
Favourable mineralization was intercepted earlier than expected in DUP25-059, leading to the discovery of the new Minuit Zone, which is interpreted to be a new zone of mineralization 75 m north of the historical Donchester underground mine workings. Drill hole DUP25-059 returned 2.25 g/t Au over 12.8 m, including 4.08 g/t Au over 4.0 m, and the mineralization is hosted within a highly altered intensely silicified and mineralized syenite unit with up to 10% very fine-grained disseminated pyrite and 5% background quartz carbonate veining (Figure 3). The "Minuit syenite" unit demonstrates a similar width and bounding stratigraphy to that of the historical Donchester Mine syenite, which is bounded by intermediate to mafic volcanics.
The locality of the drilled intercept and newly discovered zone is interpreted to be due to a 45˚offsetting geological structure with a sinistral dip-slip component and offset of 75 m to the north. Minuit is located on the footwall side of this feature which is coincident with the western limits of the historical mine workings (Figures 1 and 4). The structure has been characterized as a gouge to brecciated zone with intense shearing and coincident late milky quartz veining.
The newly interpreted structure demonstrates the unlocking of a new open-ended exploration target. The target is currently interpreted to extend 315 m to the west of DUP25-059 towards DUP23-003 as the Minuit discovery hole exhibits similar host lithology setting, mineralization and structure to that intersected in DUP23-003 which returned 3.47 g/t Au over 7.75 m (Figures 1 and 4). Follow-up exploration drilling will focus on further evolving the interpretation and extent of the target up- and down-dip as well as along strike.
The purpose of drill hole DUP25-059 was to target an extension of the open-ended South Zone and even though the hole did not intersect the target at the projected position due to the unexpected offsetting structure, there is still strong evidence supporting the open-ended nature of the South Zone target on the hanging wall (west side) of the structure which will be followed up in upcoming drill programs.
Zone 3
The Zone 3 modelled resource wireframe intersected in drill hole DUP25-059 is located within the inferred category portion of the current mineral resource. Drill hole DUP25-059 returned favourable results of 1.21 g/t Au over 60.2 m, including 8.01 g/t Au over 0.5 m and including 4.1 g/t Au over 4.3 m (Figures 3 and 4). Mineralization in this intercept is hosted within moderately silica- and sericite-altered and brecciated syenite with up to 2% very fine-grained pyrite mineralization. These recent drill results further validate the current resource model and extent of continuity in mineralization that is hosted within the Duparquet Gold Project.
Table 2: Complete Assay Results from DUP25-059
*Reported intervals are drilled core lengths (true widths are estimated at 50 -85% of the core length interval; assay values are uncut)
Table 3: DUP25-059 Hole Location
Hole ID
Azimuth (°)
Dip (°)
Length (m)
Easting
Northing
DUP25-059
180
-65
729
631639
5374493
Note: Collar coordinates in UTM NAD 83 z17
About the Duparquet Gold Project
The Duparquet Project is geologically situated in the southern part of the Abitibi Greenstone Belt and is geographically located approximately 50 km north of the city of Rouyn-Noranda. The Project benefits from easy access and proximity to an existing workforce and infrastructure, including road, rail and hydroelectric grid power. The Duparquet Project currently hosts an NI 43-101 compliant gold resource of 3.44 million ounces in the Measured & Indicated category, grading 1.55 g/t Au, and an additional 2.64 million ounces in the Inferred category, grading 1.62 g/t Au. First Mining completed a Preliminary Economic Assessment 1 (" PEA") on the Project in 2023.
The Duparquet Project totals approximately 5,800 hectares focused on an area of 19 km of strike length along the prolific Destor-Porcupine Fault Zone, along with numerous mineralized splays and influential secondary lineaments. The Duparquet Project includes the past-producing Beattie, Donchester and Duquesne mines as well as the Central Duparquet, Dumico and Pitt Gold deposits.
1 Further details on the Duparquet PEA can be found in the technical report entitled "NI 43-101 Technical Report: Preliminary Economic Assessment, Duparquet Gold Project, Quebec, Canada" dated October 20, 2023, which was prepared for First Mining by G Mining Services Inc. in accordance with NI 43-101 and is available under First Mining's SEDAR+ profile at www.sedarplus.ca
Analytical Laboratory and QA/QC Procedures
All sampling completed by First Mining within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Core samples from the 2025 drilling program at Duparquet were sent to AGAT Laboratories, with sample preparation in Val d'Or, Quebec and analysis in Thunder Bay, Ontario, where they were processed for gold analysis by 50 gram fire assay with an atomic absorption finish. Samples from selected holes were sent to AGAT Laboratories in Calgary, Alberta, for multi-element analysis (including silver) by inductively coupled plasma (ICP) method with a four acid digest. AGAT Laboratories systems conform to requirements of ISO/IEC Standard 17025 guidelines and meets assay requirements outlined for NI 43-101.
Qualified Person
James Maxwell, P.Geo., VP, Exploration and Project Operations for First Mining, is a "Qualified Person" for the purposes of NI 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved the scientific and technical disclosure contained in this news release.
About First Mining Gold Corp.
First Mining is a gold developer advancing two of the largest gold projects in Canada, the Springpole Gold Project in northwestern Ontario, where we have commenced a Feasibility Study and permitting activities are on-going with a final Environmental Impact Statement / Environmental Assessment for the project submitted in November 2024, and the Duparquet Gold Project in Quebec, a PEA-stage development project located on the Destor-Porcupine Fault Zone in the prolific Abitibi region. First Mining also owns the Cameron Gold Project in Ontario and a portfolio of gold project interests including the Pickle Crow Gold Project (being advanced in partnership with Firefly Metals Ltd.) and the Hope Brook Gold Project (being advanced in partnership with Big Ridge Gold Corp.).
First Mining was established in 2015 by Mr. Keith Neumeyer, founding President and CEO of First Majestic Silver Corp.
ON BEHALF OF FIRST MINING GOLD CORP.
Daniel W. Wilton
Chief Executive Officer and Director
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this news release. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential", "possible", "strategy", "goals", "opportunities", "objectives", or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions.
Forward-looking statements in this news release relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events. All forward-looking statements are based on First Mining's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Such factors include, without limitation the Company's business, operations and financial condition potentially being materially adversely affected by the outbreak of epidemics, pandemics or other health crises, and by reactions by government and private actors to such outbreaks; risks to employee health and safety as a result of the outbreak of epidemics, pandemics or other health crises, that may result in a slowdown or temporary suspension of operations at some or all of the Company's mineral properties as well as its head office; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities, indigenous populations and other stakeholders; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; title to properties.; and the additional risks described in the Company's Annual Information Form for the year ended December 31, 2024 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at www.sedarplus.ca, and in the Company's Annual Report on Form 40-F filed with the SEC on EDGAR.
First Mining cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to First Mining, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. First Mining does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on our behalf, except as required by law.
Cautionary Note to United States Investors
The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the Canada-U.S. Multi-Jurisdictional Disclosure System, and is therefore permitted to prepare the technical information contained herein in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the securities laws currently in effect in the United States. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Cision Canada
3 hours ago
- Cision Canada
Air Canada and Air Canada Rouge Operations Remain Suspended Pending Outcome of CIRB Process
Rolling cancellations now extend to the afternoon of August 17, 2025 MONTRÉAL, August 16, 2025 /CNW/ - Air Canada today said all flights of Air Canada and Air Canada Rouge remain suspended pending the outcome of a Canada Industrial Relations Board (CIRB) process related to a directive by the Government of Canada ordering binding arbitration in the company's contract negotiations with its flight attendants. Customers whose flights are cancelled are being notified of the cancellations and offered options that include a full refund, a future travel credit or rebooking on another airline. Those whose flights are cancelled are strongly advised not to go to the airport unless they have a confirmed booking on a flight by another carrier. In response to a labour disruption by the Canadian Union of Public Employees (CUPE) that led to a strike on August 16, Air Canada has been cancelling flights on a rolling basis. At present, all flights by Air Canada and Air Canada Rouge are cancelled until the afternoon (EDT) of August 17, 2025. Air Canada Express flights operated by Jazz or PAL continue to operate as normal. Air Canada deeply regrets the disruption's impact on customers. Additional customer information, including an FAQ, is available Air Canada is Canada's largest airline, the country's flag carrier and a founding member of Star Alliance, the world's most comprehensive air transportation network. Air Canada provides scheduled service directly to more than 180 airports in Canada, the United States and Internationally on six continents. It holds a Four-Star ranking from Skytrax. Air Canada's Aeroplan program is Canada's premier travel loyalty program, where members can earn or redeem points on the world's largest airline partner network of 45 airlines, plus through an extensive range of merchandise, hotel and car rental partners. Through Air Canada Vacations, it offers more travel choices than any other Canadian tour operator to hundreds of destinations worldwide, with a wide selection of hotels, flights, cruises, day tours, and car rentals. Its freight division, Air Canada Cargo, provides air freight lift and connectivity to hundreds of destinations across six continents using Air Canada's passenger and freighter aircraft. Air Canada's climate-related ambition includes a long-term aspirational goal of net-zero greenhouse gas emissions by 2050. For additional information, please see Air Canada's TCFD disclosure. Air Canada shares are publicly traded on the TSX in Canada and the OTCQX in the US. Media Resources: Photos Videos B-Roll Articles SOURCE Air Canada


Cision Canada
10 hours ago
- Cision Canada
Statement from Minister Hajdu Français
GATINEAU, QC, Aug. 16, 2025 /CNW/ - Today, the Honourable Patty Hajdu, Minister of Jobs and Families and Minister responsible for the Federal Economic Development Agency for Northern Ontario, issued the following statement regarding the collective bargaining negotiations between Air Canada and the Canadian Union of Public Employees (CUPE): "After eight months of negotiations by the parties, and after meeting with both parties last night and urging them to work hard to reach a deal, it is disappointing to have to conclude today that Air Canada and CUPE flight attendants are at an impasse and remain unable to resolve their dispute. The government firmly believes that the best deals are reached by the parties at the bargaining table. It has now become clear that this dispute won't be resolved at the table. Canadians are increasingly finding themselves in very difficult situations and the strike is rapidly impacting the Canadian economy. Flight attendants play a critical role in keeping Canadian families and workers safe as they travel. It is important that they be compensated fairly at all times. The enormous impact of a nationwide labour disruption of this scale is already being felt by Canadians and visitors to our country. This impact will grow significantly with a prolonged dispute. This nationwide labour disruption is impeding the movement of passengers and critical cargo. In a year in which Canadian families and businesses have already experienced too much disruption and uncertainty, this is not the time to add additional challenges and disruptions to their lives and our economy. Canadians rely on air travel to connect families, workers, and communities to each other and the world. Despite significant supports from the government, these parties have been unable to resolve their differences in a timely manner. The government must act to preserve stability and supply chains in this unique and uncertain economic context. That is why I exercised my authorities under section 107 of the Canada Labour Code to direct the Canada Industrial Relations Board to arbitrate this dispute. I am exercising this authority because it is critical to maintaining and securing industrial peace, protecting Canadians and promoting conditions to resolve the dispute. Despite the parties' resolution of several key differences, the CIRB is best positioned to help them find a solution on the outstanding items. Accordingly, I have asked the Board to assist the parties in reaching a settlement of the outstanding terms of their collective agreement by imposing final and binding arbitration and to extend the terms of the existing collective agreement until a new one is determined by the arbitrator. This decision will help make sure that hundreds of thousands of Canadians and visitors to our country are not impacted because of cancelled flights. Further, the shipments of critical goods such as pharmaceuticals and organ tissue, over 40% of which are moved by Air Canada, should continue to reach their destinations. Once again, I urge the parties to work towards a fair and timely resolution."


Cision Canada
14 hours ago
- Cision Canada
Mohamed bin Zayed University of Artificial Intelligence begins new academic year with largest-ever cohort of 400+ students
ABU DHABI,UAE, Aug. 16, 2025 /CNW/ -- Mohamed bin Zayed University of Artificial Intelligence (MBZUAI) has welcomed its largest cohort for its Fall 2025 intake, enrolling 403 new students. This includes its inaugural undergraduate class, new graduate cohorts in existing programmes in Computer Science, Computer Vision, Machine Learning, Natural Language Processing, and Robotics, and the first intakes into the Master of Science in Statistics & Data Science and Master in Applied Artificial Intelligence. This semester received more than 8,000 applications across the university's Bachelor and graduate programmes, yielding an acceptance rate of 5 per cent, and reinforcing the university's prestigious position and ability to attract the best talent in the UAE and from around the world. Timothy Baldwin, MBZUAI Provost and Professor of Natural Language Processing, said: "This year, MBZUAI welcomes our largest cohort of graduate students alongside our inaugural undergraduate class. Artificial intelligence is transforming the world at a pace that vastly outstrips traditional education models. To realise its full global potential, MBZUAI invests heavily in reviewing and updating our programmes to reflect modern AI research methodology and workflows, based on our bleeding-edge AI research credentials and grounded in societal and industrial needs. As a young institution, MBZUAI has already earned a place among the world's top 10 AI universities based on our research credentials. With the introduction of our undergraduate and Master's in Applied AI programmes, we continue to build world-leading programmes aligned with the UAE's National Strategy for AI 2031 and supporting Abu Dhabi's rapidly growing AI ecosystem." The newly launched Bachelor of Science in Artificial Intelligence programme offers two streams, AI for Business and AI for Engineering, combining technical rigor with leadership, hands-on entrepreneurship, and in-situ industry experience. The first class consists of 115 undergraduate students from more than 25 countries, over 25 per cent of which are UAE Nationals. Professor Baldwin said: "The jobs of tomorrow are being shaped by AI today and we must ensure that future generations are equipped with the tools and skills to navigate that shift. Our extraordinarily talented students don't just learn about AI, but learn with it, through it, and for it. This is an extraordinary value proposition across all our programmes, but especially for our undergraduate students, who will be studying towards a bachelor's degree in AI that I believe sets a new global benchmark in terms of technical depth, real-world relevance, and the high-end AI job-readiness of the students." The key highlights for the Fall 2025 intake includes MBZUAI's total student body totaling more than 700, representing over 47 nationalities. Nationalities represented in the undergraduate programmes are Bulgaria, China, Egypt, Georgia, Greece, India, Indonesia, Kazakhstan, the UAE and the UK. Postgraduate programmes bring together students from Canada, China, Egypt, France, India, Italy, Kazakhstan, Serbia, UAE, UK, USA and Vietnam. MBZUAI continues to attract exceptional students, with 151 of the incoming graduate students (27.5 per cent) holding degrees from the world's top 100 computer science universities (CSRankings), including Cornell University, Tsinghua University, the University of Edinburgh, and the University of California, San Diego. In welcoming the new students, MBZUAI has begun its immersive Orientation Week, introducing new students to the university's culture of academic excellence, AI-driven innovation, and community engagement. The programme combines academic sessions, mentorship activities, and cultural programming celebrating UAE heritage and life in Abu Dhabi. Highlights include the Orientation Mini Fair, where internal and external partners showcase resources for academic success, career development, and student life. Orientation Week is designed to foster a strong sense of belonging and connection, laying the foundation for academic success and life-changing university experiences. For more information, visit